Scanned/Finished Bin | Original | / | 2/28/2012 | | SHARON | Location = Scanned by SHARON AND GIVEN BACK TO CUSTOMER. | | Scanned/Finished Bin | 550962 |
Electrical | Original | A | 2/28/2012 | SHELBY | SHELBY | | | Electrical | 550949 |
Mechanical | Original | A | 2/28/2012 | DALEH | DALEH | | | Mechanical | 550901 |
Construction | Original | A | 2/28/2012 | SHELLEY | SHELLEY | | | Construction | 550884 |
Plumbing | Original | A | 2/28/2012 | TCRIPPEN | TCRIPPEN | | | Plumbing | 550883 |
Resubmittal 1 | Original | / | 2/28/2012 | BPHILLIPS | BPHILLIPS | Resubmittal #1 2/28/12 | | Resubmittal 1 | 550882 |
Out to Review | Original | / | 2/17/2012 | MINDY | MINDY | Paul w/ Executone 596 3530 | | Out to Review | 549490 |
Finished Bin | Original | / | 2/7/2012 | | MINDY | Location = Finished Bin by MINDY | | Finished Bin | 547441 |
CO Springs DRE | Original | N | 2/7/2012 | MINDY | MINDY | 01/31/12 dmt | | CO Springs DRE | 547440 |
Hazmat | Original | N | 2/2/2012 | CSFIRE | CSFIRE | | csfdit | Hazmat | 547080 |
CO Springs Fire | Original | A | 2/2/2012 | CSFIRE | CSFIRE | (see full review) | csfdit | CO Springs Fire | 547079 |
Zoning/Planning | Original | / | 1/27/2012 | | MINDY | Location = Zoning/Planning by MINDY | | Zoning/Planning | 546099 |
Mechanical | Original | D | 1/27/2012 | DALEH | DALEH | see complete green lines on plans return green lines with next review | | Mechanical | 546092 |
Mechanical | Original | / | 1/26/2012 | DALEH | DALEH | In Current Review by DALEH | | Mechanical | 545886 |
Mechanical | Original | / | 1/24/2012 | | MINDY | Location = Mechanical by MINDY | | Mechanical | 545438 |
Plan Coordinator | Original | / | 1/24/2012 | | SHELBY | Location = Plan Coordinator by SHELBY | | Plan Coordinator | 545433 |
Electrical | Original | D | 1/24/2012 | SHELBY | SHELBY | 1. Label all new and relocated electrical equipment/devices with panel and circuit number. 2. Provide complete one line. 3. Verify existing conditions prior to plan submittal. 4. Main circuit breaker on one line does not match panel schedule. 5. Supply side bonding jumper for panel LA sized incorrectly. 6. Show size of transformer GEC on one line. 7. Complete re review. | | Electrical | 545432 |
Electrical | Original | / | 1/20/2012 | SHELBY | SHELBY | In Current Review by SHELBY | | Electrical | 545000 |
Electrical | Original | / | 1/19/2012 | | MINDY | Location = Electrical by MINDY | | Electrical | 544764 |
Plan Coordinator | Original | / | 1/19/2012 | | TCRIPPEN | Location = Plan Coordinator by TCRIPPEN | | Plan Coordinator | 544762 |
Plumbing | Original | D | 1/19/2012 | TCRIPPEN | TCRIPPEN | your occupant load of 60 will require 2 rest rooms 1 drinking fountain and 1 mop sink , If using core rest rooms provide travel distance must be under 500 feet , rest rooms in stock rooms shall be for employees only , provide water pipe size analysis data on plans | | Plumbing | 544761 |
Plumbing | Original | / | 1/19/2012 | TCRIPPEN | TCRIPPEN | In Current Review by TCRIPPEN | | Plumbing | 544741 |
Plumbing | Original | / | 1/18/2012 | | MINDY | Location = Plumbing by MINDY | | Plumbing | 544626 |
Plan Coordinator | Original | / | 1/18/2012 | | MICHAELA | Location = Plan Coordinator by MICHAEL | | Plan Coordinator | 544613 |
Construction | Original | D | 1/18/2012 | MICHAELA | MICHAELA | Provide a U.L listed (or equal) horizontal assembly at rear door Missing 18" vertical grab bar on toilet room elevation drawing Walk-through OK | | Construction | 544611 |
Construction | Original | / | 1/18/2012 | MICHAELA | MICHAELA | In Current Review by MICHAEL | | Construction | 544546 |
Construction | Original | / | 1/18/2012 | | MINDY | Location = Construction by MINDY | | Construction | 544487 |
Plan Coordinator | Original | / | 1/18/2012 | | AMY | Location = Plan Coordinator by AMY | | Plan Coordinator | 544483 |
Floodplain | Original | N | 1/18/2012 | AMY | AMY | Zone X | | Floodplain | 544484 |
Enumeration | Original | A | 1/18/2012 | AMY | AMY | see site plan front page | | Enumeration | 544482 |