| Fountain Fire | Original | D | 11/16/2026 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | Jacob.Watson | Fountain Fire | 2382918 |
| Fountain Hazmat | Original | D | 11/16/2026 | CSFIRE | CSFIRE | See Fire Comments | Jacob.Watson | Fountain Hazmat | 2382917 |
| Fountain Zoning | Original | D | 11/16/2026 | ZONINGF | ZONINGF | Plans marked disapproved pending payment of applicable fees to the City of Fountain. KM | KMartinez | Fountain Zoning | 2382697 |
| Energy | Original | D | 11/13/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2382366 |
| Mechanical | Original | D | 11/13/2026 | TREVORH | TREVORH | Disapproved; Need to provide the Ventilation schedule * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2382365 |
| CSU Contract Admin. | Original | N | 11/12/2026 | CSUAPPSPRM | CSUAPPSPRM | No applicable fees due this plan set. JMD | jdemello | CSU Contract Admin. | 2381631 |
| Electrical | Original | D | 11/10/2026 | CONNERM | CONNERM | Provide calculated demand load of panels in amps
Lighting controls must be clearly shown and must comply with C405.2 (Interior)
Controlled receptacles must be shown on the plan per C405.11 OR have approved AM&M
Provide a note on the plans indicating that the Electrical design has a maximum volt drop of 5% per C405.10.
The following general note must be included on the electrical plans: “A Final Commissioning Report shall be delivered to the building owner per section C408.2.5 of the 2021 IECC.” * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2380718 |
| Plumbing | Original | D | 11/10/2026 | SHANEN | SHANEN | Schedule the required service sink. Show location of and piping for the required service sink. All gas piping related items must be on the mechanical plans. Remove all references to gas piping from the plumbing plans. Provide sizing for each branch of the water distribution system serving multiple fixtures. Lavatories must show compliance with 2021 IECC section C404.5.1. Compliance with 2021 IPC and CO state amendments to 2021 IPC must be stated on the plumbing plans. Show compliance with commercial plumbing plan review additional requirements for 2021 IECC. Provide required water pipe size analysis data, see 2021 IPC appendix E. Data must include: service pressure, service size, meter size, pressure loss, available pressure, distribution size, WSFU served, developed length, etc. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2380681 |
| Gas/Elec. Utils | Original | A | 11/10/2026 | CSUREVIEW | CSUREVIEW | CSU Field Engineer to determine final gas/electric meter, transformer and service line locations. Contact Field Engineering at 719-668-4985 (Gas) or 719-668-5564 (Electric) with any questions. JSN 11.10.2026 | jsnoel | Gas/Elec. Utils | 2380668 |
| Electronic Plan | Original | / | 11/10/2026 | CONNERM | CONNERM | In Current Review by CONNERM | | Electronic Plan | 2380656 |
| Construction | Original | D | 11/10/2026 | BPHILLIPS | BPHILLIPS | Life safety plan, accessibility * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2380646 |
| Energy | Original | / | 11/10/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2380365 |
| Electronic Plan | Original | / | 11/9/2026 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2380157 |
| Enumeration | Original | D | 11/9/2026 | BRENT | BRENT | Which secondary address will this tenant space use? This proposed suite occupies multiple suites as shown on the core and shell plan. The applicant needs to pick a suite number to use and show that suite number anywhere the address appears in this plan. Show secondary addressing for this building on the site plan. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Enumeration | 2380097 |
| Electronic Plan | Original | / | 11/9/2026 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 2380088 |
| Submittal 2 | Original | / | 11/9/2026 | MELISSAF | MELISSAF | Submittal #2 | | Submittal 2 | 2380074 |
| Plan Coordinator (Main) | Original | D | 7/8/2026 | BRENT | BRENT | Disapprove all remaining departments. No building permit his been issued for the core and shell building. Interior finish plans cannot be submitted prior to a permit being issued for the core and shell building. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plan Coordinator (Main) | 2331784 |
| Electronic Plan | Original | / | 7/8/2026 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 2331771 |
| | Original | / | 7/8/2026 | SYSTEM | SYSTEM | Plan Review fees paid 07/08/2026 for plan submitted 07/08/2026. Submit Date updated to now. Plan now open for review. | | | 2331638 |
| Stormwater | Original | / | 7/8/2026 | SYSTEM | SYSTEM | You will need to contact Stormwater department for approval prior to permit. This department will not review the plan electronically. | | Stormwater | 2331628 |
| Energy | Original | / | 7/8/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2331627 |
| Floodplain | Original | N | 7/8/2026 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6504311007) | | Floodplain | 2331626 |