Mechanical | 10/30/14 | A | 11/12/2014 | TCRIPPEN | TCRIPPEN | new splice page removed note that reads shaft required because its not required | | Mechanical | 745072 |
Plumbing | 10/30/14 | A | 11/12/2014 | TCRIPPEN | TCRIPPEN | new splice pages re routing of water lines | | Plumbing | 745063 |
Electrical | 10/30/14 | A | 11/12/2014 | DOUG | DOUG | Covers RFI 20 pool bonding see E0.01B Covers Bulletin 10, 16, and 19 See Sheets E0.01B, E1.01B, E1.02B, E1.35, E1.36, E1.37, E2.10B, E2.21, E6.21 | | Electrical | 745058 |
Out to Review | 10/30/14 | / | 10/30/2014 | NELIDA | NELIDA | Chris walking 499-2866 | | Out to Review | 742951 |
Out to Review | 8/20/14 | / | 9/23/2014 | REBECCA | REBECCA | chris lanning 719-499-2866 | | Out to Review | 734466 |
Scanned/Finished Bin | 8/20/14 | / | 9/19/2014 | | KENYATTA | Location = Scanned/Finished Bin by KENYATTA | | Scanned/Finished Bin | 734034 |
Electrical | 8/20/14 | A | 9/19/2014 | SHELBY | SHELBY | | | Electrical | 734032 |
Mechanical | 8/20/14 | A | 9/19/2014 | DALEH | DALEH | | | Mechanical | 734021 |
Construction | 8/20/14 | N | 8/20/2014 | SHELLEY | SHELLEY | no construction changes | | Construction | 727858 |
Electrical | 8/20/14 | D | 8/20/2014 | DOUG | DOUG | 1. Provide circuit numbers for all devices. (see checklist) 2. Power plan 3. Lighting plan. 4. Panel schedule (see checklist) 5. Engineer certified. | | Electrical | 727856 |
Plumbing | 8/20/14 | N | 8/20/2014 | TCRIPPEN | TCRIPPEN | no plumbing work issue no permit | | Plumbing | 727838 |
Out to Review | 8/20/14 | / | 8/20/2014 | BPHILLIPS | BPHILLIPS | walking | | Out to Review | 727825 |
Scanned/Finished Bin | Original | / | 5/30/2014 | | REBECCA | Location = Scanned/Finished Bin by REBECCA | | Scanned/Finished Bin | 710952 |
To Be Scanned Bin | Original | / | 5/29/2014 | | RITA | Location = To Be Scanned Bin by RITA | | To Be Scanned Bin | 710422 |
Plan Coordinator | Original | / | 5/28/2014 | | DOUG | Location = Plan Coordinator by DOUG | | Plan Coordinator | 710342 |
Electrical | Original | A | 5/28/2014 | DOUG | DOUG | | | Electrical | 710341 |
Electrical | Original | / | 5/28/2014 | DOUG | DOUG | In Current Review by DOUG | | Electrical | 710293 |
Electrical | Original | / | 5/28/2014 | | RITA | Location = Electrical by RITA | | Electrical | 710171 |
Plan Coordinator | Original | / | 5/28/2014 | | MICHAELA | Location = Plan Coordinator by MICHAEL | | Plan Coordinator | 710160 |
Construction | Original | A | 5/28/2014 | MICHAELA | MICHAELA | | | Construction | 710158 |
Construction | Original | / | 5/28/2014 | MICHAELA | MICHAELA | In Current Review by MICHAEL | | Construction | 710143 |
Construction | Original | / | 5/28/2014 | | RITA | Location = Construction by RITA | | Construction | 710033 |
Plan Coordinator | Original | / | 5/28/2014 | | RUSSELL | Location = Plan Coordinator by RUSSELL | | Plan Coordinator | 710022 |
Mechanical | Original | A | 5/28/2014 | RUSSELL | RUSSELL | | | Mechanical | 710021 |
Mechanical | Original | / | 5/27/2014 | RUSSELL | RUSSELL | In Current Review by RUSSELL | | Mechanical | 709890 |
Mechanical | Original | / | 5/23/2014 | | KENYATTA | Location = Mechanical by KENYATTA | | Mechanical | 709557 |
Plan Coordinator | Original | / | 5/23/2014 | | JEANNINE | Location = Plan Coordinator by JEANNINE | | Plan Coordinator | 709549 |
Enumeration | Original | A | 5/23/2014 | JEANNINE | JEANNINE | Site plan showing requested information on 2AO.15. | | Enumeration | 709548 |
Enumeration | Original | / | 5/23/2014 | | REBECCA | Location = Enumeration by REBECCA | | Enumeration | 709475 |
Resubmittal 1 | Original | / | 5/23/2014 | REBECCA | REBECCA | Resubmittal #1 | | Resubmittal 1 | 709474 |
Out to Review | Original | / | 4/8/2014 | JANE | JANE | Carson | | Out to Review | 698991 |
Finished Bin | Original | / | 4/3/2014 | | RITA | Location = Finished Bin by RITA | | Finished Bin | 698077 |
Hazmat | Original | N | 4/1/2014 | CSFIRE | CSFIRE | rce
bin to go to RBD | csfdit | Hazmat | 697728 |
CO Springs Fire | Original | A | 4/1/2014 | CSFIRE | CSFIRE | Submitted By: Embres, Rhonda C
bin to go to RBD (see full review) | csfdit | CO Springs Fire | 697727 |
Fire | Original | / | 3/28/2014 | | COLMEDO | Location = Fire by COLMEDO | | Fire | 696970 |
CO Springs DRE | Original | N | 3/28/2014 | COLMEDO | COLMEDO | Interior remodel only - Suite 2B. (see full review) | | CO Springs DRE | 696969 |
Zoning/Planning | Original | / | 3/28/2014 | | KENYATTA | Location = Zoning/Planning by KENYATTA | | Zoning/Planning | 696886 |
