Out to Review | Original | A | 5/29/2007 | JAN | JAN | Vern with PCS | | Out to Review | 244186 |
Mechanical | Original | A | 3/7/2007 | RUSSELL | RUSSELL | | | Mechanical | 244161 |
Mechanical | Original | / | 3/5/2007 | SHELLEY | SHELLEY | Given to RUSSELL by SHELLEY | | Mechanical | 244156 |
Mechanical | Original | / | 3/2/2007 | | SHELLEY | Location = Mechanical by SHELLEY | | Mechanical | 244155 |
Construction | Original | A | 3/2/2007 | SHELLEY | SHELLEY | 3/2/07 - timc | | Construction | 244106 |
Construction | Original | / | 3/2/2007 | SHELLEY | SHELLEY | Given to TIMC by SHELLEY | | Construction | 244010 |
Construction | Original | / | 3/2/2007 | SHELLEY | SHELLEY | Given to TIMC by SHELLEY | | Construction | 244009 |
Construction | Original | / | 3/2/2007 | | SHELLEY | Location = Construction by SHELLEY | | Construction | 244008 |
Construction | Original | / | 3/1/2007 | | SHELLEY | Location = Construction by SHELLEY | | Construction | 244007 |
Out to Review | Original | A | 2/27/2007 | SHELLEY | SHELLEY | al fritz 332-4088 | | Out to Review | 244185 |
Construction | Original | / | 2/22/2007 | SHELLEY | SHELLEY | Given to TIMC by SHELLEY | | Construction | 244006 |
Construction | Original | / | 2/21/2007 | | ROGER | Location = Construction by ROGER | | Construction | 244005 |
Mechanical | Original | / | 2/21/2007 | SHELLEY | SHELLEY | spliced mechanical pages | | Mechanical | 244154 |
Construction | Original | / | 2/21/2007 | SHELLEY | SHELLEY | spliced construction pages | | Construction | 244004 |
Finished Bin | Original | / | 2/8/2007 | | SHELLEY | Location = Finished Bin by SHELLEY | | Finished Bin | 244139 |
Out to Review | Original | A | 2/2/2007 | ANGELA | ANGELA | jim vernon has plans | | Out to Review | 244184 |
Fire | Original | A | 2/2/2007 | ANGELA | ANGELA | palmer lake fire approval given for splice 02-02-07 | | Fire | 244142 |
Out to Review | Original | A | 2/2/2007 | ANGELA | ANGELA | out to Jim Vernon | | Out to Review | 244183 |
Finished Bin | Original | / | 2/2/2007 | | SHELLEY | Location = Finished Bin by SHELLEY | | Finished Bin | 244138 |
Plan Coordinator | Original | / | 2/2/2007 | | TIMC | Location = Plan Coordinator by TIMC | | Plan Coordinator | 244192 |
Construction | Original | A | 2/2/2007 | TIMC | TIMC | | | Construction | 244017 |
Construction | Original | / | 1/30/2007 | | ANGELA | Location = Construction by ANGELA | | Construction | 244003 |
Construction | Original | / | 1/30/2007 | ANGELA | ANGELA | splice in plan, submit to construction then put in finish bin please. | | Construction | 244002 |
Out to Review | Original | A | 1/30/2007 | SHELLEY | SHELLEY | al fritz, 332-4088 | | Out to Review | 244182 |
Finished Bin | Original | / | 1/30/2007 | | SHELLEY | Location = Finished Bin by SHELLEY | | Finished Bin | 244137 |
Plan Coordinator | Original | / | 1/30/2007 | | JERRY | Location = Plan Coordinator by JERRY | | Plan Coordinator | 244191 |
Electrical | Original | A | 1/30/2007 | JERRY | JERRY | | | Electrical | 244125 |
Electrical | Original | / | 1/29/2007 | SHELLEY | SHELLEY | Given to JERRY by SHELLEY | | Electrical | 244123 |
Electrical | Original | / | 1/26/2007 | | SHELLEY | Location = Electrical by SHELLEY | | Electrical | 244122 |
Plan Coordinator | Original | / | 1/26/2007 | | DARYL | Location = Plan Coordinator by DARYL | | Plan Coordinator | 244190 |
Plumbing | Original | A | 1/26/2007 | DARYL | DARYL | As noted | | Plumbing | 244205 |
Plumbing | Original | / | 1/26/2007 | SHELLEY | SHELLEY | Given to DARYL by SHELLEY | | Plumbing | 244201 |
