Canceled Plans | Original | / | 7/2/2018 | ADMIN | ADMIN | Electronic Plan automatically cancelled due to inactivity. | | Canceled Plans | 1085510 | Electrical | Original | D | 1/9/2018 | SHELBY | SHELBY | Please comply with previous review comment 2 (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1027012 | Construction | Original | D | 1/3/2018 | SHELLEY | SHELLEY | Roof connection appears to have changed. Remove all documents that do not belong in the roof connection PDF and locate them where the appropriately belong in the submittal. Provide roof connection system along with supporting documentation for loads used; Sheet 4 of the Calculations PDF should be a part of the roof connection PDF and stamped by the design professional of record. See plans. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1025356 | Resubmittal 1 | Original | / | 1/2/2018 | BECKYA | BECKYA | Resubmittal #1 | | Resubmittal 1 | 1025233 | Electrical | Original | D | 11/3/2017 | SHELBY | SHELBY | 1. Missing approval letter from MTVE. 2. Remove REC meter from site plan and one line. 3. Include method of attaching the equipment ground to the rack ( snap rack) with specifications. Please remember to upload all specifications with the rack grounding specification. 4. Show location of utility mandated A/C disconnect on site plan. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1009698 | County Zoning | Original | N | 10/31/2017 | DSDARCHULETA | DSDARCHULETA | ROOF MOUNTED DOES NOT CHANGE LOT COVERAGE | | County Zoning | 1008732 | Construction | Original | D | 10/31/2017 | SHELLEY | SHELLEY | Move all grounding documentation to electrical sheets; remove all unnecessary pages; provide Kwikseal specs. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1008585 | Enumeration | Original | A | 10/31/2017 | BRENT | BRENT | | | Enumeration | 1008393 | Electronic Plan | Original | / | 10/31/2017 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 1008387 | Floodplain | Original | N | 10/27/2017 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 4307204086) | | Floodplain | 1007894 |
|
| |
|