Scanned/Finished Bin | 8/13/15 | / | 8/17/2015 | | KENYATTA | Location = Scanned/Finished Bin by KENYATTA | | Scanned/Finished Bin | 808279 |
Plan Coordinator | 8/13/15 | / | 8/14/2015 | | RUSSELL | Location = Plan Coordinator by RUSSELL | | Plan Coordinator | 808118 |
Mechanical | 8/13/15 | A | 8/14/2015 | RUSSELL | RUSSELL | | | Mechanical | 808117 |
Mechanical | 8/13/15 | / | 8/14/2015 | RUSSELL | RUSSELL | In Current Review by RUSSELL | | Mechanical | 808099 |
Mechanical | 8/13/15 | / | 8/13/2015 | | NELIDA | Location = Mechanical by NELIDA | | Mechanical | 807878 |
Plan Coordinator | 6/4/15 | / | 6/23/2015 | | JIMA | Location = Plan Coordinator by JIMA | | Plan Coordinator | 793852 |
Construction | 6/4/15 | A | 6/23/2015 | JIMA | JIMA | | | Construction | 793851 |
Construction | 6/4/15 | / | 6/23/2015 | JIMA | JIMA | In Current Review by JIMA | | Construction | 793848 |
Construction | 6/4/15 | / | 6/23/2015 | | REBECCA | Location = Construction by REBECCA | | Construction | 793836 |
Resubmittal 1 | 6/4/15 | / | 6/23/2015 | REBECCA | REBECCA | Resubmittal #1 | | Resubmittal 1 | 793835 |
Finished Bin | 6/4/15 | / | 6/8/2015 | | KENYATTA | Location = Finished Bin by KENYATTA | | Finished Bin | 790016 |
Plan Coordinator | 6/4/15 | / | 6/8/2015 | | JIMA | Location = Plan Coordinator by JIMA | | Plan Coordinator | 790014 |
Construction | 6/4/15 | D | 6/8/2015 | JIMA | JIMA | see note attached to truss detail package provide shop stamped roof drawing per the trusses pending note on page S1.1 in the original approved plans. also the original plan roof framing plan is not call out the truss connections, this must be provide and stamped by the engineer | | Construction | 790013 |
Construction | 6/4/15 | / | 6/8/2015 | JIMA | JIMA | In Current Review by JIMA | | Construction | 790006 |
Construction | 6/4/15 | / | 6/5/2015 | | KENYATTA | Location = Construction by KENYATTA | | Construction | 789935 |
Out to Review | 6/4/15 | / | 6/4/2015 | NELIDA | NELIDA | Trusses pending for mail room and clubhouse | | Out to Review | 789500 |
Scanned/Finished Bin | Splice 5/26/2015 | / | 5/27/2015 | | RITA | Location = Scanned/Finished Bin by RITA | | Scanned/Finished Bin | 787355 |
To Be Scanned Bin | Splice 5/26/2015 | / | 5/27/2015 | | RITA | Location = To Be Scanned Bin by RITA | | To Be Scanned Bin | 787333 |
Plan Coordinator | Splice 5/26/2015 | / | 5/27/2015 | | TCRIPPEN | Location = Plan Coordinator by TCRIPPEN | | Plan Coordinator | 787320 |
Plumbing | Splice 5/26/2015 | A | 5/27/2015 | TCRIPPEN | TCRIPPEN | new splice moved mop sink and drinking fountain | | Plumbing | 787318 |
Plumbing | Splice 5/26/2015 | / | 5/27/2015 | TCRIPPEN | TCRIPPEN | In Current Review by TCRIPPEN | | Plumbing | 787289 |
Plumbing | Splice 5/26/2015 | / | 5/27/2015 | | RUSSELL | Location = Plumbing by RUSSELL | | Plumbing | 787288 |
Mechanical | Splice 5/26/2015 | A | 5/27/2015 | RUSSELL | RUSSELL | | | Mechanical | 787287 |
Mechanical | Splice 5/26/2015 | / | 5/27/2015 | RUSSELL | RUSSELL | In Current Review by RUSSELL | | Mechanical | 787252 |
Mechanical | Splice 5/26/2015 | / | 5/26/2015 | | MINDY | Location = Mechanical by MINDY | | Mechanical | 787193 |
To Be Scanned Bin | Original | / | 2/9/2015 | | KENYATTA | Location = To Be Scanned Bin by KENYATTA | | To Be Scanned Bin | 760787 |
Health Dept. | Original | A | 2/9/2015 | HEALTHDEPT | HEALTHDEPT | Facility does not require plan review.GA 719-578-3295 | galvarez | Health Dept. | 760762 |
Health Dept. | Original | / | 2/6/2015 | | KENYATTA | Location = Health Dept. by KENYATTA | | Health Dept. | 760543 |
Gas/Elec. Utils | Original | A | 2/6/2015 | CSUREVIEW | CSUREVIEW | CSU Field Engineer to determine final meter/service/transformer/etc locations. to rbd | awerner | Gas/Elec. Utils | 760510 |