Plumbing | Original | / | 1/25/2007 | | SHELLEY | Location = Plumbing by SHELLEY | | Plumbing | 244200 |
Fire | Original | / | 1/25/2007 | TIMC | TIMC | Plans required to go through Fire due to elimination of Fire Walls. | | Fire | 244140 |
Plan Coordinator | Original | / | 1/25/2007 | | TIMC | Location = Plan Coordinator by TIMC | | Plan Coordinator | 244189 |
Construction | Original | D | 1/25/2007 | TIMC | TIMC | Not all areas of R occupancy have been shown in area calculations of floor layouts. I thought the purpuse of this permit was to remove 2-hr Fire Barriers? Why are they still being shown on plans? Address other comments as noted on plans. No walk-thru. | | Construction | 244117 |
Construction | Original | / | 1/24/2007 | SHELLEY | SHELLEY | Given to TIMC by SHELLEY | | Construction | 244105 |
Construction | Original | / | 1/24/2007 | | SHELLEY | Location = Construction by SHELLEY | | Construction | 244104 |
Plumbing | Original | / | 1/24/2007 | SHELLEY | SHELLEY | plumbing pages not stamped | | Plumbing | 244199 |
Construction | Original | / | 1/24/2007 | SHELLEY | SHELLEY | architectural pages replaced | | Construction | 244103 |
Construction | Original | A | 1/23/2007 | ANGELA | ANGELA | | | Construction | 244016 |
Construction | Original | A | 1/23/2007 | ANGELA | ANGELA | | | Construction | 244015 |
Construction | Original | / | 1/23/2007 | ANGELA | ANGELA | | | Construction | 244102 |
Out to Review | Original | A | 1/22/2007 | SHELLEY | SHELLEY | al fritz, 332-4088 | | Out to Review | 244181 |
Electrical | Original | / | 1/22/2007 | SHELLEY | SHELLEY | Given to JERRY by SHELLEY | | Electrical | 244121 |
Electrical | Original | / | 1/22/2007 | | SHELLEY | Location = Electrical by SHELLEY | | Electrical | 244120 |
Plan Coordinator | Original | / | 1/22/2007 | | RUSSELL | Location = Plan Coordinator by RUSSELL | | Plan Coordinator | 244188 |
Plumbing | Original | A | 1/22/2007 | ROGER | ROGER | Re- Approved, no changes to plumbing. | | Plumbing | 244204 |
Mechanical | Original | A | 1/22/2007 | ROGER | ROGER | Re-Approved, no changes to Mechanical. | | Mechanical | 244160 |
Mechanical | Original | / | 1/22/2007 | SHELLEY | SHELLEY | Given to RUSSELL by SHELLEY/JWJ | | Mechanical | 244153 |
Mechanical | Original | / | 1/22/2007 | | SHELLEY | Location = Mechanical by SHELLEY | | Mechanical | 244152 |
Plumbing | Original | / | 1/22/2007 | ROGER | ROGER | | | Plumbing | 244198 |
Mechanical | Original | / | 1/22/2007 | ROGER | ROGER | | | Mechanical | 244151 |
Plan Coordinator | Original | / | 1/22/2007 | | TIMC | Location = Plan Coordinator by TIMC | | Plan Coordinator | 244187 |
Construction | Original | D | 1/22/2007 | TIMC | TIMC | Provide a floor plan showing entire building and use of each room. Make revisions to code study as noted. Plans need to be reviewed by additional departments as there are mechanical and plumbing changes being made. No walk-thru. | | Construction | 244116 |
Construction | Original | / | 1/17/2007 | SHELLEY | SHELLEY | Given to TIMC by SHELLEY | | Construction | 244101 |
Construction | Original | / | 1/17/2007 | | SHELLEY | Location = Construction by SHELLEY | | Construction | 244100 |
Out to Review | Original | A | 1/12/2007 | ANGELA | ANGELA | out to contractor walking set through electrical then submitting thru construction. | | Out to Review | 244180 |
Electrical | Original | / | 1/12/2007 | ANGELA | ANGELA | resubmitted 01-12-07 | | Electrical | 244119 |
Construction | Original | / | 1/12/2007 | ANGELA | ANGELA | | | Construction | 244099 |
