Mechanical | 12/22/15 | A | 12/29/2015 | JUSTINC | JUSTINC | provided structural letter for relocated MAU, | | Mechanical | 838394 |
Construction | 12/22/15 | A | 12/29/2015 | DANM | DANM | Relocating makeup air unit with supporting engineer letter | | Construction | 838383 |
Mechanical | 12/22/15 | D | 12/22/2015 | JUSTINC | JUSTINC | need structural letter for relocated MAU Per Tim C. gas pipe sizing too small | | Mechanical | 837502 |
To Be Scanned Bin | Original | / | 10/16/2015 | | KENYATTA | Location = To Be Scanned Bin by KENYATTA | | To Be Scanned Bin | 823631 |
Waste Water Div | Original | A | 10/16/2015 | CSUREVIEW | CSUREVIEW | No new grease interceptor required as per Variance letter from Kim Caltrider (CSU Industrial Pre-Treatment). (mt_10/16/2015) | mtroche | Waste Water Div | 823598 |
CSU Utilities | Original | / | 10/15/2015 | | RITA | Location = CSU Utilities by RITA | | CSU Utilities | 823308 |
Plan Coordinator | Original | / | 10/15/2015 | | RUSSELL | Location = Plan Coordinator by RUSSELL | | Plan Coordinator | 823279 |
Mechanical | Original | A | 10/15/2015 | RUSSELL | RUSSELL | | | Mechanical | 823278 |
Mechanical | Original | / | 10/15/2015 | RUSSELL | RUSSELL | In Current Review by RUSSELL | | Mechanical | 823250 |
Mechanical | Original | / | 10/15/2015 | | RITA | Location = Mechanical by RITA | | Mechanical | 823240 |
Plan Coordinator | Original | / | 10/14/2015 | | TCRIPPEN | Location = Plan Coordinator by TCRIPPEN | | Plan Coordinator | 823209 |
Plumbing | Original | A | 10/14/2015 | TCRIPPEN | TCRIPPEN | Not requiring water pipe size analysis data for this remodel.All fixtures to be listed and accessible | | Plumbing | 823208 |
Plumbing | Original | / | 10/14/2015 | TCRIPPEN | TCRIPPEN | In Current Review by TCRIPPEN | | Plumbing | 823181 |
Plumbing | Original | / | 10/14/2015 | | RITA | Location = Plumbing by RITA | | Plumbing | 823180 |
Mechanical | Original | / | 10/14/2015 | | RITA | Location = Mechanical by RITA | | Mechanical | 822983 |
Plan Coordinator | Original | / | 10/13/2015 | | SHELBY | Location = Plan Coordinator by SHELBY | | Plan Coordinator | 822705 |
Electrical | Original | A | 10/13/2015 | SHELBY | SHELBY | | | Electrical | 822704 |
Electrical | Original | / | 10/13/2015 | SHELBY | SHELBY | In Current Review by SHELBY | | Electrical | 822692 |
Electrical | Original | / | 10/12/2015 | | JANE | Location = Electrical by JANE | | Electrical | 822458 |
Resubmittal 2 | Original | / | 10/12/2015 | JANE | JANE | Resubmittal #2 | | Resubmittal 2 | 822457 |
Out to Review | Original | / | 9/29/2015 | JANE | JANE | | | Out to Review | 819406 |
Finished Bin | Original | / | 9/28/2015 | | BPHILLIPS | Location = Finished Bin by BPHILLIPS | | Finished Bin | 819285 |
Waste Water Div | Original | D | 9/25/2015 | CSUREVIEW | CSUREVIEW | Same comment as of 7/17/2015. Taken plan set to RBD counter down stairs. | ajuvera | Waste Water Div | 818798 |
CSU Utilities | Original | / | 9/24/2015 | | CSFIRE | Location = CSU Utilities by CSFIRE | wtaylor | CSU Utilities | 818387 |
Hazmat | Original | N | 9/24/2015 | CSFIRE | CSFIRE | | wtaylor | Hazmat | 818385 |
CO Springs Fire | Original | A | 9/24/2015 | CSFIRE | CSFIRE | Submitted By: Taylor II, Wyman L (see full review) | csfdit | CO Springs Fire | 818384 |
Fire | Original | / | 9/22/2015 | | KENYATTA | Location = Fire by KENYATTA | | Fire | 817608 |
Plan Coordinator | Original | / | 9/22/2015 | | RUSSELL | Location = Plan Coordinator by RUSSELL | | Plan Coordinator | 817569 |
Mechanical | Original | D | 9/22/2015 | RUSSELL | RUSSELL | See plans for comments | | Mechanical | 817567 |
Mechanical | Original | / | 9/21/2015 | RUSSELL | RUSSELL | In Current Review by RUSSELL | | Mechanical | 817411 |
