Finished Bin | Original | / | 9/30/2008 | | SHARON | Location = Finished Bin by SHARON | | Finished Bin | 383061 |
Plan Coordinator | Original | / | 9/30/2008 | | TCRIPPEN | Location = Plan Coordinator by TCRIPPEN | | Plan Coordinator | 383045 |
Plumbing | Original | A | 9/30/2008 | TCRIPPEN | TCRIPPEN | approved as note no faucets scheduled any sprayer`s with hose`s shall have vacuum protection | | Plumbing | 383044 |
Plumbing | Original | / | 9/30/2008 | SHARON | SHARON | Plan Reviewer = TCRIPPEN by SHARON | | Plumbing | 382913 |
Plumbing | Original | / | 9/29/2008 | | SHARON | Location = Plumbing by SHARON | | Plumbing | 382825 |
Mechanical | Original | A | 9/29/2008 | SHARON | SHARON | 09/29/08 DH | | Mechanical | 382824 |
Mechanical | Original | / | 9/29/2008 | SHARON | SHARON | Plan Reviewer = DALEH by SHARON | | Mechanical | 382799 |
Mechanical | Original | / | 9/29/2008 | | MINDY | Location = Mechanical by MINDY | | Mechanical | 382734 |
Resubmittal 1 | Original | / | 9/29/2008 | MINDY | MINDY | Resubmittal #1 | | Resubmittal 1 | 382733 |
Finished Bin | Original | / | 9/29/2008 | | MINDY | Location = Finished Bin by MINDY | | Finished Bin | 382723 |
Hazmat/High Pile | Original | N | 9/29/2008 | MINDY | MINDY | 09/24/08 vc | | Hazmat/High Pile | 382722 |
Fire | Original | A | 9/29/2008 | MINDY | MINDY | 09/24/08 vc | | Fire | 382721 |
Fire | Original | / | 9/24/2008 | | MINDY | Location = Fire by MINDY | | Fire | 381983 |
Plan Coordinator | Original | / | 9/23/2008 | | TCRIPPEN | Location = Plan Coordinator by TCRIPPEN | | Plan Coordinator | 381685 |
Plumbing | Original | D | 9/23/2008 | TCRIPPEN | TCRIPPEN | see added detail for tank less heater you need 1.9 gpms at 64 degrees rise + 46 incoming water = 110 degree water | | Plumbing | 381684 |
Fire | Original | / | 9/23/2008 | | MINDY | Location = Fire by MINDY | | Fire | 381639 |
Plan Coordinator | Original | / | 9/22/2008 | | SHELBY | Location = Plan Coordinator by SHELBY | | Plan Coordinator | 381627 |
Electrical | Original | A | 9/22/2008 | SHELBY | SHELBY | | | Electrical | 381626 |
Electrical | Original | / | 9/22/2008 | MINDY | MINDY | Plan Reviewer = SHELBY by MINDY | | Electrical | 381584 |
Electrical | Original | / | 9/19/2008 | | SHARON | Location = Electrical by SHARON | | Electrical | 381220 |
Plan Coordinator | Original | / | 9/19/2008 | | TCRIPPEN | Location = Plan Coordinator by TCRIPPEN | | Plan Coordinator | 381193 |
Plumbing | Original | D | 9/19/2008 | TCRIPPEN | TCRIPPEN | schedule all fixtures and materials to be used on this job hot water source that exceeds 100 shall be provide with a method of maintaining the temperature | | Plumbing | 381192 |
Plumbing | Original | / | 9/19/2008 | SHARON | SHARON | Plan Reviewer = TCRIPPEN by SHARON | | Plumbing | 381175 |
Plumbing | Original | / | 9/9/2008 | | SHARON | Location = Plumbing by SHARON | | Plumbing | 379236 |
Mechanical | Original | D | 9/9/2008 | DALEH | DALEH | need to provide schedule of existing rtu(s) that serve each area in order to verify o.s.a. req. how is return air being accomplished for two offices in pharmacy | | Mechanical | 379234 |
Mechanical | Original | / | 9/8/2008 | SHARON | SHARON | Plan Reviewer = DALEH by SHARON | | Mechanical | 378993 |
Mechanical | Original | / | 8/28/2008 | | KIM | Location = Mechanical by KIM | | Mechanical | 377773 |
Out to Review | Original | / | 8/28/2008 | JEANNINE | JEANNINE | | | Out to Review | 377766 |
Floodplain | Original | A | 8/28/2008 | JEANNINE | JEANNINE | | | Floodplain | 377765 |
Floodplain | Original | / | 8/28/2008 | | MARLENE | Location = Floodplain by MARLENE | | Floodplain | 377762 |
Enumeration | Original | A | 8/28/2008 | MARLENE | MARLENE | | | Enumeration | 377761 |
Construction | Original | A | 8/28/2008 | RICH | RICH | APPROVED RICH | | Construction | 377757 |
Out to Review | Original | / | 8/28/2008 | KIM | KIM | walking plans | | Out to Review | 377718 |