Mechanical | Original | A | 12/11/2006 | RUSSELL | RUSSELL | Revised ductwork layout damper reqmts & gas piping | | Mechanical | 244159 |
Out to Review | Original | A | 11/13/2006 | RICH | RICH | | | Out to Review | 244179 |
Construction | Original | A | 11/13/2006 | RICH | RICH | approveed rich | | Construction | 244014 |
Out to Review | Original | A | 11/13/2006 | ANGELA | ANGELA | out to Gary Bell 303-434-8123 | | Out to Review | 244178 |
Finished Bin | Original | / | 11/9/2006 | | SHELLEY | Location = Finished Bin by SHELLEY | | Finished Bin | 244136 |
Plumbing | Original | A | 11/9/2006 | LARRY | LARRY | Approved as noted | | Plumbing | 244203 |
Plumbing | Original | / | 11/9/2006 | LARRY | LARRY | | | Plumbing | 244197 |
Enumeration | Original | N | 11/9/2006 | SHELLEY | SHELLEY | Given to LARRY by SHELLEY | | Enumeration | 244133 |
Plumbing | Original | / | 11/8/2006 | | SHELLEY | Location = Plumbing by SHELLEY | | Plumbing | 244196 |
Mechanical | Original | A | 11/8/2006 | RUSSELL | RUSSELL | | | Mechanical | 244158 |
Enumeration | Original | N | 11/8/2006 | SHELLEY | SHELLEY | Given to RUSSELL by SHELLEY | | Enumeration | 244132 |
Mechanical | Original | / | 11/8/2006 | | SHELLEY | Location = Mechanical by SHELLEY | | Mechanical | 244150 |
Finished Bin | Original | / | 11/7/2006 | | SHELLEY | Location = Finished Bin by SHELLEY | | Finished Bin | 244135 |
Plumbing | Original | D | 11/7/2006 | LARRY | LARRY | resubmit two complete sets of plumbing plans showing changes | | Plumbing | 244208 |
Enumeration | Original | N | 11/7/2006 | SHELLEY | SHELLEY | Given to LARRY by SHELLEY | | Enumeration | 244131 |
Plumbing | Original | / | 11/7/2006 | | SHELLEY | Location = Plumbing by SHELLEY | | Plumbing | 244195 |
Construction | Original | D | 11/7/2006 | TIMC | TIMC | Provide copies of trusses to show that they have been designed to hold additional weight of RTU's. New RBD plan set needs to be stamped in by the front counter. Walk-thru ok. | | Construction | 244115 |
Plumbing | Original | / | 11/6/2006 | RUSSELL | RUSSELL | Plumbing needs to be re-reviewed, adding sinks, drinking fountain & mop service sink | | Plumbing | 244194 |
Mechanical | Original | D | 11/6/2006 | RUSSELL | RUSSELL | Ducts entering and exiting shafts, require F/S dampers | | Mechanical | 244166 |
Enumeration | Original | N | 11/3/2006 | SHELLEY | SHELLEY | Given to RUSSELL by SHELLEY | | Enumeration | 244130 |
Mechanical | Original | / | 11/3/2006 | | MINDY | Location = Mechanical by MINDY | | Mechanical | 244149 |
Mechanical | Original | / | 11/3/2006 | MINDY | MINDY | Mechanical sheets now being submitted. | | Mechanical | 244148 |
Finished Bin | Original | / | 10/31/2006 | | MINDY | Location = Finished Bin by MINDY | | Finished Bin | 244134 |
Out to Review | Original | A | 10/30/2006 | MINDY | MINDY | Plans at Mindy's desk waiting for Mech sheets to be submitted | | Out to Review | 244177 |
Mechanical | Original | D | 10/30/2006 | RUSSELL | RUSSELL | No new mechanical sheets to re-review | | Mechanical | 244165 |
Construction | Original | A | 10/26/2006 | TIMC | TIMC | | | Construction | 244013 |
Mechanical | Original | / | 10/24/2006 | MINDY | MINDY | Splice to Plans being run through Construction and Mechanical. Please Fast Track and return to Mindy. | | Mechanical | 244147 |
Construction | Original | / | 10/24/2006 | MINDY | MINDY | Splice to Plans being routed through Construction and Mechanical. Please Fast Track and return to Mindy. | | Construction | 244098 |
