Construction | Splice 8/31/18 | A | 1/18/2019 | DANM | DANM | Added deck with related foundation; new floor plan & elevations for deck; floor framing for sunken master shower | | Construction | 1150947 |
Electronic Plan | Splice 8/31/18 | / | 1/18/2019 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 1150938 |
Resubmittal 2 | Splice 8/31/18 | / | 1/18/2019 | BECKYA | BECKYA | Resubmittal #2 | | Resubmittal 2 | 1150936 |
CO Springs DRE | Splice 8/31/18 | A | 1/16/2019 | RDCUSER | RDCUSER | All development standards met. New deck 10'12', 3 ft in height. uncovered. (see full review) | | CO Springs DRE | 1150382 |
Construction | Splice 8/31/18 | D | 1/16/2019 | DANM | DANM | Provide revised floor plan, exterior elevation(s) and site plan showing new deck (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1150128 |
CO Springs DRE | Splice 8/31/18 | D | 1/16/2019 | RDCUSER | RDCUSER | 10'x12' deck is encroaching into rear yard setback. A pre-application meeting is required to discuss a possible non-use variance. (see full review) | | CO Springs DRE | 1150112 |
Resubmittal 1 | Splice 8/31/18 | / | 1/16/2019 | BECKYA | BECKYA | Resubmittal #1 | | Resubmittal 1 | 1150071 |
CO Springs DRE | Splice 8/31/18 | D | 9/5/2018 | KHYLLESTED | KHYLLESTED | Revised hillside site plan is required for changes to building footprint. (see full review) | | CO Springs DRE | 1106449 |
Zoning/Planning | Splice 8/31/18 | / | 8/31/2018 | KHYLLESTED | KHYLLESTED | In Current Review by KHYLLESTED | | Zoning/Planning | 1105824 |
Construction | Splice 8/31/18 | D | 8/31/2018 | DANM | DANM | Provide revised floor plan, exterior elevation(s) and site plan showing new deck
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1105760 |
Electronic Plan | Splice 8/31/18 | / | 8/31/2018 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 1105747 |
Mechanical | Original | A | 6/18/2018 | DALEH | DALEH | re-approved | | Mechanical | 1080511 |
CO Springs DRE | Original | A | 6/14/2018 | KHYLLESTED | KHYLLESTED | New SFR - all development standards met. (see full review) | | CO Springs DRE | 1079999 |
Resubmittal 8 | Original | / | 6/14/2018 | BECKYA | BECKYA | Resubmittal #8 | | Resubmittal 8 | 1079995 |
CO Springs DRE | Original | D | 6/14/2018 | KHYLLESTED | KHYLLESTED | Include the approved GECP and approved geohazard in the submittal. Site plan looks good. (see full review) | | CO Springs DRE | 1079965 |
Enumeration | Original | A | 6/14/2018 | AMY | AMY | | | Enumeration | 1079870 |
Electronic Plan | Original | / | 6/14/2018 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 1079866 |
Resubmittal 7 | Original | / | 6/13/2018 | BECKYA | BECKYA | Resubmittal #7 | | Resubmittal 7 | 1079331 |
CO Springs DRE | Original | D | 6/6/2018 | KHYLLESTED | KHYLLESTED | Please address previous review comments. (see full review) | | CO Springs DRE | 1076792 |
Zoning/Planning | Original | / | 6/4/2018 | KHYLLESTED | KHYLLESTED | In Current Review by KHYLLESTED | | Zoning/Planning | 1075770 |
Construction | Original | A | 6/4/2018 | DANM | DANM | | | Construction | 1075756 |
Enumeration | Original | A | 6/4/2018 | AMY | AMY | | | Enumeration | 1075646 |
Electronic Plan | Original | / | 6/4/2018 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 1075645 |
Resubmittal 6 | Original | / | 5/31/2018 | BECKYA | BECKYA | Resubmittal #6 | | Resubmittal 6 | 1074510 |
CO Springs DRE | Original | D | 5/29/2018 | KHYLLESTED | KHYLLESTED | Address previous review comments: 1. Insufficient site plan - add: stockpile/equipment storage location, limit of disturbance line, utility service line location and type, drainage pattern locations, significant natural features, signed hillside certification statement. The hillside site plan is a separate document from the grading and erosion control plan. 2. Update the geologic hazard disclosure statement on the hillside site plan. 3. Signed hillside certification statement needs to be on the hillside site plan. 4. Submit approved grading and erosion control plan - approval must come from the Water Resources Engineering Department. 5. Signed and approved geologic hazard application must be uploaded prior to issuance of a building permit. Contact Katelyn Hyllested at khyllested@springsgov.com with questions. (see full review) | | CO Springs DRE | 1073439 |
Zoning/Planning | Original | / | 5/29/2018 | KHYLLESTED | KHYLLESTED | In Current Review by KHYLLESTED | | Zoning/Planning | 1073278 |
