| Electrical | Original | A | 7/13/2026 | CONNERM | CONNERM | | | Electrical | 2333352 |
| Electronic Plan | Original | / | 7/13/2026 | CONNERM | CONNERM | In Current Review by CONNERM | | Electronic Plan | 2333338 |
| Enumeration | Original | A | 7/13/2026 | AMY | AMY | | | Enumeration | 2333331 |
| Electronic Plan | Original | / | 7/13/2026 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2333325 |
| Submittal 3 | Original | / | 7/10/2026 | MELISSAF | MELISSAF | Submittal #3 | | Submittal 3 | 2333132 |
| CO Springs Hazmat | Original | A | 7/10/2026 | CSFIRE | CSFIRE | DFM-C-SV-26-00012 CSFD DFM You are responsible for reviewing the comments through your ACA account. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources. If you do not have an ACA account at the time of CSFD review, you will need to reach out to the CSFD DFM staff to link the review to your account. DFM Plan Review Fee: $296.00 ALL PLAN APPROVALS SUBJECT TO FINAL INSPECTION! | mark.stanwood@colora | CO Springs Hazmat | 2333015 |
| CO Springs DRE | Original | A | 6/29/2026 | SSADLER | SSADLER | Approved for commercial flush mounted solar. There is no increase to existing building height. | | CO Springs DRE | 2328076 |
| Zoning/Planning | Original | / | 6/29/2026 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2327865 |
| Electrical | Original | D | 6/26/2026 | CONNERM | CONNERM | Provide method of module grounding (methods of grounding used to fasten modules must be listed by an NRTL) * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2327646 |
| Construction | Original | A | 6/26/2026 | SHELLEY | SHELLEY | | | Construction | 2327580 |
| Enumeration | Original | A | 6/26/2026 | AMY | AMY | | | Enumeration | 2327499 |
| Electronic Plan | Original | / | 6/26/2026 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2327496 |
| Submittal 2 | Original | / | 6/26/2026 | MELISSAF | MELISSAF | Submittal #2 | | Submittal 2 | 2327438 |
| CO Springs Hazmat | Original | D | 6/10/2026 | CSFIRE | CSFIRE | DFM-C-SV-26-00012 1205.3.1 Perimeter pathways. There shall be a minimum 6-foot-wide (1829 mm) clear perimeter around the edges of the roof. Exception: Where either axis of the building is 250 feet (76 200 mm) or less, the clear perimeter around the edges of the roof shall be permitted to be reduced to a minimum width of 4 feet (1219 mm). You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | mark.stanwood@colora | CO Springs Hazmat | 2319137 |
| CO Springs Fire | Original | N | 6/9/2026 | CSFIRE | CSFIRE | No Fire Final
HAZ-MAT REVIEW REQUIRED Based upon the information provided, a hazardous materials review is required. Your plans have been forwarded to the HazMat reviewer. | Jacob.Watson | CO Springs Fire | 2318309 |
| CO Springs DRE | Original | D | 5/28/2026 | SSADLER | SSADLER | Provide elevation drawings to show that the height of the building with panel will not exceed the max allowed height for the zone district. | | CO Springs DRE | 2313582 |
| Zoning/Planning | Original | / | 5/27/2026 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2312945 |
| Electrical | Original | D | 5/26/2026 | CONNERM | CONNERM | Please provide only technical spec sheets, don't include installation instructions
Provide spec sheets for inverters
CSU requires production meter to be after the non-fused AC disconnect * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2311777 |
| Electronic Plan | Original | / | 5/26/2026 | CONNERM | CONNERM | In Current Review by CONNERM | | Electronic Plan | 2311755 |
| Construction | Original | A | 5/26/2026 | SHELLEY | SHELLEY | | | Construction | 2311602 |
| Electronic Plan | Original | / | 5/26/2026 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Electronic Plan | 2311598 |
| Enumeration | Original | A | 5/15/2026 | AMY | AMY | The city is shown as Denver on the Code Study Form. This was corrected. The box was checked for this project being a complete building. This was crossed out on the Code Study form as well. If these sheets get changed out, correct this information. | | Enumeration | 2307959 |
| Electronic Plan | Original | / | 5/15/2026 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2307937 |
| Energy | Original | N | 5/14/2026 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 2307697 |
| Floodplain | Original | N | 5/14/2026 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6417301032) | | Floodplain | 2307696 |