Mechanical | Splice 8/18/11 | N | 9/6/2011 | MINDY | MINDY | 08/18/11 dh | | Mechanical | 524849 |
Scanned/Finished Bin | Splice 8/18/11 | / | 8/30/2011 | | SHARON | Location = Scanned/Finished Bin by SHARON | | Scanned/Finished Bin | 523818 |
Electrical | Splice 8/18/11 | N | 8/18/2011 | SHELBY | SHELBY | | | Electrical | 522162 |
Construction | Splice 8/18/11 | A | 8/18/2011 | SHELLEY | SHELLEY | revised ceiling in room 1201 | | Construction | 522158 |
Out to Review | Splice 8/18/11 | / | 8/18/2011 | MINDY | MINDY | walking splice | | Out to Review | 522141 |
Scanned/Finished Bin | Original | / | 6/30/2011 | | JANE | Location = Scanned/Finished Bin by JANE | | Scanned/Finished Bin | 513962 |
To Be Scanned Bin | Original | / | 6/29/2011 | | KIM | Location = To Be Scanned Bin by KIM | | To Be Scanned Bin | 513873 |
Hazmat | Original | N | 6/29/2011 | KIM | KIM | dew 6/29/11 | | Hazmat | 513872 |
CO Springs Fire | Original | A | 6/29/2011 | KIM | KIM | dew 6/29/11 | | CO Springs Fire | 513871 |
Out to Review | Original | / | 6/29/2011 | MICHAELA | MICHAELA | Tom Lysme | | Out to Review | 513869 |
Construction | Original | A | 6/29/2011 | MICHAELA | MICHAELA | | | Construction | 513868 |
Hazmat | Original | A | 6/27/2011 | CSFIRE | CSFIRE | bin to go to RBD | rembres | Hazmat | 513347 |
CO Springs Fire | Original | D | 6/27/2011 | CSFIRE | CSFIRE | bin to go to RBd | rembres | CO Springs Fire | 513346 |
Hazmat | Original | D | 6/27/2011 | CSFIRE | CSFIRE | Awaiting additional CO2 information on submittal | rembres | Hazmat | 513344 |
CO Springs Fire | Original | D | 6/27/2011 | CSFIRE | CSFIRE | Submitted By: Embres, Rhonda C (see full review) | csfdit | CO Springs Fire | 513343 |
Fire | Original | / | 6/24/2011 | | JANE | Location = Fire by JANE | | Fire | 513128 |
Mechanical | Original | A | 6/24/2011 | DALEH | DALEH | | | Mechanical | 513116 |
Mechanical | Original | / | 6/23/2011 | DALEH | DALEH | In Current Review by DALEH | | Mechanical | 513057 |
Mechanical | Original | / | 6/22/2011 | | MINDY | Location = Mechanical by MINDY | | Mechanical | 512788 |
Plan Coordinator | Original | / | 6/22/2011 | | SHELBY | Location = Plan Coordinator by SHELBY | | Plan Coordinator | 512779 |
Electrical | Original | A | 6/22/2011 | SHELBY | SHELBY | | | Electrical | 512777 |
Electrical | Original | / | 6/20/2011 | SHELBY | SHELBY | In Current Review by SHELBY | | Electrical | 512373 |
Electrical | Original | / | 6/20/2011 | | MINDY | Location = Electrical by MINDY | | Electrical | 512333 |
Plan Coordinator | Original | / | 6/20/2011 | | SHELLEY | Location = Plan Coordinator by SHELLEY | | Plan Coordinator | 512330 |
Construction | Original | D | 6/20/2011 | SHELLEY | SHELLEY | Several partitions not indicated with partition type; missing listed assembly for ceiliing C-5; still need clarification on exit enclosure exit on A1.01; see plans; walk ok. | | Construction | 512329 |
Construction | Original | / | 6/17/2011 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Construction | 512114 |
Construction | Original | / | 6/16/2011 | | BPHILLIPS | Location = Construction by BPHILLIPS | | Construction | 511987 |
Resubmittal 1 | Original | / | 6/16/2011 | BPHILLIPS | BPHILLIPS | Resubmittal #1 | | Resubmittal 1 | 511986 |
Out to Review | Original | / | 6/8/2011 | MINDY | MINDY | Tom 473 7225 | | Out to Review | 510714 |
