Mechanical | Original | A | 10/21/2016 | DALEH | DALEH | | | Mechanical | 912503 |
Hazmat | Original | N | 10/21/2016 | CSFIRE | CSFIRE | | rpeterson | Hazmat | 912494 |
CO Springs Fire | Original | N | 10/21/2016 | CSFIRE | CSFIRE | Submitted By: Peterson, Roland Thomas (see full review) | csfdit | CO Springs Fire | 912493 |
Mechanical | Original | D | 10/20/2016 | DALEH | DALEH | How providing R/A for grow room #2? How providing heat to offices off of grow room @2? What is R/A path?
RETURN RED LINE COMMENT SHEETS WALK OK (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Mechanical | 912314 |
Construction | Original | N | 10/20/2016 | MICHAELA | MICHAELA | Reduced scope of work | | Construction | 912300 |
Out to Review | Original | / | 10/20/2016 | MINDY | MINDY | | | Out to Review | 912293 |
Fire | Original | / | 10/14/2016 | | MMCCONNELL | Location = Fire by MMCCONNELL | | Fire | 911033 |
CO Springs DRE | Original | N | 10/14/2016 | MMCCONNELL | MMCCONNELL | interior remodel MMJ lis # 724859 (see full review) | | CO Springs DRE | 911032 |
Zoning/Planning | Original | / | 10/11/2016 | | JESSICAM | Location = Zoning/Planning by JESSICAM | | Zoning/Planning | 910000 |
Plan Coordinator | Original | / | 10/11/2016 | | TCRIPPEN | Location = Plan Coordinator by TCRIPPEN | | Plan Coordinator | 909979 |
Mechanical | Original | D | 10/7/2016 | DALEH | DALEH | Need construction comments addressed prior to mechanical review | | Mechanical | 909090 |
Mechanical | Original | / | 10/7/2016 | DALEH | DALEH | In Current Review by DALEH | | Mechanical | 908971 |
Mechanical | Original | / | 10/5/2016 | | RITA | Location = Mechanical by RITA | | Mechanical | 908306 |
Plan Coordinator | Original | / | 10/5/2016 | | SHELBY | Location = Plan Coordinator by SHELBY | | Plan Coordinator | 908176 |
Electrical | Original | A | 10/5/2016 | SHELBY | SHELBY | MDP shown as existing on the plan will be replaced ( damaged) . New MDP will be 240.87 compliant. | | Electrical | 908175 |
Electrical | Original | / | 10/5/2016 | SHELBY | SHELBY | In Current Review by SHELBY | | Electrical | 908165 |
Electrical | Original | / | 10/3/2016 | | MINDY | Location = Electrical by MINDY | | Electrical | 907651 |
Plan Coordinator | Original | / | 10/3/2016 | | MICHAELA | Location = Plan Coordinator by MICHAELA | | Plan Coordinator | 907551 |
Construction | Original | D | 10/3/2016 | MICHAELA | MICHAELA | Revise the plan to reflect the current scope of work Revise the Code Study form to reflect the current scope of work Provide a letter from a design professional indicating the existing roof structure is adequate to support the new RTU units No walk-through | | Construction | 907550 |
Construction | Original | / | 10/3/2016 | MICHAELA | MICHAELA | In Current Review by MICHAELA | | Construction | 907542 |
Construction | Original | / | 9/30/2016 | | MINDY | Location = Construction by MINDY | | Construction | 907411 |
Plan Coordinator | Original | / | 9/30/2016 | | BRENT | Location = Plan Coordinator by BRENT | | Plan Coordinator | 907404 |
Enumeration | Original | A | 9/30/2016 | BRENT | BRENT | | | Enumeration | 907403 |
Floodplain | Original | N | 9/30/2016 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain | | Floodplain | 907313 |