| Mechanical | Original | A | 7/27/2026 | TREVORH | TREVORH | Approved; | | Mechanical | 2339355 |
| CSU Water | Original | D | 7/23/2026 | CSUREVIEW | CSUREVIEW | See previous comments. New backflow devise proposed requires submittal of a Backflow Assembly Plan Review Form to determine if the service backflow prevention meets Standards. Form can be found at: https://www.csu.org/Documents/DomesticAssembly.pdf?csf=1&e=KLQNrS
***Form must be submitted to crossconnection@csu.org. Contact Utilities Development Services at 719-668-8259 with any questions.*** PSD | PDosch | CSU Water | 2338071 |
| Plumbing | Original | D | 7/23/2026 | SHANEN | SHANEN | All plumbing fixtures must be listed with manufacturer model number per PPRBD plan review requirements. See fixture schedule. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2338054 |
| Electrical | Original | A | 7/23/2026 | DANIELG | DANIELG | | | Electrical | 2338015 |
| Zoning/Planning | Original | / | 7/23/2026 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2338009 |
| Construction | Original | A | 7/23/2026 | BPHILLIPS | BPHILLIPS | | | Construction | 2337993 |
| Electronic Plan | Original | / | 7/23/2026 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2337987 |
| Submittal 2 | Original | / | 7/23/2026 | MELISSAF | MELISSAF | Submittal #2 | | Submittal 2 | 2337955 |
| CO Springs Hazmat | Original | A | 7/21/2026 | CSFIRE | CSFIRE | HAZMAT DFM-C-CG-26-00033 Deferred Submittal for MED GAS - Requires an ASSE 6060 Design Professional to submit a complete MED GAS review through the Accela ACA portal. No inspections or TCO will be given prior to the MED GAS permit being issued. Submit under DFM-C-CG-26-00033 CSFD DFM You are responsible for reviewing the comments through your ACA account. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources. If you do not have an ACA account at the time of CSFD review, you will need to reach out to the CSFD DFM staff to link the review to your account. ALL PLAN APPROVALS SUBJECT TO FINAL INSPECTION! | mark.stanwood@colora | CO Springs Hazmat | 2337269 |
| CO Springs Hazmat | Original | / | 7/21/2026 | CSFIRE | CSFIRE | | mark.stanwood@colora | CO Springs Hazmat | 2337266 |
| CO Springs Hazmat | Original | D | 7/14/2026 | CSFIRE | CSFIRE | DFM-C-CG-26-00033 Need a complete med gas submission - Must be submitted by a 6060 design professional. Need all specification cut sheets. You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | mark.stanwood@colora | CO Springs Hazmat | 2334103 |
| CO Springs Fire | Original | A | 6/17/2026 | CSFIRE | CSFIRE | CSFD FCS: You are responsible for reviewing the comments through your ACA account. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. ALL PLAN APPROVALS SUBJECT TO FINAL INSPECTION! | Jacob.Watson | CO Springs Fire | 2323071 |
| Mechanical | Original | D | 6/2/2026 | TREVORH | TREVORH | Disapproved; Preliminary Review, Need to see construction review comments addressed with regards to rated partition types * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2315523 |
| CO Springs DRE | Original | A | 6/1/2026 | SSADLER | SSADLER | Commercial interior remodel approved. No changes to use, landscaping, footprint, or parking. No exterior changes approved with this permit. | | CO Springs DRE | 2314632 |
| CSU Waste Water | Original | N | 5/29/2026 | CSUREVIEW | CSUREVIEW | No new wastewater service outside of building. SSH | SHillman | CSU Waste Water | 2314167 |
| CSU Water | Original | D | 5/29/2026 | CSUREVIEW | CSUREVIEW | Requires submittal of a Backflow Assembly Plan Review Form to determine if the service backflow prevention meets Standards. Form can be found at: https://www.csu.org/Documents/DomesticAssembly.pdf?csf=1&e=KLQNrS
***Form must be submitted to crossconnection@csu.org. Contact Utilities Development Services at 719-668-8259 with any questions.*** SSH | SHillman | CSU Water | 2314163 |
| Electrical | Original | D | 5/29/2026 | DANIELG | DANIELG | * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2313918 |
| Electronic Plan | Original | / | 5/29/2026 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 2313859 |
| Plumbing | Original | D | 5/29/2026 | SHANEN | SHANEN | Show compliance with commercial plumbing plan review additional requirements for 2021 IECC. Provide required water pipe size analysis data, see 2021 IPC appendix E. Data may be calculated from the point of connection. All plumbing fixtures must be listed with manufacturer model numbers per PPRBD plumbing plan review requirements. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2313840 |
| Electronic Plan | Original | / | 5/28/2026 | CONNERM | CONNERM | In Current Review by CONNERM | | Electronic Plan | 2313725 |
| Zoning/Planning | Original | / | 5/28/2026 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2313702 |
| Construction | Original | D | 5/28/2026 | BPHILLIPS | BPHILLIPS | See plan * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2313675 |
| Energy | Original | N | 5/28/2026 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 2313535 |
| Electronic Plan | Original | / | 5/28/2026 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2313429 |
| Enumeration | Original | N | 5/13/2026 | BECKYA | BECKYA | | | Enumeration | 2306823 |
| Electronic Plan | Original | / | 5/13/2026 | BECKYA | BECKYA | In Current Review by BECKYA | | Electronic Plan | 2306810 |
| | Original | / | 5/13/2026 | SYSTEM | SYSTEM | Plan Review fees paid 05/13/2026 for plan submitted 05/11/2026. Submit Date updated to now. Plan now open for review. | | | 2306808 |
| Energy | Original | / | 5/11/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2305505 |
| Floodplain | Original | N | 5/11/2026 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6408423013) | | Floodplain | 2305503 |