Scanned/Finished Bin | Original | / | 6/2/2009 | | SHARON | Location = Scanned/Finished Bin by SHARON | | Scanned/Finished Bin | 414574 |
To Be Scanned Bin | Original | / | 6/2/2009 | | SHARON | Location = To Be Scanned Bin by SHARON | | To Be Scanned Bin | 414564 |
Plan Coordinator | Original | / | 6/2/2009 | | SHELBY | Location = Plan Coordinator by SHELBY | | Plan Coordinator | 414554 |
Electrical | Original | A | 6/2/2009 | SHELBY | SHELBY | | | Electrical | 414553 |
Electrical | Original | / | 6/2/2009 | SHARON | SHARON | Plan Reviewer = SHELBY by SHARON | | Electrical | 414530 |
Electrical | Original | / | 6/2/2009 | | MINDY | Location = Electrical by MINDY | | Electrical | 414495 |
Plan Coordinator | Original | / | 6/2/2009 | | RUSSELL | Location = Plan Coordinator by RUSSELL | | Plan Coordinator | 414494 |
Mechanical | Original | A | 6/2/2009 | RUSSELL | RUSSELL | | | Mechanical | 414493 |
Mechanical | Original | / | 6/1/2009 | SHARON | SHARON | Plan Reviewer = RUSSELL by SHARON | | Mechanical | 414404 |
Mechanical | Original | / | 5/28/2009 | | MINDY | Location = Mechanical by MINDY | | Mechanical | 413836 |
Plan Coordinator | Original | / | 5/28/2009 | | TCRIPPEN | Location = Plan Coordinator by TCRIPPEN | | Plan Coordinator | 413821 |
Plumbing | Original | A | 5/28/2009 | TCRIPPEN | TCRIPPEN | APPROVED AS NOTED 110 DEGREE WATER IS REQUIRED | | Plumbing | 413819 |
Plumbing | Original | / | 5/28/2009 | SHARON | SHARON | Plan Reviewer = TCRIPPEN by SHARON | | Plumbing | 413814 |
Plumbing | Original | / | 5/27/2009 | | SHARON | Location = Plumbing by SHARON | | Plumbing | 413761 |
Plan Coordinator | Original | / | 5/27/2009 | | SHELLEY | Location = Plan Coordinator by SHELLEY | | Plan Coordinator | 413756 |
Construction | Original | A | 5/27/2009 | SHELLEY | SHELLEY | | | Construction | 413755 |
Construction | Original | / | 5/27/2009 | SHARON | SHARON | Plan Reviewer = SHELLEY by SHARON | | Construction | 413747 |
Construction | Original | / | 5/27/2009 | | NELIDA | Location = Construction by NELIDA | | Construction | 413744 |
Resubmittal 1 | Original | / | 5/27/2009 | NELIDA | NELIDA | Resubmittal #1 5/27/09 | | Resubmittal 1 | 413743 |
Out to Review | Original | / | 5/7/2009 | NELIDA | NELIDA | Matt 884-4459 | | Out to Review | 410677 |
Finished Bin | Original | / | 4/28/2009 | | SHARON | Location = Finished Bin by SHARON | | Finished Bin | 409226 |
Fire | Original | A | 4/28/2009 | CSFIRE | CSFIRE | SUBMITTED BY: MILAM, JONATHAN R | csfdit | Fire | 409198 |
Fire | Original | / | 4/27/2009 | | MINDY | Location = Fire by MINDY | | Fire | 409026 |
Plumbing | Original | D | 4/27/2009 | TCRIPPEN | TCRIPPEN | your water heater will require a drain pan due to the t and p drain must go to approved location | | Plumbing | 409024 |
Plumbing | Original | / | 4/27/2009 | SHARON | SHARON | Plan Reviewer = TCRIPPEN by SHARON | | Plumbing | 409009 |
Plumbing | Original | / | 4/27/2009 | | SHARON | Location = Plumbing by SHARON | | Plumbing | 409001 |
Plan Coordinator | Original | / | 4/27/2009 | | RUSSELL | Location = Plan Coordinator by RUSSELL | | Plan Coordinator | 408999 |
Mechanical | Original | D | 4/27/2009 | RUSSELL | RUSSELL | Verify relocation of ACU-3, structure adequate for weight or provide letter from structural engineer, where's r.a. path back to bldg. system ? | | Mechanical | 408998 |
Mechanical | Original | / | 4/27/2009 | SHARON | SHARON | Plan Reviewer = RUSSELL by SHARON | | Mechanical | 408975 |
Mechanical | Original | / | 4/27/2009 | | SHARON | Location = Mechanical by SHARON | | Mechanical | 408970 |
Plan Coordinator | Original | / | 4/27/2009 | | SHELBY | Location = Plan Coordinator by SHELBY | | Plan Coordinator | 408960 |
Electrical | Original | D | 4/27/2009 | SHELBY | SHELBY | Verify all information prior to review (length of feeder for panel H--note bottom right page E3.1 etc) | | Electrical | 408959 |
Electrical | Original | / | 4/24/2009 | SHARON | SHARON | Plan Reviewer = SHELBY by SHARON | | Electrical | 408721 |
Electrical | Original | / | 4/23/2009 | | SHARON | Location = Electrical by SHARON | | Electrical | 408557 |
Plan Coordinator | Original | / | 4/23/2009 | | SHELLEY | Location = Plan Coordinator by SHELLEY | | Plan Coordinator | 408541 |
Construction | Original | D | 4/23/2009 | SHELLEY | SHELLEY | Code study incomplete, revise occupant load, no walk. | | Construction | 408540 |
Construction | Original | / | 4/21/2009 | SHARON | SHARON | Plan Reviewer = SHELLEY by SHARON | | Construction | 408291 |
Construction | Original | / | 4/21/2009 | | MINDY | Location = Construction by MINDY | | Construction | 408194 |
Plan Coordinator | Original | / | 4/21/2009 | | TIMC | Location = Plan Coordinator by TIMC | | Plan Coordinator | 408148 |
Enumeration | Original | A | 4/21/2009 | TIMC | TIMC | | | Enumeration | 408147 |
Floodplain | Original | A | 4/21/2009 | TIMC | TIMC | | | Floodplain | 408142 |