Mechanical | Original | A | 9/18/2008 | DALEH | DALEH | splice for change to mechanical plans | | Mechanical | 381003 |
Out to Review | Original | / | 6/25/2008 | SHELBY | SHELBY | TIM 719 590 9194 | | Out to Review | 366452 |
Electrical | Original | / | 6/25/2008 | | SHELBY | Location = Electrical by SHELBY | | Electrical | 366451 |
Zoning/Planning | Original | A | 2/27/2008 | MINDY | MINDY | 02/27/08 DW | | Zoning/Planning | 322322 |
Finished Bin | Original | / | 1/7/2008 | | MINDY | Location = Finished Bin by MINDY | | Finished Bin | 322290 |
Plan Coordinator | Original | / | 1/4/2008 | | STEPHEN | Location = Plan Coordinator by STEPHEN | | Plan Coordinator | 322312 |
Construction | Original | A | 1/4/2008 | STEPHEN | STEPHEN | | | Construction | 322279 |
Construction | Original | / | 1/4/2008 | SHARON | SHARON | Given to STEPHEN by SHARON | | Construction | 322278 |
Construction | Original | / | 1/3/2008 | | JAN | Location = Construction by JAN | | Construction | 322277 |
Construction | Original | / | 1/3/2008 | JAN | JAN | | | Construction | 322276 |
Out to Review | Original | A | 1/3/2008 | JAN | JAN | Bill myhren Farnsworth group 590-9194 | | Out to Review | 322305 |
Finished Bin | Original | / | 12/7/2007 | | MINDY | Location = Finished Bin by MINDY | | Finished Bin | 322289 |
Plan Coordinator | Original | / | 12/7/2007 | | STEPHEN | Location = Plan Coordinator by STEPHEN | | Plan Coordinator | 322311 |
Construction | Original | D | 12/7/2007 | STEPHEN | STEPHEN | Revise COMcheck to show existing double tee walls as "cavity" insulation -- not continuous. Revise plan set accordingly to bring into IECC compliance. | | Construction | 322282 |
Construction | Original | / | 12/6/2007 | MINDY | MINDY | Given to STEPHEN by MINDY | | Construction | 322275 |
Construction | Original | / | 12/5/2007 | | KIM | Location = Construction by KIM | | Construction | 322274 |
Construction | Original | / | 12/5/2007 | KIM | KIM | resubmit | | Construction | 322273 |
Construction | Original | D | 12/5/2007 | SHELLEY | SHELLEY | Redlines on plan have been addressed. Comcheck still needs to be reviewed, cannot do in a walk-through for this building. Note: FRT comments on some areas have been removed because FRT is not applicable with the use of 5/8 gyp. FRT is only being used behind signage and metal facade. | | Construction | 322281 |
Health Dept. | Original | A | 11/7/2007 | healthdept | healthdept | Construction Activity permit was issued and is valid from 10/17/07 to 10/17/08. Plans are approved as noted. -Danielle, 575-8426 | | Health Dept. | 322294 |
Out to Review | Original | A | 11/2/2007 | SHELBY | SHELBY | CHRIS 590 9194 | | Out to Review | 322304 |
Electrical | Original | A | 11/2/2007 | SHELBY | SHELBY | | | Electrical | 322286 |
Electrical | Original | / | 11/2/2007 | | SHELBY | Location = Electrical by SHELBY | | Electrical | 322285 |
Plumbing | Original | A | 11/2/2007 | TCRIPPEN | TCRIPPEN | rest rooms at tenant finish`s | | Plumbing | 322314 |
Mechanical | Original | A | 11/2/2007 | TCRIPPEN | TCRIPPEN | | | Mechanical | 322300 |
Waste Water Div | Original | A | 10/15/2007 | ajuvera | ajuvera | | | Waste Water Div | 322316 |
Water Division | Original | A | 10/15/2007 | ajuvera | ajuvera | | | Water Division | 322319 |
Out to Review | Original | A | 10/2/2007 | KIM | KIM | Mike Bingen 471-7566 | | Out to Review | 322303 |
Hazmat/High Pile | Original | N | 10/1/2007 | MINDY | MINDY | 10/01/07 CTH | | Hazmat/High Pile | 322293 |
Fire | Original | A | 10/1/2007 | MINDY | MINDY | 10/01/07 CTH | | Fire | 322292 |
Fire | Original | / | 9/13/2007 | | MINDY | Location = Fire by MINDY | | Fire | 322291 |
Plan Coordinator | Original | / | 9/12/2007 | | SHELBY | Location = Plan Coordinator by SHELBY | | Plan Coordinator | 322310 |