Zoning/Planning | Original | / | 5/29/2018 | RTEIXEIRA2 | RTEIXEIRA2 | In Current Review by RTEIXEIRA | | Zoning/Planning | 1073276 |
Zoning/Planning | Original | / | 5/24/2018 | KHYLLESTED | KHYLLESTED | In Current Review by KHYLLESTED | | Zoning/Planning | 1072242 |
Construction | Original | D | 5/24/2018 | DANM | DANM | Keynotes from Sheet A6.1 are now missing (shown on original approved drawings)
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1072155 |
Electronic Plan | Original | / | 5/23/2018 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 1072052 |
Enumeration | Original | A | 5/23/2018 | AMY | AMY | | | Enumeration | 1072002 |
Resubmittal 5 | Original | / | 5/23/2018 | BECKYA | BECKYA | Resubmittal #5 | | Resubmittal 5 | 1071663 |
CO Springs Fire | Original | A | 5/18/2018 | CSFIRE | CSFIRE | | rpeterson | CO Springs Fire | 1070381 |
CO Springs DRE | Original | D | 5/16/2018 | KHYLLESTED | KHYLLESTED | Address previous review comments: 1. Insufficient site plan - add: stockpile/equipment storage location, limit of disturbance line, utility service line location and type, drainage pattern locations, significant natural features, signed hillside certification statement. The hillside site plan is a separate document from the grading and erosion control plan. 2. Update the geologic hazard disclosure statement on the hillside site plan. 3. Signed hillside certification statement needs to be on the hillside site plan. 4. Submit approved grading and erosion control plan - approval must come from the Water Resources Engineering Department. 5. Signed and approved geologic hazard application must be uploaded prior to issuance of a building permit. (see full review) | | CO Springs DRE | 1069003 |
Zoning/Planning | Original | / | 5/11/2018 | KHYLLESTED | KHYLLESTED | In Current Review by KHYLLESTED | | Zoning/Planning | 1067860 |
Construction | Original | D | 5/11/2018 | DANM | DANM | Structural Plans PDF should only contain the originally approved two framing plan sheets that were stamped by the structural engineer
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1067821 |
Electronic Plan | Original | / | 5/11/2018 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 1067813 |
Enumeration | Original | A | 5/11/2018 | AMY | AMY | | | Enumeration | 1067794 |
Resubmittal 4 | Original | / | 5/11/2018 | BECKYA | BECKYA | Resubmittal #4 | | Resubmittal 4 | 1067777 |
CO Springs Fire | Original | D | 5/10/2018 | CSFIRE | CSFIRE | This is our 4th review of these plans and you have not addressed any of the comments from the previous reviews.
Missing fire flow report from CSU with map you can request a fire flow report at this website: https://www.csu.org/CSUDocuments/requestfireflowreport.pdf
Additionally, lap siding must be of ignition resistant materials such as fiber cement board - wood product is not permitted. | dwithee | CO Springs Fire | 1066948 |
CO Springs DRE | Original | D | 5/3/2018 | KHYLLESTED | KHYLLESTED | Address previous review comments: 1. Insufficient site plan - hillside site plan checklist emailed to applicant, missing items are circled. The hillside site plan is a separate document from the grading and erosion control plan. 2. Update the geologic hazard disclosure statement on the hillside site plan. 3. Signed hillside certification statement needs to be on the hillside site plan. 4. Submit approved grading and erosion control plan - approval must come from the Water Resources Engineering Department. 5. Signed and approved geologic hazard application must be uploaded prior to issuance of a building permit. (see full review) | | CO Springs DRE | 1064817 |
Zoning/Planning | Original | / | 5/2/2018 | KHYLLESTED | KHYLLESTED | In Current Review by KHYLLESTED | | Zoning/Planning | 1064137 |
Enumeration | Original | D | 5/2/2018 | BRENT | BRENT | See comments from 03/30/18 (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Enumeration | 1063975 |
Resubmittal 3 | Original | / | 5/1/2018 | BECKYA | BECKYA | Resubmittal #3 | | Resubmittal 3 | 1063508 |
CO Springs Fire | Original | D | 4/10/2018 | CSFIRE | CSFIRE | | rpeterson | CO Springs Fire | 1056098 |