Construction | Original | D | 10/23/2006 | TIMC | TIMC | Provide new architectural sheets indicating location of new shafts as shown on mechanical drawings. Provide engineering letter for new RTU's indicating existing roof adequate for new loads or specifying changes that are needed. No walk-thru. | | Construction | 244114 |
Construction | Original | / | 10/23/2006 | TIMC | TIMC | | | Construction | 244097 |
Construction | Original | D | 10/20/2006 | TIMC | TIMC | | | Construction | 244113 |
Mechanical | Original | D | 10/17/2006 | RUSSELL | RUSSELL | Spliced drawings disapproved, must go back through construction review for shafts reqmts, put in construction bin for review | | Mechanical | 244164 |
Construction | Original | A | 9/15/2006 | TIMC | TIMC | | | Construction | 244012 |
Construction | Original | / | 9/11/2006 | HEATHER | HEATHER | took to construction | | Construction | 244096 |
Out to Review | Original | A | 9/11/2006 | SHELLEY | SHELLEY | gary bell, 303-434-8123 | | Out to Review | 244176 |
Construction | Original | D | 9/11/2006 | JAN | JAN | trusses id numbers wrong not plan check completed TC | | Construction | 244112 |
Construction | Original | / | 8/30/2006 | SHELLEY | SHELLEY | trusses submitted and given to Tim C. | | Construction | 244095 |
Water Division | Original | N | 7/26/2006 | MINDY | MINDY | 07/26/06 KW | | Water Division | 244210 |
Waste Water Div | Original | A | 7/26/2006 | MINDY | MINDY | 07/26/06 KW | | Waste Water Div | 244209 |
Fire | Original | A | 7/26/2006 | MINDY | MINDY | 07/26/06 JSE | | Fire | 244141 |
Zoning/Planning | Original | A | 7/26/2006 | MINDY | MINDY | Palmer Lake 07/23/06 | | Zoning/Planning | 244211 |
Out to Review | Original | A | 7/17/2006 | HEATHER | HEATHER | wyatt mercer 303-598-9474 | | Out to Review | 244175 |
Electrical | Original | A | 7/17/2006 | GARYL | GARYL | IECC SHEETS ARE NOW IN PRINTS AND APPROVED | | Electrical | 244124 |
Out to Review | Original | A | 7/17/2006 | KYE | KYE | Jim Pepper | | Out to Review | 244174 |
Plumbing | Original | A | 7/17/2006 | KYE | KYE | | | Plumbing | 244202 |
Elevators | Original | A | 7/17/2006 | TOM | TOM | | | Elevators | 244128 |
Electrical | Original | D | 7/17/2006 | GARYL | GARYL | NEED IECC CALCULATIONS AND WORKSHEETS FOR HOTEL CORRIDOR, COMMON USE AREAS, AND HALLWAYS, SENT TO TOM IN ELEVATORS | | Electrical | 244127 |
Electrical | Original | / | 7/14/2006 | GARYL | GARYL | | | Electrical | 244118 |
Construction | Original | A | 7/14/2006 | TIMC | TIMC | | | Construction | 244011 |
Out to Review | Original | A | 7/13/2006 | HEATHER | HEATHER | wyatt mercer has plans and is walking them | | Out to Review | 244173 |
Out to Review | Original | A | 7/13/2006 | HEATHER | HEATHER | wyatt mercer 303-598-9474 | | Out to Review | 244172 |
Mechanical | Original | A | 7/10/2006 | RUSSELL | RUSSELL | | | Mechanical | 244157 |
Construction | Original | D | 7/10/2006 | TIMC | TIMC | Walkway wall detail provided is not in Gyp manual. Why did you revise all sheets when only 1 page has changed? Please take all old sheets that have not been changed and rebind them into plan set. Otherwise I must do a complete review of all the new sheets which takes a lot of time. No walk-thru. | | Construction | 244111 |
Construction | Original | / | 7/10/2006 | TIMC | TIMC | | | Construction | 244094 |
Construction | Original | / | 7/7/2006 | HEATHER | HEATHER | | | Construction | 244093 |
Mechanical | Original | / | 7/7/2006 | HEATHER | HEATHER | | | Mechanical | 244146 |
Out to Review | Original | A | 7/7/2006 | HEATHER | HEATHER | wyatt mercer 303-598-9474 | | Out to Review | 244171 |
