Electrical | Original | A | 9/18/2020 | SHELBY | SHELBY | | | Electrical | 1385488 |
Resubmittal 4 | Original | / | 9/16/2020 | BECKYA | BECKYA | Resubmittal #4 | | Resubmittal 4 | 1383735 |
Electrical | Original | D | 9/15/2020 | SHELBY | SHELBY | For battery enclosure ventilation must be through positive pressure. Two openings are required one low with fan pushing and one high venting to the outside. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1382924 |
Resubmittal 3 | Original | / | 9/11/2020 | BECKYA | BECKYA | Resubmittal #3 | | Resubmittal 3 | 1381505 |
Electrical | Original | D | 9/10/2020 | DANIELG | DANIELG | Missing battery box detail.
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1380981 |
Electronic Plan | Original | / | 9/10/2020 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1380885 |
County Zoning | Original | A | 9/10/2020 | DSDESPINOZA | DSDESPINOZA | Addition Approved: Approved previously approved PV Solar Ground Mount (39' x 13' x 7.33'). (see full review) | | County Zoning | 1380698 |
Resubmittal 2 | Original | / | 9/8/2020 | BECKYA | BECKYA | Resubmittal #2 | | Resubmittal 2 | 1379293 |
County Zoning | Original | A | 8/28/2020 | DSDESPINOZA | DSDESPINOZA | Addition Approved: 8/28/2020 Approved PV Solar Ground Mount (39' x 13' x 7.33'). (see full review) | | County Zoning | 1374643 |
Electrical | Original | D | 8/24/2020 | SHELBY | SHELBY | 1. Show over current device 4B on schedule. 2. For battery enclosure ventilation must be through positive pressure. Two openings are required one low with fan pushing and one high venting to the outside. 3. Please provide a load calculation for the building service. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1371190 |
Electronic Plan | Original | / | 8/18/2020 | SHELBY | SHELBY | In Current Review by SHELBY | | Electronic Plan | 1368621 |
Construction | Original | N | 8/17/2020 | SHELLEY | SHELLEY | Per plan, array height under 7', no building permit required. | | Construction | 1367807 |
Resubmittal 1 | Original | / | 8/17/2020 | JAY | JAY | Resubmittal #1 | | Resubmittal 1 | 1367466 |
Canceled Plans | Original | / | 4/26/2020 | ADMIN | ADMIN | Electronic Plan automatically cancelled due to inactivity. | | Canceled Plans | 1314447 |
Electrical | Original | D | 10/28/2019 | SHELBY | SHELBY | 1. Please provide floor plan of house showing location of all components located on or in the house. 2. Include equipment ground size type and quantity on one line. 3. Specify conductor and raceway size, type ,and quantity on one line. 4. Provide the following specifications. a. Charge controller b. Batteries ( with ventilation detail if necessary for battery type). c. D/C over current devices not integral to " hybrid Inverter" d. Module grounding ( per 690.43 NEC and 2703 UL typically found in the rack installation manual). (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1250599 |
County Zoning | Original | D | 10/11/2019 | DSDESPINOZA | DSDESPINOZA | PROVIDE DIMENSIONS (WxLxH) OF GROUND MOUNT PV SOLAR ARRAY AND SETBACK MEASUREMENTS TO FRONT, WEST SIDE, AND REAR LOT LINES. DEPICT DRIVEWAY FROM FLAG PORTION OF PARCEL. | | County Zoning | 1245337 |
Zoning/Planning | Original | / | 10/11/2019 | DSDESPINOZA | DSDESPINOZA | In Current Review by DSDESPINOZA | | Zoning/Planning | 1244907 |
Construction | Original | A | 10/11/2019 | SHELLEY | SHELLEY | | | Construction | 1244893 |
Floodplain | Original | N | 10/11/2019 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 5208000031) | | Floodplain | 1244870 |