CO Springs DRE | Original | D | 10/6/2023 | KSCHOTT | KSCHOTT | Same comments as before: 1. include an approved GECP for the whole site so SWENT can confirm that no major grade changes have occurred from the approved DP preliminary grade plan; otherwise additional hillside information will be required for each lot. 2. PLDO fees must be paid for each unit prior to permit approval. contact charla.hudspeth@coloradosprings.gov Informational: Please note that because this lot is within the hillside overlay; no land disturbance (including vegetation removal, excavation, grading) can occur until building permit is approved and includes an approved hillside site plan. Hillside inspections will occur throughout the permitting and construction process to ensure compliance with the hillside site plan | | CO Springs DRE | 1910227 |
Stormwater | Original | D | 10/4/2023 | EWANG | EWANG | Previous comments were not addressed: -Show soils stockpile within limits of disturbance. -Show stormwater flow arrows. -PE sign and stamp. | | Stormwater | 1908674 |
Mechanical | Original | A | 10/3/2023 | JUSTINC | JUSTINC | | | Mechanical | 1907778 |
Zoning/Planning | Original | / | 10/3/2023 | KSCHOTT | KSCHOTT | In Current Review by KSCHOTT | | Zoning/Planning | 1907717 |
Enumeration | Original | A | 10/3/2023 | BECKYA | BECKYA | | | Enumeration | 1907707 |
Submittal 5 | Original | / | 10/3/2023 | BRIANNAM | BRIANNAM | Submittal #5 | | Submittal 5 | 1907630 |
Electrical | Original | A | 7/25/2023 | SHELBY | SHELBY | | | Electrical | 1875364 |
CO Springs DRE | Original | D | 7/10/2023 | KSCHOTT | KSCHOTT | 1. PLDO fees are due for EACH UNIT prior to permit approval. Please contact charla.hudspeth@coloradosprings.gov to pay 2. include approved GECP with each permit submittal to aid with SWENT's permit review. kerri.schott@coloradosprings.gov | | CO Springs DRE | 1867626 |
Stormwater | Original | D | 7/6/2023 | EWANG | EWANG | Previous comments were not addressed. Hillside site plan needs to include: -Show soils stockpile within limits of disturbance. -Show existing and proposed contours on legend. -Show stormwater flow arrows. | | Stormwater | 1866658 |
Zoning/Planning | Original | / | 7/3/2023 | KSCHOTT | KSCHOTT | In Current Review by KSCHOTT | | Zoning/Planning | 1865768 |
Enumeration | Original | A | 7/3/2023 | BECKYA | BECKYA | | | Enumeration | 1865718 |
Submittal 4 | Original | / | 7/1/2023 | BPHILLIPS | BPHILLIPS | Submittal #4 | | Submittal 4 | 1865659 |
Electrical | Original | D | 12/30/2022 | SHELBY | SHELBY | Please show location of disconnects. Disconnects must be grouped. PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Electrical | 1786402 |
Electronic Plan | Original | / | 12/30/2022 | SHELBY | SHELBY | In Current Review by SHELBY | | Electronic Plan | 1786397 |
CO Springs DRE | Original | D | 12/22/2022 | KSCHOTT | KSCHOTT | include the APPROVED development plan with resubmittal (with Planner stamp approval) coordinate with SWENT on specific site plan requirements; each lot should should EG/FG contours/values at corners with LOD PLDO fees are due for EACH new unit prior to permit approval. contact charla.hudspeth@coloradosprings.gov to pay
Informational: Please note that because this lot is within the hillside overlay; no land disturbance (including vegetation removal, excavation, grading) can occur until building permit is approved and includes an approved hillside site plan. Hillside inspections will occur throughout the permitting and construction process to ensure compliance with the hillside site plan | | CO Springs DRE | 1784851 |
Stormwater | Original | D | 12/16/2022 | JMOXNESS | JMOXNESS | Provide site specific site plan. See previous review comments. | | Stormwater | 1782932 |
Zoning/Planning | Original | / | 12/16/2022 | KSCHOTT | KSCHOTT | In Current Review by KSCHOTT | | Zoning/Planning | 1782806 |
Construction | Original | A | 12/16/2022 | JUSTINL | JUSTINL | | | Construction | 1782796 |
Electronic Plan | Original | / | 12/16/2022 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 1782792 |
Enumeration | Original | A | 12/15/2022 | BECKYA | BECKYA | | | Enumeration | 1782512 |
Submittal 3 | Original | / | 12/15/2022 | KALLISTAJ | KALLISTAJ | Submittal #3 | | Submittal 3 | 1782471 |
CO Springs DRE | Original | D | 12/2/2022 | KSCHOTT | KSCHOTT | per applicant's request, this permit is denied without review. Will review by zoning once resubmitted.
