| CO Springs DRE | Original | A | 11/6/2026 | CHUDSPETH | CHUDSPETH | Plans have been approved. CDI fees paid on 11/6/2026 | | CO Springs DRE | 2379582 |
| CO Springs DRE | Original | D | 11/4/2026 | SSADLER | SSADLER | Citywide impact fees are due prior to building permit issuance. Contact Charla at charla.hudspeth@coloradosprings.gov
Once fees are paid, plans are approved. Proposed plans are consistent with the approved modification. All required documents are on file. | | CO Springs DRE | 2378379 |
| Energy | Original | D | 11/3/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2378092 |
| Electrical | Original | D | 11/3/2026 | DANIELG | DANIELG | The SCA and SCCR for the new cooling equipment must be on the electrical plan. for the new RTU's and the CU for the freezer and cooler. // Controlled receptacles in the break room is not clearly identified C405.11 IECC. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2378091 |
| Gas/Elec. Utils | Original | D | 11/2/2026 | CSUREVIEW | CSUREVIEW | Submit Electric Load Data Form to CSU Field Engineering. Form can be found at: https://www.csu.org/hubfs/Document-Library/ElectricLoadData.pdf?hsLang=en. @ LoadData@csu.org .CG | cgraves | Gas/Elec. Utils | 2377683 |
| Zoning/Planning | Original | / | 11/2/2026 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2377359 |
| | Original | / | 11/2/2026 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2377317 |
| | Original | / | 10/30/2026 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2377106 |
| Submittal 4 | Original | / | 10/30/2026 | MELISSAF | MELISSAF | Submittal #4 | | Submittal 4 | 2377105 |
| CO Springs Fire | Original | A | 10/22/2026 | CSFIRE | CSFIRE | CSFD FCS: You are responsible for reviewing the comments through your ACA account. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. ALL PLAN APPROVALS SUBJECT TO FINAL INSPECTION! | phil.valdez | CO Springs Fire | 2374302 |
| CO Springs DRE | Original | D | 10/16/2026 | SSADLER | SSADLER | Citywide impact fees are due prior to building permit issuance. Contact Charla at charla.hudspeth@coloradosprings.gov
Once fees are paid, plans are approved. Proposed plans are consistent with the approved modification. All required documents are on file. | | CO Springs DRE | 2371736 |
| CSU Water | Original | A | 10/13/2026 | CSUREVIEW | CSUREVIEW | Comments addressed. MLW | mlwilliams | CSU Water | 2370302 |
| CSU Waste Water | Original | A | 10/13/2026 | CSUREVIEW | CSUREVIEW | Comments addressed. MLW | mlwilliams | CSU Waste Water | 2370297 |
| Gas/Elec. Utils | Original | D | 10/13/2026 | CSUREVIEW | CSUREVIEW | • Please submit an Application for Gas Service Line Approval, as well as an Application for Elevated Pressure Approval (if needed) to Field Engineering. Forms can be found at https://www.csu.org/Pages/development-files-forms.aspx Contact Justin Noel at 719-668-4872 with questions. JSN 10.13.2026 | jsnoel | Gas/Elec. Utils | 2370211 |
| Energy | Original | D | 10/13/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2370187 |
| Electrical | Original | D | 10/13/2026 | DANIELG | DANIELG | Provide SCA and SCCR for new cooling equipment.
Comply with C405.11 IECC. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2370186 |
| Zoning/Planning | Original | / | 10/13/2026 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2370159 |
| Plumbing | Original | A | 10/13/2026 | SHANEN | SHANEN | | | Plumbing | 2370152 |
| Construction | Original | A | 10/13/2026 | JUSTINL | JUSTINL | | | Construction | 2370139 |
| Electronic Plan | Original | / | 10/13/2026 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 2370104 |
| | Original | / | 10/12/2026 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2369773 |
| | Original | / | 10/12/2026 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2369712 |
| Submittal 3 | Original | / | 10/12/2026 | TREYW | TREYW | Submittal #3 | | Submittal 3 | 2369711 |
| CO Springs Hazmat | Original | N | 10/7/2026 | CSFIRE | CSFIRE | Not Applicable - No changes to the current HAZMAT inventory. LPG remains the same amount. No significant changes to the refrigeration system. NA -FDMUS | mark.stanwood@colora | CO Springs Hazmat | 2368227 |
| CO Springs Hazmat | Original | / | 10/7/2026 | CSFIRE | CSFIRE | | mark.stanwood@colora | CO Springs Hazmat | 2368223 |
| CO Springs Fire | Original | D | 9/16/2026 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | Jacob.Watson | CO Springs Fire | 2360430 |
| CO Springs Hazmat | Original | D | 9/16/2026 | CSFIRE | CSFIRE | | Jacob.Watson | CO Springs Hazmat | 2360428 |
| CO Springs DRE | Original | D | 9/14/2026 | SSADLER | SSADLER | It appears that a modification to DEPN-25-0125 is still in review. Once it is approved, upload the final stamped plans and the approval letter. | | CO Springs DRE | 2358773 |
| Energy | Original | D | 9/9/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2357558 |
| Mechanical | Original | A | 9/9/2026 | TREVORH | TREVORH | Approved; | | Mechanical | 2357557 |
| Plumbing | Original | D | 9/9/2026 | SHANEN | SHANEN | CSU comments must be addressed. Plumbing plans must correspond with the CSU approved construction drawings. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2357525 |
| CSU Water | Original | D | 9/9/2026 | CSUREVIEW | CSUREVIEW | Approved Development Plan and CSU-approved Construction Drawings must be attached to the permit set. Contact Utilities Development Services at 719-668-8259 with any questions. DMM | dmakings | CSU Water | 2357424 |
| CSU Waste Water | Original | D | 9/9/2026 | CSUREVIEW | CSUREVIEW | Approved Development Plan and CSU-approved Construction Drawings must be attached to the permit set. Contact Utilities Development Services at 719-668-8259 with any questions. DMM | dmakings | CSU Waste Water | 2357423 |
| Electronic Plan | Original | / | 9/9/2026 | SHANEN | SHANEN | In Current Review by SHANEN | | Electronic Plan | 2357332 |
| Gas/Elec. Utils | Original | D | 9/8/2026 | CSUREVIEW | CSUREVIEW | Approved Development Plan must be attached to the permit set. Contact Utilities Development Services at 719-668-8259 with any questions.
