Required Departments: 7
|
|
|
Log Entries: 11
|
|
Hazmat/High Pile | Original | N | 8/8/2008 | NELIDA | NELIDA | not applicable per JRW | | Hazmat/High Pile | 374355 | Fire | Original | A | 8/8/2008 | NELIDA | NELIDA | 8/7/08 JRW | | Fire | 374354 | Construction | Original | A | 8/8/2008 | MICHAELA | MICHAELA | | | Construction | 374350 | Out to Review | Original | / | 8/7/2008 | SHELBY | SHELBY | RANDY 491 34 58 | | Out to Review | 374238 | Electrical | Original | N | 8/7/2008 | SHELBY | SHELBY | | | Electrical | 374237 | Electrical | Original | / | 8/7/2008 | | SHELBY | Location = Electrical by SHELBY | | Electrical | 374236 | Plumbing | Original | N | 8/7/2008 | TCRIPPEN | TCRIPPEN | | | Plumbing | 374232 | Mechanical | Original | N | 8/7/2008 | DALEH | DALEH | no new duct work all existing | | Mechanical | 374222 | Floodplain | Original | A | 8/7/2008 | JEANNINE | JEANNINE | | | Floodplain | 374219 | Construction | Original | D | 8/7/2008 | SHELLEY | SHELLEY | Plan indicate building <5' to lot line, design professional needs to indicate how an unprotected opening can be added. | | Construction | 374198 | Out to Review | Original | / | 8/7/2008 | NELIDA | NELIDA | walking plans | | Out to Review | 374187 |
|
| |
|