In general, for resubmittal include approved DP that includes an approved hillside plan or provide lot specific hillside site plans at time of building permit for review
Informational: no land disturbance (including vegetation removal, excavation, grading) can occur until building permit is approved and includes an approved hillside site plan. Hillside inspections will occur throughout the permitting and construction process to ensure compliance with the hillside site plan | | CO Springs DRE | 1777496 |
Stormwater | Original | D | 12/2/2022 | JMOXNESS | JMOXNESS | There will need to be an approved GEC Plan prior to approval. Upload the approved GEC Plan
Provide site plan specific for lots being submitted. Site plan needs to include: - Show limits of soil disturbance on plan. - Show soils stockpile within limits of disturbance. - Show existing and proposed contours and add to legend. - Show stormwater flow arrows. | | Stormwater | 1777331 |
Zoning/Planning | Original | / | 12/1/2022 | KSCHOTT | KSCHOTT | In Current Review by KSCHOTT | | Zoning/Planning | 1777113 |
Electrical | Original | D | 12/1/2022 | SHELBY | SHELBY | Please address previous review comments. PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Electrical | 1777087 |
Construction | Original | D | 12/1/2022 | JUSTINL | JUSTINL | Rated wall assembly continuity needs to be maintained per IRC 302.3 - detail appears to continue through attic space to under side of roof sheathing - Provide detail intended to be used at membrane penetration of truss cord into rated assembly or indicate if Exception 2 of this code section will be used. Exception appears to be implied per section key notes #10 PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Construction | 1776958 |
Electronic Plan | Original | / | 11/30/2022 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 1776678 |
Enumeration | Original | A | 11/29/2022 | BECKYA | BECKYA | | | Enumeration | 1776154 |
Submittal 2 | Original | / | 11/29/2022 | BPHILLIPS | BPHILLIPS | Submittal #2 | | Submittal 2 | 1775993 |
Stormwater | Original | D | 10/6/2022 | JMOXNESS | JMOXNESS | There will need to be an approved GEC Plan prior to approval.
Provide site plan specific for lots being submitted. | | Stormwater | 1751962 |
Plumbing | Original | A | 10/6/2022 | SHANEN | SHANEN | Living areas not reviewed. Must comply with current adopted codes. Note: Master water meter and sewer/water service to each unit shown on preliminary utility and public facilities plan sheets 10 and 11 of 22. | | Plumbing | 1751753 |
Electrical | Original | D | 10/5/2022 | SHELBY | SHELBY | 1. Please show location and type disconnect(s) serving this structure. Disconnects must be grouped. 2. Show location of electrical panels. Panels may not be in rated wall. Seven plans in this series 167936, 167937, 167941, 167942, 167943, 167944, 167945 | | Electrical | 1751682 |
Mechanical | Original | A | 10/4/2022 | JUSTINC | JUSTINC | | | Mechanical | 1750764 |
Electronic Plan | Original | / | 10/4/2022 | JUSTINC | JUSTINC | In Current Review by JUSTINC | | Electronic Plan | 1750611 |
CO Springs DRE | Original | D | 10/4/2022 | KSCHOTT | KSCHOTT | 1. Include the STAMP APPROVED development plan with file number when resubmit (hillside plan of DP-page 18- should have hillside certification statement signed) 2. PLDO fees are due prior to permit approval for EACH new unit. Contact charla.corocan@coloradosprings.gov for amount and how to pay. | | CO Springs DRE | 1750274 |
Zoning/Planning | Original | / | 10/3/2022 | KSCHOTT | KSCHOTT | In Current Review by KSCHOTT | | Zoning/Planning | 1749501 |
Construction | Original | D | 9/30/2022 | CHRISTAW | CHRISTAW | Abridged notes. See plans for clarification:
1.0 Clarify UL listed separation PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Construction | 1749376 |
Electronic Plan | Original | / | 9/29/2022 | CHRISTAW | CHRISTAW | In Current Review by CHRISTAW | | Electronic Plan | 1748711 |
Enumeration | Original | A | 9/29/2022 | BECKYA | BECKYA | On the site plan (the addressing plan and secondary addressing plan), Enumerations clouded the buildings which are part of this scope. If these plans are resubmitted, please be sure to cloud the homes before resubmitting the plans. | | Enumeration | 1748177 |
Electronic Plan | Original | / | 9/29/2022 | BECKYA | BECKYA | In Current Review by BECKYA | | Electronic Plan | 1748061 |
Floodplain | Original | N | 9/28/2022 | KEITH | KEITH | | | Floodplain | 1747883 |
Stormwater | Original | / | 9/27/2022 | SYSTEM | SYSTEM | Parcel 6307405007 is within the Hillside Overlay (HS). Stormwater Review is required. | | Stormwater | 1747089 |
Floodplain | Original | / | 9/27/2022 | RBD GIS | RBD GIS | Autogenerated Review: Parcel intersects with 100 Year Floodplain. (Parcel: 6307405007) | | Floodplain | 1747090 |