Required Departments: 6
|
|
|
Log Entries: 14
|
|
Mechanical | Original | A | 4/3/2007 | RUSSELL | RUSSELL | Revised mechanical | | Mechanical | 248568 | Plumbing | Original | A | 8/29/2006 | LARRY | LARRY | | | Plumbing | 248572 | Mechanical | Original | A | 8/29/2006 | LARRY | LARRY | | | Mechanical | 248567 | Plumbing | Original | / | 8/29/2006 | LARRY | LARRY | | | Plumbing | 248571 | Mechanical | Original | / | 8/29/2006 | LARRY | LARRY | | | Mechanical | 248566 | Construction | Original | A | 8/23/2006 | ROGER | ROGER | Approved | | Construction | 248561 | Out to Review | Original | A | 8/18/2006 | PATTIE | PATTIE | Joe Walker, 471-7566 | | Out to Review | 248570 | Fire | Original | A | 8/10/2006 | CSFIRE | CSFIRE | 08/10/06 VC | | Fire | 248565 | Electrical | Original | A | 8/4/2006 | GARYL | GARYL | --------FIRE 8/4/6--------------------- | | Electrical | 248563 | Plumbing | Original | D | 7/31/2006 | LARRY | LARRY | Show square footage for roof drains on third floor (existing?) Heliport drain must drain to sand/oil interceptor prior to connecting to strom drain See draings for additional comments | | Plumbing | 248573 | Mechanical | Original | D | 7/31/2006 | LARRY | LARRY | Provide FSD's at all rated penetrations (see plans) Exhaust for for mens locker 3015 needs to be 170 CFM Add notes for IECC sections (see plans) Add note to provide air balance report to inspector at time of final Add note per 03 IMC sec 603.5 Add duct smoke at RA per 03 IMC sec 606.2.1 Seperate at third floor toilet exhaust from general exhaust per IMC 03 sec 601.3 | | Mechanical | 248569 | Construction | Original | D | 7/24/2006 | ROGER | ROGER | See plan for comments. Revise door schedule (missing smoke seals). No other comments. Walk Thru OK. | | Construction | 248562 | Construction | Original | / | 7/10/2006 | ROGER | ROGER | | | Construction | 248560 | Enumeration | Original | A | 6/30/2006 | MARLENE | MARLENE | | | Enumeration | 248564 |
|
| |
|