City Engr (SERT) | Original | N | 2/5/2015 | CSENGINEER | CSENGINEER | Plan routed to CSU Utilities. pvm | csengineer | City Engr (SERT) | 760354 |
CSU Utilities | Original | / | 2/3/2015 | | KENYATTA | Location = CSU Utilities by KENYATTA | | CSU Utilities | 759688 |
CSU Contract Admin. | Original | N | 2/3/2015 | CSUAPPSPRM | CSUAPPSPRM | No increase in demand this project, pool removed from building supply per plan | cquinn | CSU Contract Admin. | 759656 |
CSU Contract Admin. | Original | / | 1/30/2015 | | REBECCA | Location = CSU Contract Admin. by REBECCA | | CSU Contract Admin. | 759145 |
To Be Scanned Bin | Original | / | 1/30/2015 | | KENYATTA | Location = To Be Scanned Bin by KENYATTA | | To Be Scanned Bin | 759139 |
Plan Coordinator | Original | / | 1/30/2015 | | JIMA | Location = Plan Coordinator by JIMA | | Plan Coordinator | 759128 |
Construction | Original | A | 1/30/2015 | JIMA | JIMA | as corrected / trusses pending | | Construction | 759127 |
Construction | Original | / | 1/30/2015 | JIMA | JIMA | In Current Review by JIMA | | Construction | 759116 |
Construction | Original | / | 1/30/2015 | | REBECCA | Location = Construction by REBECCA | | Construction | 759079 |
Resubmittal 2 | Original | / | 1/30/2015 | REBECCA | REBECCA | Resubmittal #2 | | Resubmittal 2 | 759078 |
Out to Review | Original | / | 1/29/2015 | JANE | JANE | Pat 720 281 1438 | | Out to Review | 758804 |
Finished Bin | Original | / | 1/29/2015 | | RITA | Location = Finished Bin by RITA | | Finished Bin | 758796 |
Plan Coordinator | Original | / | 1/29/2015 | | RUSSELL | Location = Plan Coordinator by RUSSELL | | Plan Coordinator | 758775 |
Mechanical | Original | A | 1/29/2015 | RUSSELL | RUSSELL | Released for permit as noted on the plans | | Mechanical | 758774 |
Mechanical | Original | / | 1/29/2015 | RUSSELL | RUSSELL | In Current Review by RUSSELL | | Mechanical | 758734 |
Mechanical | Original | / | 1/29/2015 | | RITA | Location = Mechanical by RITA | | Mechanical | 758634 |
Plan Coordinator | Original | / | 1/29/2015 | | TCRIPPEN | Location = Plan Coordinator by TCRIPPEN | | Plan Coordinator | 758627 |
Plumbing | Original | A | 1/29/2015 | TCRIPPEN | TCRIPPEN | | | Plumbing | 758626 |
Plumbing | Original | / | 1/29/2015 | TCRIPPEN | TCRIPPEN | In Current Review by TCRIPPEN | | Plumbing | 758623 |
Plumbing | Original | / | 1/28/2015 | | RITA | Location = Plumbing by RITA | | Plumbing | 758597 |
Plan Coordinator | Original | / | 1/28/2015 | | JIMA | Location = Plan Coordinator by JIMA | | Plan Coordinator | 758592 |
Construction | Original | D | 1/28/2015 | JIMA | JIMA | see plans / walk ok provide com check for the envelope of the building for the addition which is being conditioned, / also panic hardware is required on all exit doors in a A3 occ. ( 1008.1 ) ( 1008.1.10 )--- TRUSSES PENDING -- | | Construction | 758591 |
Construction | Original | / | 1/28/2015 | JIMA | JIMA | In Current Review by JIMA | | Construction | 758526 |
Construction | Original | / | 1/23/2015 | | JANE | Location = Construction by JANE | | Construction | 757857 |
Resubmittal 1 | Original | / | 1/23/2015 | JANE | JANE | Resubmittal #1 | | Resubmittal 1 | 757856 |
Out to Review | Original | / | 1/15/2015 | REBECCA | REBECCA | Pat Fletcher 720-281-1438 | | Out to Review | 756433 |
Hazmat | Original | A | 1/14/2015 | CSFIRE | CSFIRE | | csfdit | Hazmat | 756353 |
CO Springs Fire | Original | A | 1/14/2015 | CSFIRE | CSFIRE | FIRE ALARM SYSTEM SHALL REMAIN OPERATIONAL DURING REMODEL WORK. (see full review) | csfdit | CO Springs Fire | 756352 |
Fire | Original | / | 1/12/2015 | | CSZONING | Location = Fire by CSZONING | bveltman | Fire | 755886 |
CO Springs DRE | Original | A | 1/12/2015 | RDCUSER | RDCUSER | Ok with approval of AR MA 00-00012-MM02 (see full review) | | CO Springs DRE | 755885 |
Fire | Original | / | 1/12/2015 | | RDCUSER | Location = Fire by RDCUSER | | Fire | 755884 |
