To Be Scanned Bin | Original | / | 11/16/2006 | | JAN | Location = To Be Scanned Bin by JAN | | To Be Scanned Bin | 9445 |
Scanned/Finished Bin | Original | / | 11/16/2006 | | JAN | Location = Scanned/Finished Bin by JAN | | Scanned/Finished Bin | 9444 |
Plumbing | Original | A | 11/15/2006 | KYE | KYE | | | Plumbing | 9441 |
Zoning/Planning | Original | A | 11/14/2006 | SHELLEY | SHELLEY | Given to KYE by SHELLEY | | Zoning/Planning | 9451 |
Plumbing | Original | / | 11/13/2006 | | SHELLEY | Location = Plumbing by SHELLEY | | Plumbing | 9440 |
Plumbing | Original | / | 11/13/2006 | SHELLEY | SHELLEY | RESUBMITTED FOR PLUMBING | | Plumbing | 9439 |
Out to Review | Original | A | 11/9/2006 | SHELLEY | SHELLEY | sharon styer, 635-3563 | | Out to Review | 9435 |
Finished Bin | Original | / | 11/8/2006 | | SHELLEY | Location = Finished Bin by SHELLEY | | Finished Bin | 9425 |
Mechanical | Original | / | 11/8/2006 | | RUSSELL | Location = Mechanical by RUSSELL | | Mechanical | 9430 |
Mechanical | Original | A | 11/8/2006 | RUSSELL | RUSSELL | | | Mechanical | 9431 |
Zoning/Planning | Original | A | 11/8/2006 | SHELLEY | SHELLEY | Given to RUSSELL by SHELLEY | | Zoning/Planning | 9450 |
Mechanical | Original | / | 11/8/2006 | | SHELLEY | Location = Mechanical by SHELLEY | | Mechanical | 9429 |
Out to Review | Original | A | 11/8/2006 | SHELLEY | SHELLEY | w/ kye for meeting w/designer | | Out to Review | 9434 |
Finished Bin | Original | / | 11/7/2006 | | SHELLEY | Location = Finished Bin by SHELLEY | | Finished Bin | 9424 |
Plumbing | Original | D | 11/7/2006 | KYE | KYE | P400F: 1. Remove old sheets, insert updated sheets into set. 2. Provide Isometric drawings for all pipe being installed during core/shell package. 3. Remove any piping from plans that will be installed during tenant finish packages. P401: 1. Show column letters. P401.3: 1. Show column letters. P403: 1. Some "Waste Down" pipes do not appear to continue floor below, any drain piping shown on core/shell plan needs to continue down to plumbing base piping. P404: 1. Some "Waste Down" pipes do not appear to continue floor below, any drain piping shown on core/shell plan needs to continue down to plumbing base piping. | | Plumbing | 9455 |
Plumbing | Original | / | 11/7/2006 | KYE | KYE | | | Plumbing | 9438 |
Plumbing | Original | / | 11/6/2006 | | KYE | Location = Plumbing by KYE | | Plumbing | 9437 |
Zoning/Planning | Original | A | 11/6/2006 | SHELLEY | SHELLEY | Given to KYE by SHELLEY | | Zoning/Planning | 9449 |
Plumbing | Original | / | 11/6/2006 | | SHELLEY | Location = Plumbing by SHELLEY | | Plumbing | 9436 |
Finished Bin | Original | / | 11/3/2006 | | SHELLEY | Location = Finished Bin by SHELLEY | | Finished Bin | 9423 |
Electrical | Original | A | 11/2/2006 | JERRY | JERRY | ALL CORRECTIONS FOR THIS SET ARE TO BE INCLUDED WITH THE ELECTRICAL FOR THE ENTIRE BUILDING (TO INCLUDE FIRE PUMP DETAILS AND WORKING SPACE FOR ALL ELECTRICAL ROOMS) | | Electrical | 9421 |
Zoning/Planning | Original | A | 11/2/2006 | SHELLEY | SHELLEY | Given to JERRY by SHELLEY | | Zoning/Planning | 9448 |
Electrical | Original | / | 11/2/2006 | | SHELLEY | Location = Electrical by SHELLEY | | Electrical | 9420 |
Mechanical | Original | D | 11/2/2006 | RUSSELL | RUSSELL | Elevator control room duct penetrations require F/S damper at wall penetrations, stairwell ventilation duct hsall be in rated shaft, see plan for location | | Mechanical | 9433 |
Zoning/Planning | Original | A | 11/1/2006 | SHELLEY | SHELLEY | Given to RUSSELL by SHELLEY | | Zoning/Planning | 9447 |
Mechanical | Original | / | 10/31/2006 | | ROGER | Location = Mechanical by ROGER | | Mechanical | 9428 |
Construction | Original | A | 10/31/2006 | ROGER | ROGER | Approved | | Construction | 9418 |
Zoning/Planning | Original | A | 10/27/2006 | JAN | JAN | | | Zoning/Planning | 9446 |
Hazmat/High Pil | Original | N | 10/23/2006 | JEREMY | JEREMY | vlc 10-23-06 | | Hazmat/High Pil | 9427 |
Fire | Original | A | 10/23/2006 | CSFIRE | CSFIRE | vlc 10-23-06 | | Fire | 9426 |
Plumbing | Original | D | 10/20/2006 | KYE | KYE | P400F: 1. Update all underground sheets to reflect pre-apprved plan data. 2. Provide riser diagrams/ISO drawings. 3. Stacks from upper floors do not appear to continue down to underground drain lines. 4. Label waste/vent risers as to fixrure type. Typical all sheets. 5. Provide fixture list for fixrures shown as "waste up". P401 1. Show column letters on sheet. P403: 1. 4" waste down does not appear to continue on P402. P404: 1. 4" waste down does not appear to continue on P403. P404: 1. 6" SD/4" V missing from shaft GG-4/5. P407: 1. Scuppers shown on architectural pages for roof drain overflow do not appear to have leaders extending to grade for discharge.. P504.A 1. Unable to locate booster pump mentioned in note for Hydrocumulator Tank. | | Plumbing | 9443 |
Plumbing | Original | D | 10/20/2006 | KYE | KYE | P400F: 1. | | Plumbing | 9442 |
Electrical | Original | D | 10/18/2006 | SHELBY | SHELBY | SEE ATTACHED | | Electrical | 9422 |
Mechanical | Original | D | 10/12/2006 | RUSSELL | RUSSELL | See all plans for comments | | Mechanical | 9432 |
Construction | Original | D | 10/9/2006 | ROGER | ROGER | See plan for all comments. Specify if electrical rooms are sprinklered, how is CUP classified (seperation, occupancy, etc). Missing doors on A101.2 & A102.2. See Roger for Approval - 4.5 hr OT. Set to mechanical | | Construction | 9419 |