CO Springs DRE | Original | D | 10/6/2023 | KSCHOTT | KSCHOTT | Same comments as before: 1. include an approved GECP for the whole site so SWENT can confirm that no major grade changes have occurred from the approved DP preliminary grade plan; otherwise additional hillside information will be required for each lot. 2. PLDO fees must be paid for each unit prior to permit approval. contact charla.hudspeth@coloradosprings.gov Informational: Please note that because this lot is within the hillside overlay; no land disturbance (including vegetation removal, excavation, grading) can occur until building permit is approved and includes an approved hillside site plan. Hillside inspections will occur throughout the permitting and construction process to ensure compliance with the hillside site plan | | CO Springs DRE | 1910228 |
Stormwater | Original | D | 10/4/2023 | EWANG | EWANG | Previous comments were not addressed on Hillside site plan: -Show soils stockpile within limits of disturbance. -Show stormwater flow arrows. -PE sign and stamp. | | Stormwater | 1908684 |
Mechanical | Original | A | 10/3/2023 | JUSTINC | JUSTINC | | | Mechanical | 1907792 |
Zoning/Planning | Original | / | 10/3/2023 | KSCHOTT | KSCHOTT | In Current Review by KSCHOTT | | Zoning/Planning | 1907715 |
Submittal 4 | Original | / | 10/3/2023 | BRIANNAM | BRIANNAM | Submittal #4 | | Submittal 4 | 1907623 |
Electrical | Original | A | 7/25/2023 | SHELBY | SHELBY | | | Electrical | 1875363 |
CO Springs DRE | Original | D | 7/10/2023 | KSCHOTT | KSCHOTT | 1. PLDO fees are due for EACH UNIT prior to permit approval. Please contact charla.hudspeth@coloradosprings.gov to pay 2. include approved GECP with each permit submittal to aid with SWENT's permit review. kerri.schott@coloradosprings.gov | | CO Springs DRE | 1867628 |
Stormwater | Original | D | 7/6/2023 | EWANG | EWANG | Previous comments were not addressed. Hillside site plan needs to include: -Show soils stockpile within limits of disturbance. -Show existing and proposed contours on legend. -Show stormwater flow arrows. | | Stormwater | 1866661 |
Zoning/Planning | Original | / | 7/5/2023 | KSCHOTT | KSCHOTT | In Current Review by KSCHOTT | | Zoning/Planning | 1866257 |
Construction | Original | A | 7/5/2023 | JUSTINL | JUSTINL | No changes made to construction from previously approved plans. | | Construction | 1866232 |
Electronic Plan | Original | / | 7/5/2023 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 1866138 |
Enumeration | Original | A | 7/3/2023 | BECKYA | BECKYA | | | Enumeration | 1865720 |
Submittal 3 | Original | / | 7/1/2023 | BPHILLIPS | BPHILLIPS | Submittal #3 | | Submittal 3 | 1865658 |
CO Springs DRE | Original | D | 12/22/2022 | KSCHOTT | KSCHOTT | include the APPROVED development plan with resubmittal (with Planner stamp approval) coordinate with SWENT on specific site plan requirements; each lot should should EG/FG contours/values at corners of duplex with LOD noted on site PLDO fees are due for EACH new unit prior to permit approval. contact charla.hudspeth@coloradosprings.gov to pay
Informational: Please note that because this lot is within the hillside overlay; no land disturbance (including vegetation removal, excavation, grading) can occur until building permit is approved and includes an approved hillside site plan. Hillside inspections will occur throughout the permitting and construction process to ensure compliance with the hillside site plan | | CO Springs DRE | 1784849 |
Electrical | Original | D | 12/7/2022 | SHELBY | SHELBY | Previous review comments have not been addressed. PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Electrical | 1779561 |
Electronic Plan | Original | / | 12/7/2022 | SHELBY | SHELBY | In Current Review by SHELBY | | Electronic Plan | 1779554 |
Stormwater | Original | D | 12/7/2022 | JMOXNESS | JMOXNESS | There will need to be an approved Final Phase GEC Plan prior to approval. Please upload.