Electrical | Original | D | 9/12/2007 | SHELBY | SHELBY | SHOW ALL PANEL SCHEDULES---SHOW ALL SERVICE GEAR ON FLOOR PLAN(METERS C/T CAN ETC.)---GROUP ALL SERVICE DISCONNECTS---GROUP ALL METERS---SHOW REQUIRED SERVICE RECEPTICLES ON ROOF---COMPLY 110.26 D NEC---SHOW WIRE AND CONDUIT SIZE ON ONE LINE----PROVIDE FAULT CURRENT INFORMATION | | Electrical | 322287 |
Electrical | Original | / | 9/12/2007 | MINDY | MINDY | Given to SHELBY by MINDY | | Electrical | 322284 |
Electrical | Original | / | 9/12/2007 | | MINDY | Location = Electrical by MINDY | | Electrical | 322283 |
Plan Coordinator | Original | / | 9/12/2007 | | TCRIPPEN | Location = Plan Coordinator by TCRIPPEN | | Plan Coordinator | 322309 |
Plumbing | Original | D | 9/12/2007 | TCRIPPEN | TCRIPPEN | 1-plans reads existing roof drains schedule reads 2 inch waste ? provide information 2-occupancy load reads 1394 rest rooms and drinking fountain required has existing mop sink provide information | | Plumbing | 322315 |
Mechanical | Original | / | 9/12/2007 | MINDY | MINDY | Given to TCRIPPEN by MINDY | | Mechanical | 322299 |
Plumbing | Original | / | 9/11/2007 | | MINDY | Location = Plumbing by MINDY | | Plumbing | 322313 |
Plan Coordinator | Original | / | 9/11/2007 | | DALEH | Location = Plan Coordinator by DALEH | | Plan Coordinator | 322308 |
Mechanical | Original | D | 9/11/2007 | DALEH | DALEH | need btu inputs of existing rtu's need to show total developed length for each meter see gas piping plan for redline comments on sizing | | Mechanical | 322301 |
Water Division | Original | D | 9/11/2007 | b.zook | b.zook | Signatures are more than 6 months old, contact Development Services at 668-8259 for updates signatures.
CS Fire Department approval of the RBD plans set is required prior to Water RBD approval by Utilities Development Services. | | Water Division | 322321 |
Waste Water Div | Original | D | 9/11/2007 | b.zook | b.zook | Signatures are more than 6 months old, contact Development Services at 668-8259 for updates signatures. | | Waste Water Div | 322318 |
Mechanical | Original | / | 9/11/2007 | MINDY | MINDY | Given to DALEH by MINDY | | Mechanical | 322298 |
Mechanical | Original | / | 9/11/2007 | | MINDY | Location = Mechanical by MINDY | | Mechanical | 322297 |
Health Dept. | Original | D | 9/11/2007 | MINDY | MINDY | 09/10/07 LD | | Health Dept. | 322295 |
Water Division | Original | D | 9/11/2007 | MINDY | MINDY | 09/10/07 AMW | | Water Division | 322320 |
Waste Water Div | Original | D | 9/11/2007 | MINDY | MINDY | 09/10/07 AMW | | Waste Water Div | 322317 |
Monday Plancheck | Original | / | 9/10/2007 | | MINDY | Location = Monday Plancheck by MINDY | | Monday Plancheck | 322302 |
Mechanical | Original | / | 9/6/2007 | | SHELLEY | Location = Mechanical by SHELLEY | | Mechanical | 322296 |
Plan Coordinator | Original | / | 9/6/2007 | | STEPHEN | Location = Plan Coordinator by STEPHEN | | Plan Coordinator | 322307 |
Construction | Original | D | 9/6/2007 | STEPHEN | STEPHEN | Missing COMcheck. Provide stamped engineering letter/analysis for new RTU loads to existing roof structure. Provide details for new openings thru existing double Tee roof structure. See red lines on plan set for additional comments | | Construction | 322280 |
Construction | Original | / | 9/5/2007 | MINDY | MINDY | Given to STEPHEN by MINDY | | Construction | 322272 |
Construction | Original | / | 9/5/2007 | | MINDY | Location = Construction by MINDY | | Construction | 322271 |
Plan Coordinator | Original | / | 9/5/2007 | | JEANNINE | Location = Plan Coordinator by JEANNINE | | Plan Coordinator | 322306 |
Enumeration | Original | A | 9/5/2007 | MARLENE | MARLENE | plans for "retail E" building with addresses 3640 and 3650 | | Enumeration | 322288 |