Health Dept. | Original | A | 5/2/2005 | JEREMY | JEREMY | lbp 2-7-05 | | Health Dept. | 219140 |
Enumeration | Original | A | 3/28/2005 | MARLENE | MARLENE | | | Enumeration | 219137 |
Plumbing | Original | A | 3/16/2005 | RUSSELL | RUSSELL | | | Plumbing | 219146 |
Mechanical | Original | A | 3/16/2005 | RUSSELL | RUSSELL | | | Mechanical | 219142 |
Construction | Original | A | 3/16/2005 | ROGER | ROGER | All comments addressed - Approved | | Construction | 219134 |
Out to Review | Original | A | 3/4/2005 | SHELLEY | SHELLEY | brian burns, 265-5545 | | Out to Review | 219145 |
Fire | Original | A | 2/23/2005 | JEREMY | JEREMY | VLC 2-23-05 | | Fire | 219139 |
Electrical | Original | A | 2/23/2005 | JERRY | JERRY | | | Electrical | 219136 |
Out to Review | Original | A | 2/22/2005 | TERRY | TERRY | Jerry Miller | | Out to Review | 219144 |
Plumbing | Original | D | 2/18/2005 | KYE | KYE | P4.1 Shutoff valve between water heater and expansion tank not allowed. P5.2 The 2000 International Energy Conservation Code requires insulation for any hot water recirculation systems on main line and return line. | | Plumbing | 219147 |
Mechanical | Original | D | 2/18/2005 | KYE | KYE | M1.2 Path of R/A in basement is unclear. M2.1 Set CO2 detector at 800 PPM minimum. Provide amount of OSA introduced into system so it complies with chapter 12, 97 UBC Add note to smole detector note that they are to be wired to shut units down upon detection of smoke. | | Mechanical | 219143 |
Construction | Original | D | 2/14/2005 | TIMC | TIMC | Approved variance required to design structural to 03' IBC. Specify size of boiler. Address other comments as noted on plans. Walk-thru ok. | | Construction | 219135 |
Health Dept. | Original | D | 2/8/2005 | JEREMY | JEREMY | LBP 2-7-05 contact air quality if ACM is present | | Health Dept. | 219141 |
Enumeration | Original | D | 2/8/2005 | JEREMY | JEREMY | mk 2-7-05 see plans for comments | | Enumeration | 219138 |