Plumbing | Splice 10/3/12 | A | 10/3/2012 | TCRIPPEN | TCRIPPEN | see clouds | | Plumbing | 590390 |
Construction | 9/5/12 Truss Submittal | A | 9/18/2012 | JAY | JAY | Per phone conversation w/ John Stevens of MLA Eng (seattle) Revised truss calcs are OK | | Construction | 586921 |
Out to Review | 9/5/12 Truss Submittal | / | 9/18/2012 | BPHILLIPS | BPHILLIPS | Marty 510 5463 | | Out to Review | 586878 |
Finished Bin | 9/5/12 Truss Submittal | / | 9/7/2012 | | JANE | Location = Finished Bin by JANE | | Finished Bin | 584873 |
Plan Coordinator | 9/5/12 Truss Submittal | / | 9/7/2012 | | SHELLEY | Location = Plan Coordinator by SHELLEY | | Plan Coordinator | 584831 |
Construction | 9/5/12 Truss Submittal | D | 9/7/2012 | SHELLEY | SHELLEY | Need final, not prelim, truss layout; engineer must accept trusses without revisions; walk ok. | | Construction | 584830 |
Construction | 9/5/12 Truss Submittal | / | 9/7/2012 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Construction | 584829 |
Construction | 9/5/12 Truss Submittal | / | 9/5/2012 | | BPHILLIPS | Location = Construction by BPHILLIPS | | Construction | 584485 |
Plumbing | 8/21/2012 | A | 8/21/2012 | TCRIPPEN | TCRIPPEN | new pages see clouds | | Plumbing | 581525 |
Construction | 4/17/12 - Structural Details | A | 4/17/2012 | SHELLEY | SHELLEY | shotcrete engineering | | Construction | 559760 |
CSU Contract Admin. | Original | A | 9/15/2011 | KIM | KIM | CSU RECEIPTS 4767565792, 6952864433, 4681333447 | | CSU Contract Admin. | 526201 |
Out to Review | Original | / | 9/15/2011 | KIM | KIM | MATT 510-3839 | | Out to Review | 526200 |
Scanned/Finished Bin | Original | / | 9/12/2011 | | JANE | Location = Scanned/Finished Bin by JANE | | Scanned/Finished Bin | 525654 |
CSU Contract Admin. | Original | D | 9/9/2011 | CSUAPPSPRM | CSUAPPSPRM | Development fees due for new services to proposed buildings (x5), please contact Bryan English at 668-8119 or Chris Quinn 668-8252 - Plan taken downstairs | cquinn | CSU Contract Admin. | 525487 |
To Be Scanned Bin | Original | / | 9/9/2011 | | MINDY | Location = To Be Scanned Bin by MINDY | | To Be Scanned Bin | 525489 |
CSU Contract Admin. | Original | D | 9/9/2011 | MINDY | MINDY | 09/09/11 | | CSU Contract Admin. | 525488 |
Gas/Elec. Utils | Original | A | 9/9/2011 | CSUREVIEW | CSUREVIEW | Per CSU Field Engineer, Tony Colvin, all issues have been addressed. | awerner | Gas/Elec. Utils | 525400 |
CSU Contract Admin. | Original | / | 9/8/2011 | | MINDY | Location = CSU Contract Admin. by MINDY | | CSU Contract Admin. | 525320 |
Water Division | Original | A | 9/8/2011 | CSUREVIEW | CSUREVIEW | Per approved CDs. And approved DP Plan too heavy to carry downstairs to RBD. Plan is ready for p/u at Utilities CCA front counter to be taken to RBD. | awerner | Water Division | 525308 |
Waste Water Div | Original | A | 9/8/2011 | CSUREVIEW | CSUREVIEW | Per approved CDs. And attached DP | awerner | Waste Water Div | 525307 |
Gas/Elec. Utils | Original | D | 9/8/2011 | CSUREVIEW | CSUREVIEW | Contact CSU Field Engineer, Tony Colvin at 668-5768 for review of load data, transformer locations, etc. | awerner | Gas/Elec. Utils | 525306 |
CO Springs Fire | Original | A | 9/8/2011 | CSFIRE | CSFIRE | Submitted By: Embres, Rhonda C
routed to utilities | csfdit | CO Springs Fire | 525178 |
CSU Utilities | Original | / | 9/6/2011 | | MINDY | Location = CSU Utilities by MINDY | | CSU Utilities | 524762 |
City Engr (SERT) | Original | A | 9/1/2011 | CSENGINEER | CSENGINEER | left for Utilities review. | csengineer | City Engr (SERT) | 524421 |
City Engr (SERT) | Original | D | 8/31/2011 | CSENGINEER | CSENGINEER | Requires an approved grading and erosion control plan in the building permit set. Routed to Utilities. | csengineer | City Engr (SERT) | 524011 |
CO Springs Fire | Original | D | 8/30/2011 | CSFIRE | CSFIRE | Submitted By: Embres, Rhonda C
