Mechanical | Original | A | 4/5/2018 | JUSTINC | JUSTINC | | | Mechanical | 1054306 | Construction | Original | A | 4/4/2018 | LBENNETT | LBENNETT | | | Construction | 1054066 | Electronic Plan | Original | / | 4/4/2018 | LBENNETT | LBENNETT | In Current Review by LBENNETT | | Electronic Plan | 1054065 | Resubmittal 1 | Original | / | 4/4/2018 | DANM | DANM | Resubmittal #1 | | Resubmittal 1 | 1053905 | Mechanical | Original | D | 4/3/2018 | JUSTINC | JUSTINC | MECHANICAL REVIEW INCOMPLETE
All mechanical notes shown on (A) sheets to be reset if new sheets are added. Garages indicated as heated. Will require a separate heatloss calculation and HVAC equipment certificate. Verify square footage indicated in heatloss calculation with plan label? They do not appear to match.
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Mechanical | 1053318 | County Zoning | Original | A | 4/2/2018 | DSDRANGEL | DSDRANGEL | | | County Zoning | 1053051 | Zoning/Planning | Original | / | 3/30/2018 | DSDRANGEL | DSDRANGEL | In Current Review by DSDRANGEL | | Zoning/Planning | 1052529 | Construction | Original | D | 3/30/2018 | LBENNETT | LBENNETT | Master bedroom window on rear elevation doesn’t match floor/framing plans Provide landing framing For 1.5” gypcrete, use floor dead load of 33.75# Specify stair opening framing members as marked Insufficient beams as marked Additional bearing required, as marked, for roof trusses Incorrect hangers identified for floor framing in dining room Specify typical deck posts Missing bearing wall identifier @ master bath/garage wall Correct mislabeled roof trusses (G02 & T10E) and provide bearing, post size, and uplift connector for G02
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1052491 | Electronic Plan | Original | / | 3/28/2018 | LBENNETT | LBENNETT | In Current Review by LBENNETT | | Electronic Plan | 1051198 | Enumeration | Original | A | 3/20/2018 | BRENT | BRENT | | | Enumeration | 1048890 | Floodplain | Original | N | 3/20/2018 | BRENT | BRENT | Floodplain on parcel. not near area of work | | Floodplain | 1048889 | Floodplain | Original | / | 3/16/2018 | RBD GIS | RBD GIS | Autogenerated Review: Parcel intersects with 100 Year Floodplain. (Parcel: 6228005028) | | Floodplain | 1047852 |
|
| |
|