| Energy | Original | D | 5/11/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2305364 |
| Mechanical | Original | D | 5/11/2026 | TREVORH | TREVORH | Disapproved; Still Need to see Disapproval comments addressed from the 9-26 Mechanical review * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2305363 |
| Electrical | Original | D | 5/11/2026 | CONNERM | CONNERM | If equipment is being relocated than conductors and grounding is no longer "Existing". Please provide conductor and ground size, type, and quantity for relocated equipment
Provide fault current information in tabular form for all refed air conditioning and refrigeration equipment * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2305357 |
| Electronic Plan | Original | / | 5/11/2026 | CONNERM | CONNERM | In Current Review by CONNERM | | Electronic Plan | 2305286 |
| Plumbing | Original | D | 5/8/2026 | SHANEN | SHANEN | 4/8/26 disapproval comments not addressed. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2305200 |
| Construction | Original | D | 5/8/2026 | SHELLEY | SHELLEY | Still need clarification on separated occupancies. Would not be applicable for an unlimited area building. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2305187 |
| Enumeration | Original | D | 5/8/2026 | BRENT | BRENT | Per address change dated 12/14/2007, the address of 3650 Austin Bluffs Pkwy was eliminated, and re-addressed as 3630 Austin Bluffs Pkwy. The addressing onsite on both the east and south side shows the 3630 address, and the fire alarm panel room shows that there are Suites 180 and 190 at the 3630 address that should have been used . One comment on the address change showed that the suite numbering wasn't changed as it was supposed to be on the doors. Update the plan pages to show the address of 3630 Austin Bluffs Pkwy. Suite 180 for the new tenant space and Suite 190 for the former 24 hour fitness space. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Enumeration | 2304992 |
| Electronic Plan | Original | / | 5/8/2026 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 2304945 |
| Submittal 2 | Original | / | 5/8/2026 | NICOLASV | NICOLASV | Submittal #2 | | Submittal 2 | 2304879 |
| CO Springs Fire | Original | D | 4/24/2026 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | Jacob.Watson | CO Springs Fire | 2298552 |
| CO Springs Hazmat | Original | N | 4/24/2026 | CSFIRE | CSFIRE | NA | Jacob.Watson | CO Springs Hazmat | 2298551 |
| Energy | Original | D | 4/9/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2291075 |
| Mechanical | Original | D | 4/9/2026 | TREVORH | TREVORH | Disapproved; Need to remove plumbing and Fire sprinkler scope from the mechanical plans * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2291074 |
| Electrical | Original | D | 4/8/2026 | CONNERM | CONNERM | Clearly identify all equipment under scope of work.
Identify equipment as new, existing, or relocated
Provide one-line diagram
Provide fault current information (SCCR, AIC, SCA) at all of the following locations. 1. All new panelboards and switchboards 2. All new transfer equipment 3. All new industrial control panels 4. All new air conditioning and refrigeration equipment 5. At any of the above locations when refed
Provide a note on the plans indicating that the Electrical design has a maximum volt drop of 5% per C405.10
The following general note must be included on the electrical plans: “A Final Commissioning Report shall be delivered to the building owner per section C408.2.5 of the 2021 IECC.”
Review stopped. Complete re-review will be required once corrections are made. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2290322 |
| Electronic Plan | Original | / | 4/8/2026 | CONNERM | CONNERM | In Current Review by CONNERM | | Electronic Plan | 2290280 |
| CSU Water | Original | N | 4/8/2026 | CSUREVIEW | CSUREVIEW | No plumbing scope of work. MLW | mlwilliams | CSU Water | 2290221 |
| CSU Waste Water | Original | N | 4/8/2026 | CSUREVIEW | CSUREVIEW | No plumbing scope of work. MLW | mlwilliams | CSU Waste Water | 2290215 |
| Plumbing | Original | D | 4/8/2026 | SHANEN | SHANEN | Construction review comments must be addressed to verify occupant load. Provide plumbing plans for indicated plumbing scope. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2290174 |
| Construction | Original | D | 4/7/2026 | SHELLEY | SHELLEY | Too many items, see plan * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2290060 |
| Electronic Plan | Original | / | 4/6/2026 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Electronic Plan | 2289548 |
| Enumeration | Original | D | 3/27/2026 | BRENT | BRENT | The address shown on the plan pages does not match the location shown on the site plan. Update all plan pages and the code study form to show the correct address. Since this plan will create new tenant spaces, the interior site plan needs to show proposed secondary addressing, for all tenant spaces at this address, which follows the PPRBD secondary addressing guidelines available on our website. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Enumeration | 2285709 |
| Electronic Plan | Original | / | 3/27/2026 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 2285689 |
| | Original | / | 3/27/2026 | SYSTEM | SYSTEM | Plan Review fees paid 03/27/2026 for plan submitted 03/13/2026. Submit Date updated to now. Plan now open for review. | | | 2285674 |
| Energy | Original | / | 3/13/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2279873 |
| Floodplain | Original | N | 3/13/2026 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6327121028) | | Floodplain | 2279872 |