Required Departments: 5
|
|
|
Log Entries: 13
|
|
Mechanical | Original | A | 8/18/2004 | RUSSELL | RUSSELL | Revised gas piping | | Mechanical | 204838 | Out to Review | Original | A | 6/17/2004 | TERRY | TERRY | | | Out to Review | 204842 | Electrical | Original | A | 6/17/2004 | TERRY | TERRY | | | Electrical | 204834 | Construction | Original | A | 6/10/2004 | SEAN | SEAN | | | Construction | 204832 | Plumbing | Original | A | 6/10/2004 | RUSSELL | RUSSELL | | | Plumbing | 204843 | Mechanical | Original | A | 6/10/2004 | RUSSELL | RUSSELL | | | Mechanical | 204837 | Out to Review | Original | A | 6/4/2004 | SHELLEY | SHELLEY | rob phelps, 214-906-3495 | | Out to Review | 204841 | Electrical | Original | D | 5/28/2004 | JERRY | JERRY | load calculations for entire service,energy code calculations | | Electrical | 204835 | Out to Review | Original | A | 5/27/2004 | JERRY | JERRY | jerry | | Out to Review | 204840 | Plumbing | Original | D | 5/26/2004 | RUSSELL | RUSSELL | See plans for comments | | Plumbing | 204844 | Mechanical | Original | D | 5/26/2004 | RUSSELL | RUSSELL | See plans for comments | | Mechanical | 204839 | Fire | Original | N | 5/25/2004 | SEAN | SEAN | LSP | | Fire | 204836 | Construction | Original | D | 5/25/2004 | SEAN | SEAN | New AHU-1 on roof top exceeds 300 lbs. Provide letter from structural engineer verifying that existing framing can accommodate new load and provide structural drawings if any modification is necessary. | | Construction | 204833 |
|
| |
|