Construction | Original | A | 3/8/2016 | MICHAELA | MICHAELA | | | Construction | 852997 |
Electrical | Original | A | 3/8/2016 | SHELBY | SHELBY | | | Electrical | 852978 |
Electrical | Original | D | 3/3/2016 | SHELBY | SHELBY | Configure service per CSU specifications | | Electrical | 851932 |
Out to Review | Original | / | 2/19/2016 | BPHILLIPS | BPHILLIPS | Kristin 720 878 6534 | | Out to Review | 849178 |
Finished Bin | Original | / | 2/9/2016 | | KENYATTA | Location = Finished Bin by KENYATTA | | Finished Bin | 846564 |
Gas/Elec. Utils | Original | A | 2/8/2016 | CSUREVIEW | CSUREVIEW | no apparent conflicts between electric and gas meter locations CQ | cquinn_ds | Gas/Elec. Utils | 846068 |
CSU Utilities | Original | / | 2/8/2016 | | KENYATTA | Location = CSU Utilities by KENYATTA | | CSU Utilities | 845872 |
Plan Coordinator | Original | / | 2/8/2016 | | SHELBY | Location = Plan Coordinator by SHELBY | | Plan Coordinator | 845829 |
Electrical | Original | D | 2/8/2016 | SHELBY | SHELBY | Please provide foot print of entire structure showing all disconnects serving the structure ( this is necessary to verify 230.2 NEC compliance). | | Electrical | 845828 |
Electrical | Original | / | 2/4/2016 | SHELBY | SHELBY | In Current Review by SHELBY | | Electrical | 845441 |
Electrical | Original | / | 2/4/2016 | | RITA | Location = Electrical by RITA | | Electrical | 845116 |
Plan Coordinator | Original | / | 2/3/2016 | | TCRIPPEN | Location = Plan Coordinator by TCRIPPEN | | Plan Coordinator | 845097 |
Plumbing | Original | A | 2/3/2016 | TCRIPPEN | TCRIPPEN | | | Plumbing | 845096 |
Plumbing | Original | / | 2/3/2016 | TCRIPPEN | TCRIPPEN | In Current Review by TCRIPPEN | | Plumbing | 845079 |
Plumbing | Original | / | 2/3/2016 | | RITA | Location = Plumbing by RITA | | Plumbing | 845013 |
Plan Coordinator | Original | / | 2/3/2016 | | MICHAELA | Location = Plan Coordinator by MICHAELA | | Plan Coordinator | 844992 |
Construction | Original | D | 2/3/2016 | MICHAELA | MICHAELA | Still missing soils report - must be referenced in foundation design Provide all detail for fire wall compliance See plan Walk with Michael only | | Construction | 844980 |
Construction | Original | / | 2/3/2016 | MICHAELA | MICHAELA | In Current Review by MICHAELA | | Construction | 844947 |
Construction | Original | / | 2/3/2016 | | RITA | Location = Construction by RITA | | Construction | 844857 |
Resubmittal 1 | Original | / | 2/3/2016 | RITA | RITA | Resubmittal #1 | | Resubmittal 1 | 844856 |
Out to Review | Original | / | 1/15/2016 | BPHILLIPS | BPHILLIPS | Kristin 720 878 6534 | | Out to Review | 841508 |
Finished Bin | Original | / | 1/14/2016 | | MINDY | Location = Finished Bin by MINDY | | Finished Bin | 841259 |
Waste Water Div | Original | N | 1/14/2016 | CSUREVIEW | CSUREVIEW | No new utility connections proposed. Existing wastewater service to be used. Plans returned to RBD counter. TJV 1/14/16 | tvazansky | Waste Water Div | 841251 |
Water Division | Original | N | 1/14/2016 | CSUREVIEW | CSUREVIEW | No new utility connections proposed. Existing water meter to be used. Plans returned to RBD counter. TJV 1/14/16 | tvazansky | Water Division | 841252 |