Mechanical | Original | / | 9/17/2015 | | RITA | Location = Mechanical by RITA | | Mechanical | 816954 |
Plan Coordinator | Original | / | 9/17/2015 | | TCRIPPEN | Location = Plan Coordinator by TCRIPPEN | | Plan Coordinator | 816934 |
Plumbing | Original | D | 9/17/2015 | TCRIPPEN | TCRIPPEN | Plumbing and mechanical to be on separate pages see are web site. | | Plumbing | 816933 |
Plumbing | Original | / | 9/17/2015 | TCRIPPEN | TCRIPPEN | In Current Review by TCRIPPEN | | Plumbing | 816902 |
Plumbing | Original | / | 9/17/2015 | | RITA | Location = Plumbing by RITA | | Plumbing | 816889 |
Plan Coordinator | Original | / | 9/17/2015 | | DOUG | Location = Plan Coordinator by DOUG | | Plan Coordinator | 816843 |
Electrical | Original | D | 9/17/2015 | DOUG | DOUG | 1. Provide load calculations for FCM-1 and FCM-2 | | Electrical | 816842 |
Electrical | Original | / | 9/16/2015 | DOUG | DOUG | In Current Review by DOUG | | Electrical | 816439 |
Electrical | Original | / | 9/16/2015 | AMY | AMY | In Current Review by AMY | | Electrical | 816438 |
Electrical | Original | / | 9/16/2015 | | RITA | Location = Electrical by RITA | | Electrical | 816374 |
Plan Coordinator | Original | / | 9/16/2015 | | MICHAELA | Location = Plan Coordinator by MICHAELA | | Plan Coordinator | 816341 |
Construction | Original | A | 9/16/2015 | MICHAELA | MICHAELA | | | Construction | 816340 |
Construction | Original | / | 9/16/2015 | MICHAELA | MICHAELA | In Current Review by MICHAELA | | Construction | 816333 |
Construction | Original | / | 9/15/2015 | | KENYATTA | Location = Construction by KENYATTA | | Construction | 816299 |
Plan Coordinator | Original | / | 9/15/2015 | | JEANNINE | Location = Plan Coordinator by JEANNINE | | Plan Coordinator | 816262 |
Enumeration | Original | A | 9/15/2015 | JEANNINE | JEANNINE | See cover sheet for detailed site plan included by applicant. | | Enumeration | 816261 |
Enumeration | Original | / | 9/14/2015 | | JANE | Location = Enumeration by JANE | | Enumeration | 815882 |
Resubmittal 1 | Original | / | 9/14/2015 | JANE | JANE | Resubmittal #1 | | Resubmittal 1 | 815881 |
Health Dept. | Original | A | 7/23/2015 | HEALTHDEPT | HEALTHDEPT | Pre-operational inspection will be required before final approval for opening is granted. Michelle 578-3295 | galvarez | Health Dept. | 801619 |
Out to Review | Original | / | 7/21/2015 | JANE | JANE | Dan 303 514 6107 | | Out to Review | 800912 |
Finished Bin | Original | / | 7/20/2015 | | KENYATTA | Location = Finished Bin by KENYATTA | | Finished Bin | 800352 |
Health Dept. | Original | D | 7/20/2015 | HEALTHDEPT | HEALTHDEPT | Plan review required. GA 578-3295 | galvarez | Health Dept. | 800337 |
Health Dept. | Original | / | 7/17/2015 | | KENYATTA | Location = Health Dept. by KENYATTA | | Health Dept. | 800066 |
Water Division | Original | N | 7/17/2015 | CSUREVIEW | CSUREVIEW | No changes to service lines proposed. (mt_7/17/2015) | mtroche | Water Division | 800008 |
Waste Water Div | Original | D | 7/17/2015 | CSUREVIEW | CSUREVIEW | A grease interceptor is required and all fixtures inside the kitchen are required to be connected to the grease interceptor. Copy of the approved utility construction plans for the grease interceptor is required to be included to this permit set. (mt_7/17/2015) | mtroche | Waste Water Div | 800007 |
CSU Utilities | Original | / | 7/15/2015 | | CSFIRE | Location = CSU Utilities by CSFIRE | csfdit | CSU Utilities | 799326 |
Hazmat | Original | D | 7/15/2015 | CSFIRE | CSFIRE | | csfdit | Hazmat | 799323 |
CO Springs Fire | Original | D | 7/15/2015 | CSFIRE | CSFIRE | (see full review) | csfdit | CO Springs Fire | 799322 |