CO Springs DRE | Original | A | 1/12/2015 | RDCUSER | RDCUSER | Ok with approval of AR MA 00-00012-MM02. (see full review) | | CO Springs DRE | 755883 |
Zoning/Planning | Original | / | 1/8/2015 | | MINDY | Location = Zoning/Planning by MINDY | | Zoning/Planning | 755516 |
Plumbing | Original | D | 1/8/2015 | TCRIPPEN | TCRIPPEN | gas pipe and related items to be on M-pages drinking fountain is a required fixture | | Plumbing | 755500 |
Plan Coordinator | Original | / | 1/8/2015 | | TCRIPPEN | Location = Plan Coordinator by TCRIPPEN | | Plan Coordinator | 755499 |
Plumbing | Original | / | 1/8/2015 | TCRIPPEN | TCRIPPEN | In Current Review by TCRIPPEN | | Plumbing | 755483 |
Plumbing | Original | / | 1/8/2015 | | MINDY | Location = Plumbing by MINDY | | Plumbing | 755450 |
Plan Coordinator | Original | / | 1/8/2015 | | RUSSELL | Location = Plan Coordinator by RUSSELL | | Plan Coordinator | 755437 |
Mechanical | Original | D | 1/8/2015 | RUSSELL | RUSSELL | Need note added to plans, Provide a test and balance report to the mechanical inspector at time of the heating final inspection, separate out the plumbing and the mechanical, see attached 8 1/2 x 11 sheet, that also indicates gas to be on a "M" sheet, not a "P" sheet, developed gas piping length appears to be short based on gas piping layout on current sheet P2.2, ventilation needs to be provided per 2009 IMC Table 403.3, not 2012, cannot locate EF-2 on plan and verify EF-3 location and us where furnaces may require combustion air?, efficiency rating not given in schedule for existing furnaces, appears grille/register/diffuser schedule is lacking in number of items scheduled, need and exhaust soffitt grille, some are either located in a hard lid or lay-in while others are sidewall but labeled the same?, plus more, see plans for additional comments | | Mechanical | 755436 |
Image Server | Original | / | 1/8/2015 | RUSSELL | RUSSELL | In Current Review by RUSSELL | | Image Server | 755372 |
Image Server | Original | / | 1/8/2015 | | MINDY | Location = Image Server by MINDY | | Image Server | 755371 |
Plan Coordinator | Original | / | 1/7/2015 | | SHELBY | Location = Plan Coordinator by SHELBY | | Plan Coordinator | 755340 |
Electrical | Original | A | 1/7/2015 | SHELBY | SHELBY | | | Electrical | 755339 |
Electrical | Original | / | 1/7/2015 | SHELBY | SHELBY | In Current Review by SHELBY | | Electrical | 755223 |
Electrical | Original | / | 1/7/2015 | | MINDY | Location = Electrical by MINDY | | Electrical | 755210 |
Plan Coordinator | Original | / | 1/7/2015 | | JIMA | Location = Plan Coordinator by JIMA | | Plan Coordinator | 755207 |
Construction | Original | D | 1/7/2015 | JIMA | JIMA | see plans / no walk provide com check for envelope for the addition areas if being heated / occupancy of building is an A3 not B / door swing / door hardware / wrong nec code / separate permit required for the existing mail room conversion / fireplace ?? call it out type and approved by ? ICC? - UL ? // provide enlarged bathroom plan with all ANSI requirements called out / roof dead load on plans is incorrect at 15psf- all engineering must be done at 25psf dead load for tile roof / soils letter provided is not referenced on the engineered notes page S2.1 | | Construction | 755206 |
Construction | Original | / | 1/6/2015 | JIMA | JIMA | In Current Review by JIMA | | Construction | 755127 |
Construction | Original | / | 1/6/2015 | | KENYATTA | Location = Construction by KENYATTA | | Construction | 755110 |
Plan Coordinator | Original | / | 1/6/2015 | | JEANNINE | Location = Plan Coordinator by JEANNINE | | Plan Coordinator | 755086 |
Enumeration | Original | A | 1/6/2015 | JEANNINE | JEANNINE | | | Enumeration | 755085 |
Floodplain | Original | N | 1/5/2015 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain | | Floodplain | 754904 |