CO Springs DRE | Original | D | 4/2/2018 | KHYLLESTED | KHYLLESTED | 1. Insufficient site plan - hillside site plan checklist emailed to applicant, missing items are circled. The hillside site plan is a separate document from the grading and erosion control plan. 2. Update the geologic hazard disclosure statement on the hillside site plan. 3. Signed hillside certification statement needs to be on the hillside site plan. 4. Submit approved grading and erosion control plan - approval must come from the Water Resources Engineering Department. 5. Signed and approved geologic hazard application must be uploaded prior to issuance of a building permit. (see full review) | | CO Springs DRE | 1053081 |
Zoning/Planning | Original | / | 3/30/2018 | KHYLLESTED | KHYLLESTED | In Current Review by KHYLLESTED | | Zoning/Planning | 1052689 |
Enumeration | Original | D | 3/30/2018 | BRENT | BRENT | New site plan is missing the tax schedule number and legal description (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Enumeration | 1052245 |
Resubmittal 2 | Original | / | 3/30/2018 | BECKYA | BECKYA | Resubmittal #2 | | Resubmittal 2 | 1052231 |
CO Springs DRE | Original | D | 2/13/2018 | KHYLLESTED | KHYLLESTED | Insufficient site plan. Please use to the hillside site plan checklist for revisions. Make sure setbacks and development plan requirements are met. A geologic hazard waiver or report is required prior to approval. Grading and erosion control plan is also required and must be approved by Water Resources Engineering Department prior to approval/resubmittal. Katelyn Hyllested met with Caleb Snider 2/13/18 to discuss hillside site plan requirements. All associated applications and guides were provided, including: geohazard waiver application, geologic hazard report application, process explanations, hillside site plan checklist, hillside height calculation guide, grading & erosion control plan checklist and submittal contact info. (see full review) | | CO Springs DRE | 1037412 |
CO Springs Fire | Original | D | 2/12/2018 | CSFIRE | CSFIRE | Submitted By: Peterson, Roland Thomas (see full review) | csfdit | CO Springs Fire | 1036751 |
Mechanical | Original | A | 2/12/2018 | DALEH | DALEH | | | Mechanical | 1036567 |
Zoning/Planning | Original | / | 2/9/2018 | KHYLLESTED | KHYLLESTED | In Current Review by KHYLLESTED | | Zoning/Planning | 1036378 |
Construction | Original | A | 2/9/2018 | DANM | DANM | | | Construction | 1036180 |
Resubmittal 1 | Original | / | 2/8/2018 | BECKYA | BECKYA | Resubmittal #1 | | Resubmittal 1 | 1036007 |
CO Springs DRE | Original | D | 1/31/2018 | KHYLLESTED | KHYLLESTED | Insufficient site plan. Please use to the hillside site plan checklist for revisions, emailed to: caleb.snider@gjgardner.com. Make sure setbacks are met. Grading and erosion control plan and geologic hazard report or waiver REQUIRED prior to approval. All relevant applications will be emailed. Additional review periods for the grading & erosion control plan and geohazard report will apply, and the applications must be signed by city engineering, stormwater and city planning prior to resubmittal. Please contact Katelyn Hyllested at 719-385-7347 or khyllested@springsgov.com with any questions. (see full review) | | CO Springs DRE | 1033715 |
CO Springs DRE | Original | D | 1/31/2018 | KHYLLESTED | KHYLLESTED | Insufficient site plan. Please use to the hillside site plan checklist for revisions, emailed to: caleb.snider@gjgardner.com. Make sure setbacks are met. Please contact Katelyn Hyllested at 719-385-7347 or khyllested@springsgov.com with any questions. (see full review) | | CO Springs DRE | 1033714 |
CO Springs Fire | Original | D | 1/30/2018 | CSFIRE | CSFIRE | Submitted By: Taylor II, Wyman L (see full review) | csfdit | CO Springs Fire | 1032764 |
Zoning/Planning | Original | / | 1/29/2018 | KHYLLESTED | KHYLLESTED | In Current Review by KHYLLESTED | | Zoning/Planning | 1032330 |
Mechanical | Original | D | 1/26/2018 | DALEH | DALEH | all mechanical documents must reflect the address (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Mechanical | 1032306 |
Electronic Plan | Original | / | 1/26/2018 | DALEH | DALEH | In Current Review by DALEH | | Electronic Plan | 1032304 |
Construction | Original | D | 1/26/2018 | DANM | DANM | No structural review completed - provide engineer stamped truss designs
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1032266 |
Electronic Plan | Original | / | 1/26/2018 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 1032251 |
Enumeration | Original | A | 1/25/2018 | BRENT | BRENT | | | Enumeration | 1031949 |
Floodplain | Original | N | 1/24/2018 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 7401310015) | | Floodplain | 1031257 |