Mechanical | Original | A | 9/11/2023 | RICHG | RICHG | | | Mechanical | 1898057 |
Electrical | Original | N | 9/11/2023 | RICHG | RICHG | | | Electrical | 1898055 |
Construction | Original | A | 9/11/2023 | CHRISTINEH | CHRISTINEH | | | Construction | 1898025 |
Out to Review | Original | / | 9/11/2023 | AMYP | AMYP | jeff walking 970-903-8448 | | Out to Review | 1897908 |
Mechanical (North) | Original | / | 9/11/2023 | | AMYP | Location = Mechanical (North) by AMYP | | Mechanical (North) | 1897857 |
Plan Coordinator (North) | Original | / | 9/11/2023 | | SHELLEY | Location = Plan Coordinator (North) by SHELLEY | | Plan Coordinator (North) | 1897850 |
Construction | Original | D | 9/11/2023 | SHELLEY | SHELLEY | Walk ok. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 1897849 |
Construction (North) | Original | / | 9/11/2023 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Construction (North) | 1897838 |
Construction (North) | Original | / | 9/7/2023 | | AMYP | Location = Construction (North) by AMYP | | Construction (North) | 1896739 |
Resubmittal 6 | Original | / | 9/7/2023 | AMYP | AMYP | Resubmittal #6 | | Resubmittal 6 | 1896738 |
Finished Bin (North) | Original | / | 9/6/2023 | | SCANNING | Location = Finished Bin (North) by SCANNING - READY FOR PICK UP. NO MEP'S IN PLAN - Homeowner taking plans from North | | Finished Bin (North) | 1895917 |
Mechanical (North) | Original | / | 9/6/2023 | | BRITNEY | Location = Mechanical (North) by BRITNEYP | | Mechanical (North) | 1895864 |
Finished Bin (North) | Original | / | 9/6/2023 | | SHELLEY | Location = Finished Bin (North) by SHELLEY | | Finished Bin (North) | 1895828 |
Construction | Original | D | 9/6/2023 | SHELLEY | SHELLEY | Missing all required plan attachments. Sending to finished bin for pickup. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 1895827 |
Construction (North) | Original | / | 9/5/2023 | | DANM | Location = Construction (North) by DANM | | Construction (North) | 1895228 |
Construction (Main) | Original | / | 9/5/2023 | | JANE | Location = Construction (Main) by JANE | | Construction (Main) | 1895067 |
Resubmittal 5 | Original | / | 8/31/2023 | JANE | JANE | Resubmittal #5 | | Resubmittal 5 | 1893885 |
Out to Review | Original | / | 1/12/2022 | JANE | JANE | Jeff 970 903 8448 | | Out to Review | 1620670 |
Finished Bin | Original | / | 1/12/2022 | | SCANNING | Location = Finished Bin by SCANNING | | Finished Bin | 1620380 |
Plan Coordinator | Original | / | 1/12/2022 | | DANM | Location = Plan Coordinator by DANM | | Plan Coordinator | 1620373 |
Construction | Original | A | 1/12/2022 | DANM | DANM | | | Construction | 1620371 |
Construction | Original | / | 1/11/2022 | DANM | DANM | In Current Review by DANM | | Construction | 1619957 |
Construction | Original | / | 1/11/2022 | | JANE | Location = Construction by JANE | | Construction | 1619634 |
Resubmittal 4 | Original | / | 1/11/2022 | JANE | JANE | Resubmittal #4 | | Resubmittal 4 | 1619633 |
Finished Bin | Original | / | 1/10/2022 | | SCANNING | Location = Finished Bin by SCANNING- NEED TO BE TAKEN TO MANITOU FIRE AND ZONING | | Finished Bin | 1618957 |
Plan Coordinator | Original | / | 1/10/2022 | | SHELLEY | Location = Plan Coordinator by SHELLEY | | Plan Coordinator | 1618933 |
Construction | Original | D | 1/10/2022 | SHELLEY | SHELLEY | No corrections made from previous review. Design professional stamp is required on floor framing for items indicated. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1618932 |
Construction | Original | / | 1/10/2022 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Construction | 1618903 |
Construction | Original | / | 1/6/2022 | | NELIDA | Location = Construction by NELIDA | | Construction | 1617814 |
Resubmittal 3 | Original | / | 1/6/2022 | NELIDA | NELIDA | Resubmittal #3 1/06/2022 | | Resubmittal 3 | 1617812 |
Out to Review | Original | / | 12/1/2021 | RITA | RITA | Jeff 970-903-8448 | | Out to Review | 1600942 |
Finished Bin | Original | / | 11/30/2021 | | SCANNING | Location = Finished Bin by SCANNING | | Finished Bin | 1600407 |
Plan Coordinator | Original | / | 11/30/2021 | | TCRIPPEN | Location = Plan Coordinator by TCRIPPEN | | Plan Coordinator | 1600309 |
Mechanical | Original | A | 11/30/2021 | TCRIPPEN | TCRIPPEN | Approved | | Mechanical | 1600306 |