routed to utitlities (see full review) | csfdit | CO Springs Fire | 523759 |
Fire | Original | / | 8/25/2011 | | CSZONING | Location = Fire by CSZONING | Dtortorice | Fire | 523387 |
CO Springs DRE | Original | A | 8/25/2011 | CSZONING | CSZONING | New building, new equipment building and tent structure. Per AR DP 01-247-A1MN09 AND AR UP 09-227. | Dtortorice | CO Springs DRE | 523386 |
Hazmat | Original | A | 8/23/2011 | CSFIRE | CSFIRE | Submitted By: Yeager, Kay A | csfirehm | Hazmat | 522941 |
Hazmat | Original | / | 8/17/2011 | | CSFIRE | Location = Hazmat by CSFIRE | csfdit | Hazmat | 521975 |
CO Springs Fire | Original | D | 8/17/2011 | CSFIRE | CSFIRE | each structure is assigned its own review number by CSFD - please refer to review reports included with plans; all review numbers provided on back of plan set | csfdit | CO Springs Fire | 521974 |
Health Dept. | Original | A | 8/16/2011 | HEALTHDEPT | HEALTHDEPT | No plan review required. NM 8/16/2011 | mayescr | Health Dept. | 521770 |
Fire | Original | / | 8/11/2011 | | CSZONING | Location = Fire by CSZONING | Dtortorice | Fire | 520995 |
CO Springs DRE | Original | D | 8/11/2011 | CSZONING | CSZONING | New building, new equipment building and tent structure. Attach the stamped approved development plan and issuance of building permit top unplatted lands, (AR UP), to submittal for review. | Dtortorice | CO Springs DRE | 520994 |
Plumbing | Original | A | 8/8/2011 | TCRIPPEN | TCRIPPEN | P-100 not approved was told it was removed | | Plumbing | 520017 |
Out to Review | Original | / | 8/8/2011 | AMY | AMY | Matt | | Out to Review | 520003 |
Enumeration | Original | A | 8/8/2011 | AMY | AMY | site plan submitted with legal description. | | Enumeration | 520002 |
Zoning/Planning | Original | / | 8/4/2011 | | MINDY | Location = Zoning/Planning by MINDY | | Zoning/Planning | 519739 |
Plan Coordinator | Original | / | 8/4/2011 | | TCRIPPEN | Location = Plan Coordinator by TCRIPPEN | | Plan Coordinator | 519738 |
Mechanical | Original | A | 8/4/2011 | RUSSELL | RUSSELL | Changed out previously approved mechanical and gas pages | | Mechanical | 519737 |
Plumbing | Original | D | 8/3/2011 | TCRIPPEN | TCRIPPEN | pend plumbing fixture analysis do not look at p-100 and p-101 remove need to do green line review re look over entire set | | Plumbing | 519587 |
Plumbing | Original | / | 8/2/2011 | TCRIPPEN | TCRIPPEN | In Current Review by TCRIPPEN | | Plumbing | 519399 |
Plumbing | Original | / | 8/2/2011 | | MINDY | Location = Plumbing by MINDY | | Plumbing | 519320 |
Plan Coordinator | Original | / | 8/2/2011 | | JAY | Location = Plan Coordinator by JAY | | Plan Coordinator | 519278 |
Construction | Original | A | 8/2/2011 | JAY | JAY | Comments addressed: OK | | Construction | 519277 |
Construction | Original | / | 8/2/2011 | JAY | JAY | In Current Review by JAY | | Construction | 519269 |
Resubmittal 2 | Original | / | 8/1/2011 | MINDY | MINDY | Resubmittal #2 | | Resubmittal 2 | 519063 |
Out to Review | Original | / | 7/26/2011 | MINDY | MINDY | Matt 719 510 3839 | | Out to Review | 518075 |
Finished Bin | Original | / | 7/26/2011 | | MINDY | Location = Finished Bin by MINDY | | Finished Bin | 517961 |
Plumbing | Original | / | 7/25/2011 | | JANE | Location = Plumbing by JANE | | Plumbing | 517919 |
Plan Coordinator | Original | / | 7/25/2011 | | RUSSELL | Location = Plan Coordinator by RUSSELL | | Plan Coordinator | 517917 |
Mechanical | Original | A | 7/25/2011 | RUSSELL | RUSSELL | | | Mechanical | 517915 |
Mechanical | Original | / | 7/25/2011 | RUSSELL | RUSSELL | In Current Review by RUSSELL | | Mechanical | 517758 |
Mechanical | Original | / | 7/22/2011 | | MINDY | Location = Mechanical by MINDY | | Mechanical | 517422 |
Electrical | Original | A | 7/22/2011 | SHELBY | SHELBY | | | Electrical | 517415 |