Plan Coordinator | Original | / | 3/28/2014 | | JOHNW | Location = Plan Coordinator by JOHNW | | Plan Coordinator | 696876 |
Elevators | Original | N | 3/28/2014 | JOHNW | JOHNW | NO WORK BEING DONE ON THE ELEVATOR | | Elevators | 696875 |
Elevators | Original | / | 3/27/2014 | | RITA | Location = Elevators by RITA | | Elevators | 696640 |
Plan Coordinator | Original | / | 3/27/2014 | | SHELBY | Location = Plan Coordinator by SHELBY | | Plan Coordinator | 696562 |
Electrical | Original | D | 3/27/2014 | SHELBY | SHELBY | 1. Provide panel schedule for panel " provided by HATC contractor' ( see note 5 sheet E1.01B ). 2. Use 2009 IECC ( 2012 has not been adopted). | | Electrical | 696561 |
Electrical | Original | / | 3/27/2014 | SHELBY | SHELBY | In Current Review by SHELBY | | Electrical | 696523 |
Electrical | Original | / | 3/26/2014 | | RITA | Location = Electrical by RITA | | Electrical | 696258 |
Plan Coordinator | Original | / | 3/26/2014 | | RUSSELL | Location = Plan Coordinator by RUSSELL | | Plan Coordinator | 696236 |
Mechanical | Original | D | 3/26/2014 | RUSSELL | RUSSELL | Sheet M2.21, provide scheduling of existing unit (AHU?RTU) the is serving most of the remodeled space so that the O.A. can be verified through the FTU's and VAV's, verify location of R.A. up at location show for RTU-4,, R.A> over a wall? is the wall to deck? if not show how R.A. is ducted into HATC room, both units are over 300#'s, provide a letter from a structural engineer or engineering to setting of both new units, MAU-1 is scheduled at 6840 cfm, cfms at hood and diffusers total 6870?, kitchen and dish washing areas are at a 885 cfm negative, until O.A. can be determined by existing unit, the cfms provided by FTU-1-8 & FTU-1-9 can not be verified if adequate to make up the short fall from MAU-1, vented curb shown on the captive-aire drawing shall only be provided if the grease duct is routed in a 1 hour shaft, provide a section through the hood and grease duct showing the duct wrap or shaft with the termination point above the roof, sheet MG2.21 and MG2.30, indicates the gas piping is 2 psi (medium) pressure gas piping, where are the shut-off valves and the gas pressure regulator(s)?, all medium pressure gas piping shall be labeled every 6 feet per RBD amendment, provide length from most remote appliance (range/oven) to verify gas pipe sizes shown are adequate per '09 IFGC Table 402.4(3) & 402.4(2), show size of existing gas piping where new is to tie into to verify existing will handle added load based on length, size and load, NO WALK, return all red line comment sheets with re-submittal | | Mechanical | 696235 |
Mechanical | Original | / | 3/25/2014 | RUSSELL | RUSSELL | In Current Review by RUSSELL | | Mechanical | 696025 |
Mechanical | Original | / | 3/25/2014 | | KENYATTA | Location = Mechanical by KENYATTA | | Mechanical | 695901 |
Plan Coordinator | Original | / | 3/25/2014 | | TCRIPPEN | Location = Plan Coordinator by TCRIPPEN | | Plan Coordinator | 695900 |
Plumbing | Original | A | 3/25/2014 | TCRIPPEN | TCRIPPEN | | | Plumbing | 695897 |
Plumbing | Original | / | 3/25/2014 | | KENYATTA | Location = Plumbing by KENYATTA | | Plumbing | 695855 |
Plan Coordinator | Original | / | 3/25/2014 | | MICHAELA | Location = Plan Coordinator by MICHAEL | | Plan Coordinator | 695849 |
Construction | Original | D | 3/25/2014 | MICHAELA | MICHAELA | Provide a letter from a structural engineer indicating the existing roof structure is capable of supporting the new HVAC rooftop units Walk-through OK | | Construction | 695847 |
Construction | Original | / | 3/25/2014 | MICHAELA | MICHAELA | In Current Review by MICHAEL | | Construction | 695832 |
Construction | Original | / | 3/24/2014 | | KENYATTA | Location = Construction by KENYATTA | | Construction | 695676 |
Plan Coordinator | Original | / | 3/24/2014 | | JEANNINE | Location = Plan Coordinator by JEANNINE | | Plan Coordinator | 695629 |
Enumeration | Original | D | 3/24/2014 | JEANNINE | JEANNINE | There are a number of buildings on site at 1750 E. Boulder Street. Provide a site plan showing the site, access and label the buildings (each structure has an additional number attached) highlighting the structure where the work is to be completed. Building 2 has a 2, 2A, 2B, & 2C. Show the entire structure and the area of work. | | Enumeration | 695628 |
Floodplain | Original | N | 3/21/2014 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain | | Floodplain | 695463 |