Submit Electric Load Data Form to CSU Field Engineering. Form can be found at: https://www.csu.org/hubfs/Document-Library/ElectricLoadData.pdf?hsLang=en MJG | jreuter@csu.org | Gas/Elec. Utils | 2357280 |
| Electrical | Original | D | 9/8/2026 | DANIELG | DANIELG | Provide SCA and SCCR for new cooling equipment.
Comply with C405.11 IECC. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2357138 |
| Zoning/Planning | Original | / | 9/8/2026 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2357130 |
| Construction | Original | D | 9/8/2026 | JUSTINL | JUSTINL | IECC document not provided when plans were resubmitted. This must be provided giving a breakdown in compliance method, additional energy efficiency option(s) and insulation values. See code study form and architectural plans for review comments. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2357095 |
| Electronic Plan | Original | / | 9/8/2026 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 2357031 |
| Submittal 2 | Original | / | 9/4/2026 | MELISSAF | MELISSAF | Submittal #2 | | Submittal 2 | 2356758 |
| CO Springs Fire | Original | D | 3/17/2026 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | chiptaylor | CO Springs Fire | 2281346 |
| CO Springs Hazmat | Original | D | 3/17/2026 | CSFIRE | CSFIRE | | chiptaylor | CO Springs Hazmat | 2281344 |
| CO Springs DRE | Original | D | 3/10/2026 | SSADLER | SSADLER | It appears that a modification to DEPN-25-0125 is still in review. Once it is approved, upload the final stamped plans and the approval letter. | | CO Springs DRE | 2278155 |
| Energy | Original | D | 3/10/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2278091 |
| Mechanical | Original | D | 3/10/2026 | TREVORH | TREVORH | Disapproved; Need to see Construction and Plumbing Review comments Addressed * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2278090 |
| Plumbing | Original | D | 3/10/2026 | SHANEN | SHANEN | Provide roof plan to show sizing for roof drain conductors, downspouts and overflow scuppers. Provide gpm and/or square footage served by components of the roof drain system.Not all required roof drainage information was provided on the architectural plans. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2277977 |
| Zoning/Planning | Original | / | 3/9/2026 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2277885 |
| Electrical | Original | D | 3/9/2026 | DANIELG | DANIELG | * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2277797 |
| CSU Water | Original | D | 3/9/2026 | CSUREVIEW | CSUREVIEW | Requires approved development plan and approved Utility Service Plan (USP) for new wastewater service line outside of building. Call UDS at 719-668-8259 with questions.MDA | malcuran | CSU Water | 2277793 |
| CSU Waste Water | Original | D | 3/9/2026 | CSUREVIEW | CSUREVIEW | Requires approved development plan and approved Utility Service Plan (USP) for new wastewater service line outside of building. Call UDS at 719-668-8259 with questions.MDA | malcuran | CSU Waste Water | 2277792 |
| Gas/Elec. Utils | Original | D | 3/9/2026 | CSUREVIEW | CSUREVIEW | Requires approved development plan and approved Utility Service Plan (USP) for new wastewater service line outside of building. Call UDS at 719-668-8259 with questions.MDA | malcuran | Gas/Elec. Utils | 2277791 |
| Electronic Plan | Original | / | 3/9/2026 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 2277753 |
| Construction | Original | D | 3/9/2026 | JUSTINL | JUSTINL | See code study form, architectural, structural and IECC documents for review comments. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2277746 |
| Energy | Original | / | 3/9/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2277624 |
| Electronic Plan | Original | / | 3/9/2026 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 2277461 |
| Enumeration | Original | N | 2/17/2026 | BECKYA | BECKYA | | | Enumeration | 2267408 |
| Electronic Plan | Original | / | 2/17/2026 | BECKYA | BECKYA | In Current Review by BECKYA | | Electronic Plan | 2267398 |
| | Original | / | 2/17/2026 | SYSTEM | SYSTEM | Plan Review fees paid 02/17/2026 for plan submitted 02/17/2026. Submit Date updated to now. Plan now open for review. | | | 2267381 |
| Energy | Original | / | 2/17/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2267218 |
| Floodplain | Original | N | 2/17/2026 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6301405002) | | Floodplain | 2267217 |