Electrical | Original | / | 7/22/2011 | SHELBY | SHELBY | In Current Review by SHELBY | | Electrical | 517383 |
Electrical | Original | / | 7/21/2011 | | KIM | Location = Electrical by KIM | | Electrical | 517086 |
Resubmittal 1 | Original | / | 7/21/2011 | KIM | KIM | Resubmittal #1 ELECTRICAL AND MECHANICAL ONLY | | Resubmittal 1 | 517085 |
Out to Review | Original | / | 7/7/2011 | BPHILLIPS | BPHILLIPS | Eric 391-0061 | | Out to Review | 514765 |
Plan Coordinator | Original | / | 7/7/2011 | | RUSSELL | Location = Plan Coordinator by RUSSELL | | Plan Coordinator | 514760 |
Mechanical | Original | D | 7/7/2011 | RUSSELL | RUSSELL | See M5-101 and P5-101 for gas piping requirements per '03 IFGC,See sheet M-100 for ventilation requirements per '03 IMC and '03 IFC for LSS vault | | Mechanical | 514759 |
Mechanical | Original | / | 7/7/2011 | RUSSELL | RUSSELL | In Current Review by RUSSELL | | Mechanical | 514689 |
Mechanical | Original | / | 7/7/2011 | | MINDY | Location = Mechanical by MINDY | | Mechanical | 514651 |
Plan Coordinator | Original | / | 7/7/2011 | | SHELBY | Location = Plan Coordinator by SHELBY | | Plan Coordinator | 514650 |
Electrical | Original | D | 7/7/2011 | SHELBY | SHELBY | 1. Comply 250.24(A)(5) NEC. 2. Show SCCR for panel HPEL | | Electrical | 514649 |
Electrical | Original | / | 7/5/2011 | SHELBY | SHELBY | In Current Review by SHELBY | | Electrical | 514345 |
Electrical | Original | / | 6/27/2011 | | JANE | Location = Electrical by JANE | | Electrical | 513403 |
Plan Coordinator | Original | / | 6/27/2011 | | TCRIPPEN | Location = Plan Coordinator by TCRIPPEN | | Plan Coordinator | 513398 |
Plumbing | Original | D | 6/27/2011 | TCRIPPEN | TCRIPPEN | see red lines missing page P5-111 see 2003 IPC chapter 6 section 608.8 for labeling , provide water heater size analysis on plans to include IWH 1 and 2 are in coming water is 46 degrees sanitary lines shall not reduce in direction of flow freeze protection required on outside plumbing hoe are you complying with rest room requirements | | Plumbing | 513396 |
Plumbing | Original | / | 6/27/2011 | TCRIPPEN | TCRIPPEN | In Current Review by TCRIPPEN | | Plumbing | 513331 |
Plumbing | Original | / | 6/27/2011 | | BPHILLIPS | Location = Plumbing by BPHILLIPS | | Plumbing | 513322 |
Electrical | Original | / | 6/27/2011 | | BPHILLIPS | Location = Electrical by BPHILLIPS | | Electrical | 513321 |
Plan Coordinator | Original | / | 6/24/2011 | | JAY | Location = Plan Coordinator by JAY | | Plan Coordinator | 513319 |
Construction | Original | D | 6/24/2011 | JAY | JAY | Provide Soils report. Clarify H-4 occupancy as this would require sprinklers, does this meet the exception 1 or 2 of section 307.9? Revise prescriptive IECC form on life support building. See plans for any additional comments. WALK OK | | Construction | 513318 |
Construction | Original | / | 6/24/2011 | JAY | JAY | In Current Review by JAY | | Construction | 513236 |
Construction | Original | / | 6/24/2011 | | MINDY | Location = Construction by MINDY | | Construction | 513227 |
Plan Coordinator | Original | / | 6/24/2011 | | AMY | Location = Plan Coordinator by AMY | | Plan Coordinator | 513220 |
Enumeration | Original | D | 6/24/2011 | AMY | AMY | It is unclear as to which building will be constructed (more then 1?). Cloud area to be added on a site plan; Buildings and Tents, Label with North directional; site plan should give some land markers so that inspectors can find this area.Cody study form for legal description says See Attachment A- where is A?. *Is there a revised map of the Zoo with all buildings labeled that this office can have for future reference.* | | Enumeration | 513219 |
Out to Review | Original | / | 6/24/2011 | AMY | AMY | | | Out to Review | 513162 |
Floodplain | Original | N | 6/23/2011 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain | | Floodplain | 513015 |