Mechanical | Original | / | 11/29/2021 | | SCANNING | Location = Mechanical by SCANNING | | Mechanical | 1599379 |
Plan Coordinator | Original | / | 11/29/2021 | | SHELLEY | Location = Plan Coordinator by SHELLEY | | Plan Coordinator | 1599353 |
Construction | Original | D | 11/29/2021 | SHELLEY | SHELLEY | RBD cannot analyze double I-joists at point loads for structural capacity. Stamp required. Single I-joist locations appear to fail for point loads imposed. Stamp required. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1599351 |
Construction | Original | / | 11/29/2021 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Construction | 1599308 |
Construction | Original | / | 11/24/2021 | | RITA | Location = Construction by RITA | | Construction | 1598979 |
Resubmittal 2 | Original | / | 11/23/2021 | RITA | RITA | Resubmittal #2 | | Resubmittal 2 | 1598394 |
Out to Review | Original | / | 11/18/2021 | NELIDA | NELIDA | Jeff 970-903-8448 | | Out to Review | 1596193 |
Finished Bin | Original | / | 11/18/2021 | | SCANNING | Location = Finished Bin by SCANNING | | Finished Bin | 1595984 |
Plan Coordinator | Original | / | 11/18/2021 | | TCRIPPEN | Location = Plan Coordinator by TCRIPPEN | | Plan Coordinator | 1595978 |
Mechanical | Original | D | 11/18/2021 | TCRIPPEN | TCRIPPEN | Missing duct design (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Mechanical | 1595977 |
Mechanical | Original | / | 11/17/2021 | | SCANNING | Location = Mechanical by SCANNING | | Mechanical | 1595801 |
Plan Coordinator | Original | / | 11/17/2021 | | DANM | Location = Plan Coordinator by DANM | | Plan Coordinator | 1595753 |
Construction | Original | D | 11/17/2021 | DANM | DANM | It does not appear that support of the point loads from above have been addressed as requested on the original review.
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1595751 |
Construction | Original | / | 11/17/2021 | DANM | DANM | In Current Review by DANM | | Construction | 1595749 |
Construction | Original | / | 11/15/2021 | | NELIDA | Location = Construction by NELIDA | | Construction | 1593948 |
Resubmittal 1 | Original | / | 11/15/2021 | NELIDA | NELIDA | Resubmittal #1 11/15/2021 | | Resubmittal 1 | 1593947 |
Out to Review | Original | / | 10/20/2021 | VERONIKAP | VERONIKAP | Jeff 970-903-8448 | | Out to Review | 1581777 |
Finished Bin | Original | / | 10/15/2021 | | SCANNING | Location = Finished Bin by SCANNING | | Finished Bin | 1579487 |
Plan Coordinator | Original | / | 10/15/2021 | | TCRIPPEN | Location = Plan Coordinator by TCRIPPEN | | Plan Coordinator | 1579481 |
Mechanical | Original | D | 10/15/2021 | TCRIPPEN | TCRIPPEN | Design professional to stamp equipment certificate, whole house ventilation, and duct design.or provide complete Wright soft or Elite soft programs. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Mechanical | 1579480 |
Mechanical | Original | / | 10/15/2021 | TCRIPPEN | TCRIPPEN | In Current Review by TCRIPPEN | | Mechanical | 1579449 |
Mechanical | Original | / | 10/14/2021 | | SCANNING | Location = Mechanical by SCANNING | | Mechanical | 1579289 |
Plan Coordinator | Original | / | 10/14/2021 | | SHELLEY | Location = Plan Coordinator by SHELLEY | | Plan Coordinator | 1579261 |
Construction | Original | D | 10/14/2021 | SHELLEY | SHELLEY | Verify bedroom windows meet egress height requirements; No structural review on main floor - all point loads from above must have support, specify all supporting elements. Inverted hangers required at deck attachment to cantilever. Deck cannot have cantilevered joists if attached to dwelling, and would not meet 4:1 backspan requirement. Clarify what U26.2 is attached to as flanges cannot be field modified. Back awning requires design professional. Missing header at bathroom windows. Bedroom window headers insufficient. See plans. No walk. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1579260 |
Construction | Original | / | 10/14/2021 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Construction | 1579206 |
Construction | Original | / | 10/11/2021 | | RITA | Location = Construction by RITA | | Construction | 1577091 |
Floodplain | Original | N | 10/11/2021 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 7405345028) | | Floodplain | 1577086 |