| Energy | Original | D | 10/19/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2372752 |
| Mechanical | Original | D | 10/19/2026 | TREVORH | TREVORH | Disapproved; Need to schedule all New as well as all existing equipment for a change of occupancy and Include the Ventilation schedule * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2372751 |
| CO Springs DRE | Original | D | 10/16/2026 | SSADLER | SSADLER | On the code study form list the previous business that occupied the space. | | CO Springs DRE | 2371935 |
| CSU Water | Original | N | 10/14/2026 | CSUREVIEW | CSUREVIEW | No new water service outside of building.MDA | malcuran | CSU Water | 2371024 |
| CSU Waste Water | Original | N | 10/14/2026 | CSUREVIEW | CSUREVIEW | No new wastewater service outside of building. MDA | malcuran | CSU Waste Water | 2371023 |
| Plumbing | Original | D | 10/14/2026 | SHANEN | SHANEN | Clarify water heater shelf as a water heater support stand is scheduled but per architectural plans the water heater is mounted above the ceiling. Provide a piping materials schedule on the plumbing plans per PPRBD plumbing plan review requirements. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2370852 |
| Electrical | Original | D | 10/14/2026 | DANIELG | DANIELG | Due to the change in occupancy existing/new devices must comply with C405.2 and C405.11 IECC.//The following general note must be included on the electrical plans: “A Final Commissioning Report shall be delivered to the building owner per section C408.2.5 of the 2021 IECC.”
* Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2370803 |
| Electronic Plan | Original | / | 10/14/2026 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 2370795 |
| Zoning/Planning | Original | / | 10/14/2026 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2370787 |
| Construction | Original | D | 10/14/2026 | BPHILLIPS | BPHILLIPS | Accessible route, IECC * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2370781 |
| Electronic Plan | Original | / | 10/13/2026 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2370145 |
| Enumeration | Original | D | 10/9/2026 | AMY | AMY | Add the adjacent addresses to the tenant location map from the Core & Shell plan. Is this tenant taking up two spaces? By adding this addresses this will be made clear. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Enumeration | 2369051 |
| Electronic Plan | Original | / | 10/9/2026 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2369024 |
| | Original | / | 10/8/2026 | SYSTEM | SYSTEM | Plan Review fees paid 10/08/2026 for plan submitted 10/08/2026. Submit Date updated to now. Plan now open for review. | | | 2368814 |
| Energy | Original | / | 10/8/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2368775 |
| Floodplain | Original | N | 10/8/2026 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6220002022) | | Floodplain | 2368772 |