Construction | Original | A | 10/22/2021 | SHELLEY | SHELLEY | | | Construction | 1583082 | Resubmittal 2 | Original | / | 10/22/2021 | AUSTINK | AUSTINK | Resubmittal #2 | | Resubmittal 2 | 1582978 | Construction | Original | D | 10/21/2021 | SHELLEY | SHELLEY | Same comment. Provide a design for the drain or ES report for pre-manufactured system. Remove contract from submittal. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1582652 | Resubmittal 1 | Original | / | 10/21/2021 | AUSTINK | AUSTINK | Resubmittal #1 | | Resubmittal 1 | 1582614 | Construction | Original | D | 10/19/2021 | SHELLEY | SHELLEY | Provide design for drain. If a pre-manufactured system, provide cut sheet. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1580839 | Floodplain | Original | N | 10/18/2021 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 7103001011) | | Floodplain | 1580114 |
|
| |
|