Gas/Elec. Utils | Original | D | 1/14/2016 | CSUREVIEW | CSUREVIEW | Need to show separation of new electric panel from existing gas meter on building elevation plan. 3' separation required. Plans returned to RBD counter. TJV 1/14/16 | tvazansky | Gas/Elec. Utils | 841243 |
City Engr | Original | A | 1/12/2016 | CSENGINEER | CSENGINEER | routed to CSU Utilities. pvm | csengineer | City Engr | 840825 |
CO Springs Fire | Original | N | 1/8/2016 | CSFIRE | CSFIRE | | csfdit | CO Springs Fire | 840380 |
Fire | Original | / | 1/5/2016 | | LTHELEN | Location = Fire by LTHELEN | | Fire | 839598 |
CO Springs DRE | Original | A | 1/5/2016 | LTHELEN | LTHELEN | ok to permit (see full review) | | CO Springs DRE | 839597 |
Zoning/Planning | Original | / | 12/30/2015 | | RITA | Location = Zoning/Planning by RITA | | Zoning/Planning | 838866 |
Plan Coordinator | Original | / | 12/30/2015 | | SHELBY | Location = Plan Coordinator by SHELBY | | Plan Coordinator | 838852 |
Electrical | Original | D | 12/30/2015 | SHELBY | SHELBY | Provide one line and detail for relocated gear ( see note 6). | | Electrical | 838851 |
Electrical | Original | / | 12/30/2015 | SHELBY | SHELBY | In Current Review by SHELBY | | Electrical | 838792 |
Electrical | Original | / | 12/23/2015 | | RITA | Location = Electrical by RITA | | Electrical | 837949 |
Plumbing | Original | D | 12/23/2015 | TCRIPPEN | TCRIPPEN | Provide separate pages for plumbing and mechanical per are web site.provide a water pipe size analysis data on plans,show existing sand oil interceptor on plans. P-trap and vent required for trench drain,Provide sizes on your water lines. | | Plumbing | 837881 |
Plumbing | Original | / | 12/23/2015 | TCRIPPEN | TCRIPPEN | In Current Review by TCRIPPEN | | Plumbing | 837858 |
Plumbing | Original | / | 12/21/2015 | | KENYATTA | Location = Plumbing by KENYATTA | | Plumbing | 837301 |
Plan Coordinator | Original | / | 12/21/2015 | | JUSTINC | Location = Plan Coordinator by JUSTINC | | Plan Coordinator | 837295 |
Mechanical | Original | A | 12/21/2015 | JUSTINC | JUSTINC | | | Mechanical | 837293 |
Mechanical | Original | / | 12/21/2015 | JUSTINC | JUSTINC | In Current Review by JUSTINC | | Mechanical | 837235 |
Construction | Original | D | 12/21/2015 | MICHAELA | MICHAELA | Missing soils report Provide all required listings for fire resistance-rated assemblies Indicate how all of the requirements of IBC section 706, Fire Wall, are being met. No walk-through | | Construction | 837176 |
Mechanical | Original | / | 12/21/2015 | | KENYATTA | Location = Mechanical by KENYATTA | | Mechanical | 837159 |
Plan Coordinator | Original | / | 12/21/2015 | | MICHAELA | Location = Plan Coordinator by MICHAELA | | Plan Coordinator | 837137 |
Construction | Original | / | 12/21/2015 | MICHAELA | MICHAELA | In Current Review by MICHAELA | | Construction | 837050 |
Construction | Original | / | 12/16/2015 | | RITA | Location = Construction by RITA | | Construction | 836378 |
Plan Coordinator | Original | / | 12/16/2015 | | BRENT | Location = Plan Coordinator by BRENT | | Plan Coordinator | 836371 |
Enumeration | Original | A | 12/16/2015 | BRENT | BRENT | | | Enumeration | 836369 |
Floodplain | Original | N | 12/16/2015 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain | | Floodplain | 836348 |
Floodplain | Original | N | 12/16/2015 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain | | Floodplain | 836347 |