Required Departments: 8
|
|
|
Log Entries: 12
|
|
Hazmat | Original | N | 8/6/2009 | KIM | KIM | DEM 8/5/09 | | Hazmat | 423729 | Fire | Original | A | 8/6/2009 | KIM | KIM | DEM 8/5/09 | | Fire | 423728 | Enumeration | Original | A | 8/5/2009 | TIMC | TIMC | | | Enumeration | 423535 | Out to Review | Original | / | 8/5/2009 | SHELBY | SHELBY | Steve 460 0871 | | Out to Review | 423533 | Electrical | Original | A | 8/5/2009 | SHELBY | SHELBY | | | Electrical | 423532 | Plumbing | Original | A | 8/5/2009 | TCRIPPEN | TCRIPPEN | | | Plumbing | 423524 | Out to Review | Original | / | 7/31/2009 | SHELBY | SHELBY | Steve 460 0871 | | Out to Review | 423075 | Electrical | Original | D | 7/31/2009 | SHELBY | SHELBY | Label all electrical equipment (panel and circuit number,see equipment referenced by notes 3 and 4)---Show all work involved in this scope on floor plan(note 3)----Clearly show which panel PPLP is being used | | Electrical | 423074 | Mechanical | Original | A | 7/31/2009 | RUSSELL | RUSSELL | | | Mechanical | 423072 | Plumbing | Original | D | 7/31/2009 | TCRIPPEN | TCRIPPEN | schedule hose bibb need water pipe size analysis on plans | | Plumbing | 423066 | Construction | Original | A | 7/31/2009 | JOHNJ | JOHNJ | 2 office walls only scope of work, sprinkle IIIB TYPE | | Construction | 423060 | Floodplain | Original | N | 7/31/2009 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain | | Floodplain | 423056 |
|
| |
|