| CO Springs Fire | Original | D | 8/12/2026 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | Jacob.Watson | CO Springs Fire | 2346818 |
| CO Springs Hazmat | Original | N | 8/12/2026 | CSFIRE | CSFIRE | NA | Jacob.Watson | CO Springs Hazmat | 2346815 |
| Energy | Original | D | 8/11/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2345802 |
| Mechanical | Original | D | 8/11/2026 | TREVORH | TREVORH | Disapproved; Need to show Refrigeration routing on plans, See also The 2021 IMC section 1109.2.5 and the 2021 IBC section 713 * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2345801 |
| Electronic Plan | Original | / | 8/10/2026 | TREVORH | TREVORH | In Current Review by TREVORH | | Electronic Plan | 2345722 |
| EPC Health Dept | Original | D | 8/6/2026 | HEALTHDEPT | HEALTHDEPT | Construction activity permit required for projects earthmoving > 1 acre. If the entire project is > 1 acre earthmoving, regardless of being submitted in phases and/or separate building permits, a construction activity permit will be required. Information and application may be accessed online at https://www.elpasocountyhealth.org/licenses-permits-inspections-water-testing/construction-land-use/construction-activity-permit/. Please submit all applications through https://myhealthdepartment.com/EPCPH. For questions, contact Environmental Health at 719-578-3199 option 3. KB. | KBauer | EPC Health Dept | 2344345 |
| Electrical | Original | D | 8/3/2026 | BERTHA | BERTHA | Pending approval in Enumerations - Multi-meter services must include a list of enumerated addresses on the one-line diagram - Secondary addressing must be approved by Enumerations.
Provide all conductor, size, type and quantity.
Provide fault current information (SCCR, AIC, SCA) in tabular format at all of the following locations. 1. All new panelboards and switchboards 2. All new transfer equipment 3. All new industrial control panels 4. All new air conditioning and refrigeration equipment 5. At any of the above locations when refed
Clarify amperage of panels.
Provide panel and circuit number on all electrical equipment
Provide information / plans for the scope of work only. Remove all information / plans that does not pertain to this scope of work with the exception of the EV site plan.
Provide a uniform EV site plan for each submittal. The EV site plan must clearly indicate the location and type of EV spot. The EV site plan must indicate at the minimum the same number of spots as indicated on the Development Plan.
Lighting controls must be clearly shown and must comply with C405.2 (Interior), C405.2.7 (Exterior), and C405.2.8 (Parking Garages), where applicable.
Provide a note on the plans indicating that the Electrical design has a maximum volt drop of 5% per C405.10.
The following general note must be included on the electrical plans: “A Final Commissioning Report shall be delivered to the building owner per section C408.2.5 of the 2021 IECC.”
Complete re-review necessary.
. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2342363 |
| CO Springs DRE | Original | D | 7/30/2026 | SSADLER | SSADLER | Upload the final approved landscaping and irrigation plans. Upload the final recorded plat. City wide impact fees are due prior to building permit issuance.