Finished Bin | Original | / | 6/7/2011 | | MINDY | Location = Finished Bin by MINDY | | Finished Bin | 510371 |
Hazmat | Original | D | 6/6/2011 | CSFIRE | CSFIRE | Additional Information on Carbon Dioxide if any is needed before any review can occur | csfdit | Hazmat | 510327 |
CO Springs Fire | Original | D | 6/6/2011 | CSFIRE | CSFIRE | refer to review report attached to plans | csfdit | CO Springs Fire | 510326 |
Fire | Original | / | 6/2/2011 | | CSZONING | Location = Fire by CSZONING | Dtortorice | Fire | 509803 |
Fire | Original | / | 6/2/2011 | | CSZONING | Location = Fire by CSZONING | Dtortorice | Fire | 509802 |
Zoning/Planning | Original | / | 6/2/2011 | | MINDY | Location = Zoning/Planning by MINDY | | Zoning/Planning | 509684 |
Mechanical | Original | D | 6/2/2011 | DALEH | DALEH | a complete review has not been done at this time need construction comments addressed prior to mechanical need to have mech. drawing backgrounds match archit. once rbd comments have been addressed need to darken up backgrounds for scanning purposes | | Mechanical | 509682 |
Mechanical | Original | / | 6/2/2011 | DALEH | DALEH | In Current Review by DALEH | | Mechanical | 509672 |
CO Springs DRE | Original | A | 6/2/2011 | CSZONING | CSZONING | Interior Remodle to first floor. Any work to area that will be uses as a gym/fitness or cafeteria are for employees of building only, otherwise, an amendment to the development plan, AR DPA 00-177-A2MN10 will be required to address parking per Thelen. | Dtortorice | CO Springs DRE | 509801 |
Mechanical | Original | / | 5/24/2011 | | MINDY | Location = Mechanical by MINDY | | Mechanical | 508538 |
Plan Coordinator | Original | / | 5/24/2011 | | SHELBY | Location = Plan Coordinator by SHELBY | | Plan Coordinator | 508532 |
Electrical | Original | D | 5/24/2011 | SHELBY | SHELBY | label all new and relocated electrical equipment with panel and circuit number. | | Electrical | 508531 |
Electrical | Original | / | 5/23/2011 | SHELBY | SHELBY | In Current Review by SHELBY | | Electrical | 508524 |
Plumbing | Original | N | 5/18/2011 | JOEL | JOEL | no plumbing work | | Plumbing | 507724 |
Electrical | Original | / | 5/18/2011 | JOEL | JOEL | In Current Review by JOEL | | Electrical | 507719 |
Electrical | Original | / | 5/17/2011 | | MINDY | Location = Electrical by MINDY | | Electrical | 507486 |
Plan Coordinator | Original | / | 5/17/2011 | | SHELLEY | Location = Plan Coordinator by SHELLEY | | Plan Coordinator | 507468 |
Construction | Original | D | 5/17/2011 | SHELLEY | SHELLEY | clarify ratings indicated on CA1.0; clarify elevator lobbies; clarify stair egress from stair 1; 2 exits required from Event room 1021; clarify exit door requirements in folding partitions on A1.04 and A6.10; see plans for all comments; no walk. | | Construction | 507467 |
Construction | Original | / | 5/17/2011 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Construction | 507416 |
Construction | Original | / | 5/17/2011 | | MINDY | Location = Construction by MINDY | | Construction | 507410 |
Floodplain | Original | N | 5/17/2011 | AMY | AMY | | | Floodplain | 507401 |
Enumeration | Original | A | 5/17/2011 | AMY | AMY | see site included plan sheet #1. | | Enumeration | 507398 |
Plan Coordinator | Original | / | 5/17/2011 | | AMY | Location = Plan Coordinator by AMY | | Plan Coordinator | 507397 |