Construction | Original | D | 7/6/2006 | TIMC | TIMC | New sheets are not properly bound into plan sets. Please remove all old sheets from bound sets and replace with new sheets. No review performed. No walk-thru. | | Construction | 244110 |
Construction | Original | / | 7/6/2006 | TIMC | TIMC | | | Construction | 244092 |
Construction | Original | / | 7/6/2006 | SHELLEY | SHELLEY | revised for construction only | | Construction | 244091 |
Out to Review | Original | A | 7/6/2006 | JEREMY | JEREMY | at paln table revising plan sheets 303-919-5499 | | Out to Review | 244170 |
Plumbing | Original | D | 7/5/2006 | KYE | KYE | Still not showing electric water cooler on "B" DWV or water pipe isometrics MP2.01 or on MP1.01. | | Plumbing | 244207 |
Plumbing | Original | / | 7/3/2006 | KYE | KYE | | | Plumbing | 244193 |
Mechanical | Original | D | 7/3/2006 | RUSSELL | RUSSELL | Mtg Rm, in order to provide continuous O.A., must relief or exhaust O.A. supplied into space, | | Mechanical | 244163 |
Mechanical | Original | / | 6/30/2006 | RUSSELL | RUSSELL | | | Mechanical | 244145 |
Construction | Original | D | 6/28/2006 | TIMC | TIMC | Provide model energy code cert. Provide HC details for shower. Walkway wall detail is not in Gyp manual. No walk-thru. | | Construction | 244109 |
Construction | Original | / | 6/28/2006 | TIMC | TIMC | | | Construction | 244090 |
Construction | Original | / | 6/28/2006 | TIMC | TIMC | | | Construction | 244089 |
Construction | Original | D | 6/22/2006 | TIMC | TIMC | Provide original RDB checked sheets for re-review. No further review performed. | | Construction | 244108 |
Construction | Original | / | 6/20/2006 | JOHNJ | JOHNJ | REVISED FOR ALL// RE START IN CONSTRUCION | | Construction | 244088 |
Out to Review | Original | A | 5/19/2006 | SHELLEY | SHELLEY | al fritz, 332-4088 | | Out to Review | 244169 |
Electrical | Original | D | 5/17/2006 | GARYL | GARYL | SEE ATTACHED SHEET, PRINTS AND BINDER--------FINISHED BIN----- | | Electrical | 244126 |
Out to Review | Original | A | 5/16/2006 | GARYL | GARYL | GARYL PLAN REVIEW OFFICE | | Out to Review | 244168 |
Out to Review | Original | A | 5/16/2006 | OWEN | OWEN | To Electrical 5-16-06 | | Out to Review | 244167 |
Health Dept. | Original | A | 5/16/2006 | OWEN | OWEN | cn--5-15-06; to Elec. 5-16-06 | | Health Dept. | 244144 |
Plumbing | Original | D | 5/8/2006 | DARYL | DARYL | 1. Need piping for drinking fountain, mop sink, bathroom floor drains and water heater floor drain. 2. Need water loads--future and existing. Need meter location and tie-ins on schematic to verify sizing. | | Plumbing | 244206 |
Mechanical | Original | D | 5/3/2006 | RUSSELL | RUSSELL | See plans for comments | | Mechanical | 244162 |
Construction | Original | D | 5/1/2006 | TIMC | TIMC | Allowable area for A3 occupancy works for entire building, use nonseperated uses per 302.3.1, remove 2-hr seperation wall. Provide model energy code cert. VA buildings required to have 1-hr exterior walls. Provide 1-hr ceiling at 2nd floor corridor and ceiling of elevator. Revise door schedule. Provide HC details for shower. Walkway required to meet requirements of 3104, 2-hr fire wall per 3104.5. 1:12 max slope required for HC ramp. 100psf design floor load required for corridor and mtg rooms. No walk-thru. | | Construction | 244107 |
Floodplain | Original | A | 4/24/2006 | JEANNINE | JEANNINE | | | Floodplain | 244143 |
Enumeration | Original | N | 4/24/2006 | MARLENE | MARLENE | | | Enumeration | 244129 |