Required Departments: 4
|
|
|
Log Entries: 7
|
|
Construction | Original | A | 7/11/2008 | KIM | KIM | 7/8/08 sas | | Construction | 369602 | Fire | Original | N | 7/11/2008 | KIM | KIM | jrm 7/8/08 | | Fire | 369601 | Floodplain | Original | A | 7/8/2008 | JEANNINE | JEANNINE | | | Floodplain | 368858 | Out to Review | Original | / | 7/3/2008 | SHELBY | SHELBY | doug 473 8400 | | Out to Review | 368205 | Electrical | Original | N | 7/3/2008 | SHELBY | SHELBY | | | Electrical | 368204 | Electrical | Original | / | 7/3/2008 | | SHELBY | Location = Electrical by SHELBY | | Electrical | 368203 | Construction | Original | D | 6/26/2008 | SHELLEY | SHELLEY | Separation distance requires protected openings in wall. Exterior walls are located on lot lines with 25' public alley provided. Separation can only be measured to center of public way, therefore separation distance is 12.5'. Only 15% of wall can be unprotected. Also, provide information regarding header above opening to accommodate dead loads of 2 stories above. Clarify "new stud wall" as indicated on plans. | | Construction | 366775 |
|
| |
|