Due to policy changes, assurances for private improvements are now due at the time of C/O | | CO Springs DRE | 2341366 |
| City Engr | Original | D | 7/29/2026 | JDAGNILLO | JDAGNILLO | Submit all public street and public drainage financial assurances for Lakeside Heights at Wolf Ranch Fil. 1 to Andrea.Acker@coloradosprings.gov, then building permit can be approved by City Engineering. In addition, public street construction plans must be submitted separately to Engineering Development Review and Traffic Engineering and reviewed/approved prior to beginning of construction of all public right-of-way improvements. Thank you. | | City Engr | 2340786 |
| Elevators | Original | N | 7/29/2026 | JOHN | JOHN | No elevator in building | | Elevators | 2340516 |
| Stormwater | Original | D | 7/29/2026 | JDUNCAN | JDUNCAN | Upload approved SWENT GEC Plan and provide Accela GEC Permit number. JMD | | Stormwater | 2340391 |
| CSU Contract Admin. | Original | D | 7/28/2026 | CSUAPPSPRM | CSUAPPSPRM | Requires submittal and approval of Commercial Water Meter Sizing Form (CWMSF) and payment of development charges/fees. CWMSF available at https://www.csu.org/CSUDocuments/watermetersizingforminteractive.pdf. Contact Customer Contract Administration at 719-668-8111 for more information. JMD | jdemello | CSU Contract Admin. | 2340193 |
| CSU Water | Original | D | 7/28/2026 | CSUREVIEW | CSUREVIEW | Requires CSU-approved wastewater and water mainline Construction Drawings (CD's) and/or approved Utility Service Plan (USP). Call UDS at 719-668-8259 with questions. Refer to the current Colorado Springs Utilities WaterLESS details B4-1 through B4-8 and select the correct meter detail to include on the plumbing plans after approval of the Commercial Water Meter Sizing Form. Also refer to details B4-16 through B4-22 and select an appropriate meter clearance detail to include on the plumbing plans.MDA | malcuran | CSU Water | 2340178 |
| CSU Waste Water | Original | D | 7/28/2026 | CSUREVIEW | CSUREVIEW | Requires CSU-approved wastewater and water mainline Construction Drawings (CD's) and/or approved Utility Service Plan (USP). Call UDS at 719-668-8259 with questions.MDA | malcuran | CSU Waste Water | 2340162 |
| Gas/Elec. Utils | Original | D | 7/28/2026 | CSUREVIEW | CSUREVIEW | Requires CSU-approved wastewater and water mainline Construction Drawings (CD's) and/or approved Utility Service Plan (USP). Call UDS at 719-668-8259 with questions.MDA | malcuran | Gas/Elec. Utils | 2340161 |
| Zoning/Planning | Original | / | 7/28/2026 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2340074 |
| Construction | Original | D | 7/28/2026 | JUSTINL | JUSTINL | See architectural, structural, accessibility and IECC documents for review comments. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2339992 |
| Energy | Original | / | 7/27/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2339596 |
| Plumbing | Original | D | 7/27/2026 | SHANEN | SHANEN | Preliminary review. Construction review must be performed. All gas piping related items shall be on the mechanical plans.Remove all references to gas piping from the plumbing plans and provide on the mechanical plans. Provide a piping materials schedule on the plumbing plans per PPRBD plan review requirements. Show compliance with commercial plumbing plan review additional requirements for 2021 IECC. See link: https://www.pprbd.org/File/ByAlias/PlumbingReview All plumbing fixtures must be scheduled with manufacturer model numbers per PPRBD commercial plumbing plan review requirements. Provided water pipe size analysis data is incomplete. Data must include: service pressure, service size, meter size, pressure loss, available pressure, distribution size, WSFU served, developed length, etc. CSU approved construction drawings and utility service plan required to verify the plumbing plans correspond with the CSU approved plans for water service sizing, water entry location, building drain sizing, building drain location, etc. 1/2"HW is undersized to serve downstream fixtures. Make corrections on all applicable unit plans. Show HWS/HWR on unit plans. Show keynote 15 on all unit plans. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2339273 |
| Electronic Plan | Original | / | 7/27/2026 | SHANEN | SHANEN | In Current Review by SHANEN | | Electronic Plan | 2339197 |
| Electronic Plan | Original | / | 7/15/2026 | BERTHA | BERTHA | In Current Review by BERTHA | | Electronic Plan | 2334823 |
| Electronic Plan | Original | / | 7/13/2026 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 2333735 |
| Floodplain | Original | N | 7/10/2026 | BECKYA | BECKYA | | | Floodplain | 2333144 |
| Enumeration | Original | D | 7/10/2026 | BECKYA | BECKYA | Final plat for Lakeside Heights at Wolf Ranch Fil. No. 1 has not been recorded. Enumerations approval pending receipt in our office of a copy of the final recorded plat. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Enumeration | 2333141 |
| Electronic Plan | Original | / | 7/10/2026 | BECKYA | BECKYA | In Current Review by BECKYA | | Electronic Plan | 2333061 |
| | Original | / | 7/9/2026 | SYSTEM | SYSTEM | Plan Review fees paid 07/09/2026 for plan submitted 07/01/2026. Submit Date updated to now. Plan now open for review. | | | 2332770 |