Electrical | Original | A | 6/23/2022 | RICHG | RICHG | | | Electrical | 1702996 |
Electronic Plan | Original | / | 6/23/2022 | RICHG | RICHG | In Current Review by RICHG | | Electronic Plan | 1702991 |
Submittal 3 | Original | / | 6/22/2022 | SIERRAC | SIERRAC | Submittal #3 | | Submittal 3 | 1702260 |
Electrical | Original | D | 6/15/2022 | RICHG | RICHG | 1. Provide back up breaker size on one line.
2. One line shows CSI solar panels. Provide completed manufactures specifications in folder. Need panel specifications.See link https://www.pprbd.org/File/Resources/Downloads/ResidentialHandout/Alt%20energy2021.pdf
3. Provide document showing the rack and modules have been evaluated (by an NRTL) together as a system for grounding the modules per 690.43 NEC (Usually found in the rack installation manual). See link
https://www.pprbd.org/File/Resources/Downloads/ResidentialHandout/Alt%20energy2021.pdf
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1698513 |
Electronic Plan | Original | / | 6/15/2022 | RICHG | RICHG | In Current Review by RICHG | | Electronic Plan | 1698502 |
Submittal 2 | Original | / | 6/14/2022 | SIERRAC | SIERRAC | Submittal #2 | | Submittal 2 | 1698212 |
Electrical | Original | D | 6/6/2022 | RICHG | RICHG | 1. Document showing compliance with UL 2703
2. Provide document showing the rack and modules have been evaluated (by an NRTL) together as a system for grounding the modules per 690.43 NEC (Usually found in the rack installation manual).
3. Provide #4 on conductor schedule.
SEE RED LINE ON ONE LINE
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1693474 |
Electronic Plan | Original | / | 6/6/2022 | RICHG | RICHG | In Current Review by RICHG | | Electronic Plan | 1693464 |
CO Springs DRE | Original | N | 6/3/2022 | CHUDSPETH | CHUDSPETH | Flush mount roof solar panels and/or PV solar panels do not exceed maximum residential height requirements (see full review) | | CO Springs DRE | 1692115 |
Zoning/Planning | Original | / | 6/3/2022 | CHUDSPETH | CHUDSPETH | In Current Review by CCORCORAN | | Zoning/Planning | 1692070 |
Construction | Original | A | 6/3/2022 | CGIECK | CGIECK | | | Construction | 1691910 |
Electronic Plan | Original | / | 6/3/2022 | CGIECK | CGIECK | In Current Review by CGIECK | | Electronic Plan | 1691908 |
Floodplain | Original | N | 6/1/2022 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 7412404056) | | Floodplain | 1690721 |