Fire | Original | / | 7/9/2015 | | DTORTORICE | Location = Fire by DTORTORICE | | Fire | 797672 |
CO Springs DRE | Original | N | 7/9/2015 | DTORTORICE | DTORTORICE | INTERIOR FINISH IN MALL FOR FAMOUS WOK (see full review) | | CO Springs DRE | 797671 |
Zoning/Planning | Original | / | 7/2/2015 | | RITA | Location = Zoning/Planning by RITA | | Zoning/Planning | 796153 |
Plan Coordinator | Original | / | 7/2/2015 | | DOUG | Location = Plan Coordinator by DOUG | | Plan Coordinator | 796108 |
Electrical | Original | D | 7/2/2015 | DOUG | DOUG | Provide electrical
See checklist at http://goo.gl/6J5cXj | | Electrical | 796107 |
Electrical | Original | / | 7/2/2015 | DOUG | DOUG | In Current Review by DOUG | | Electrical | 796104 |
Electrical | Original | / | 7/2/2015 | | RITA | Location = Electrical by RITA | | Electrical | 795984 |
Plan Coordinator | Original | / | 7/2/2015 | | TCRIPPEN | Location = Plan Coordinator by TCRIPPEN | | Plan Coordinator | 795955 |
Plumbing | Original | D | 7/2/2015 | TCRIPPEN | TCRIPPEN | Provide a Engineer stamped plumbing page. All gas pipe and related items to be on the M-pages. Provide an water pipe size analysis data on plans. | | Plumbing | 795954 |
Plumbing | Original | / | 7/2/2015 | TCRIPPEN | TCRIPPEN | In Current Review by TCRIPPEN | | Plumbing | 795935 |
Plumbing | Original | / | 7/2/2015 | | RITA | Location = Plumbing by RITA | | Plumbing | 795934 |
Plan Coordinator | Original | / | 7/2/2015 | | RUSSELL | Location = Plan Coordinator by RUSSELL | | Plan Coordinator | 795932 |
Mechanical | Original | D | 7/2/2015 | RUSSELL | RUSSELL | Need mechanical page(s), need roof plan for gas piping to makeup air unit and to equipment in tenant remodel, need to show the interlocks of equipment, cannot just have set up to run during occupied hours, need letter from a structural engineer since makeup air unit weighs over 300#'s, need gas piping plan with gas routing sizing, etc., need size of CO2 tank for soda dispensing, for FIRE, if over 100#'s, need to provide with CO2 detector, sensor and alarm and FIRE may required continuous exhaust ventilation based on size, need to provide a test and balance report to the mechanical inspector at time of the heating final inspection,NO WALK | | Mechanical | 795931 |
Mechanical | Original | / | 7/1/2015 | RUSSELL | RUSSELL | In Current Review by RUSSELL | | Mechanical | 795570 |
Mechanical | Original | / | 7/1/2015 | | RITA | Location = Mechanical by RITA | | Mechanical | 795497 |
Plan Coordinator | Original | / | 7/1/2015 | | MICHAELA | Location = Plan Coordinator by MICHAELA | | Plan Coordinator | 795489 |
Construction | Original | D | 7/1/2015 | MICHAELA | MICHAELA | The building type of construction is V-B Verify that the existing walls adjacent to the new type 1 hoods are of non-combustible construction to a point 18" away from the hood. Walk-through OK | | Construction | 795488 |
Construction | Original | / | 6/30/2015 | MICHAELA | MICHAELA | In Current Review by MICHAELA | | Construction | 795382 |
Construction | Original | / | 6/29/2015 | | KENYATTA | Location = Construction by KENYATTA | | Construction | 794950 |
Floodplain | Original | N | 6/29/2015 | JEANNINE | JEANNINE | | | Floodplain | 794929 |
Plan Coordinator | Original | / | 6/29/2015 | | JEANNINE | Location = Plan Coordinator by JEANNINE | | Plan Coordinator | 794928 |
Enumeration | Original | D | 6/29/2015 | JEANNINE | JEANNINE | Site plan is too vague--it shows a location and nothing else to verify the suite number; location. Provide a copy of the floor plan for that floor showing all suites with numbers provided and locate the area of work. | | Enumeration | 794927 |