Provide site plan specific for lots being submitted. Please include:
- Show limits of soil disturbance on plan. - Show soils stockpile within limits of disturbance. - Show existing and proposed contours and add to legend. - Show stormwater flow arrows. | | Stormwater | 1779511 |
Plumbing | Original | A | 12/6/2022 | SHANEN | SHANEN | Living areas not reviewed. Must comply with current adopted codes. Note: Master water meter and sewer/water service to each unit shown on preliminary utility and public facilities plan sheets 10 and 11 of 22. | | Plumbing | 1778892 |
Mechanical | Original | A | 12/6/2022 | JUSTINC | JUSTINC | | | Mechanical | 1778715 |
Electronic Plan | Original | / | 12/6/2022 | JUSTINC | JUSTINC | In Current Review by JUSTINC | | Electronic Plan | 1778598 |
Zoning/Planning | Original | / | 12/6/2022 | KSCHOTT | KSCHOTT | In Current Review by KSCHOTT | | Zoning/Planning | 1778594 |
Construction | Original | A | 12/6/2022 | JUSTINL | JUSTINL | | | Construction | 1778569 |
Electronic Plan | Original | / | 12/6/2022 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 1778534 |
Enumeration | Original | D | 12/5/2022 | BECKYA | BECKYA | Please update the incorrect addresses on page A0.1 see Enumeration comments on this page. PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Enumeration | 1778441 |
Electronic Plan | Original | / | 12/5/2022 | BECKYA | BECKYA | In Current Review by BECKYA | | Electronic Plan | 1778048 |
Submittal 2 | Original | / | 12/5/2022 | ANDREAL | ANDREAL | Submittal #2 | | Submittal 2 | 1777885 |
Stormwater | Original | D | 10/6/2022 | JMOXNESS | JMOXNESS | There will need to be an approved GEC Plan prior to approval.
Provide site plan specific for lots being submitted. | | Stormwater | 1751956 |
Plumbing | Original | A | 10/6/2022 | SHANEN | SHANEN | Living areas not reviewed. Must comply with current adopted codes. Note: Master water meter and sewer/water service to each unit shown on preliminary utility and public facilities plan sheets 10 and 11 of 22. | | Plumbing | 1751750 |
Electrical | Original | D | 10/5/2022 | SHELBY | SHELBY | 1. Please show location and type disconnect(s) serving this structure. Disconnects must be grouped. 2. Show location of electrical panels. Panels may not be in rated wall. Seven plans in this series 167936, 167937, 167941, 167942, 167943, 167944, 167945 | | Electrical | 1751683 |
Mechanical | Original | A | 10/4/2022 | JUSTINC | JUSTINC | | | Mechanical | 1750822 |
Electronic Plan | Original | / | 10/4/2022 | JUSTINC | JUSTINC | In Current Review by JUSTINC | | Electronic Plan | 1750612 |
CO Springs DRE | Original | D | 10/4/2022 | KSCHOTT | KSCHOTT | 1. Include the STAMP APPROVED development plan with file number when resubmit (hillside plan of DP-page 18- should have hillside certification statement signed) 2. PLDO fees are due prior to permit approval for EACH new unit. Contact charla.corocan@coloradosprings.gov for amount and how to pay. | | CO Springs DRE | 1750275 |
Zoning/Planning | Original | / | 10/3/2022 | KSCHOTT | KSCHOTT | In Current Review by KSCHOTT | | Zoning/Planning | 1749500 |
Construction | Original | D | 9/30/2022 | CHRISTAW | CHRISTAW | Abridged notes. See plans for clarification:
1.0 Update stair detail 4.0 Clarify accessibility notes 5.0 Clarify UL listed separation and notes PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Construction | 1749374 |
Electronic Plan | Original | / | 9/29/2022 | CHRISTAW | CHRISTAW | In Current Review by CHRISTAW | | Electronic Plan | 1748712 |
Enumeration | Original | D | 9/29/2022 | BECKYA | BECKYA | On the site plan (the addressing plan and secondary addressing plan), highlight/cloud which buildings are part of this scope. On the addressing plan it appears there are other buildings which might be included in this building type, please clarify on the key map on the first page of the architectural plans.
PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Enumeration | 1748305 |
Electronic Plan | Original | / | 9/29/2022 | BECKYA | BECKYA | In Current Review by BECKYA | | Electronic Plan | 1748062 |
Floodplain | Original | N | 9/28/2022 | KEITH | KEITH | | | Floodplain | 1747878 |
Stormwater | Original | / | 9/27/2022 | SYSTEM | SYSTEM | Parcel 6307405007 is within the Hillside Overlay (HS). Stormwater Review is required. | | Stormwater | 1747094 |
Floodplain | Original | / | 9/27/2022 | RBD GIS | RBD GIS | Autogenerated Review: Parcel intersects with 100 Year Floodplain. (Parcel: 6307405007) | | Floodplain | 1747095 |