Electrical | Original | A | 3/24/2023 | RICHG | RICHG | | | Electrical | 1820375 |
Electronic Plan | Original | / | 3/24/2023 | RICHG | RICHG | In Current Review by RICHG | | Electronic Plan | 1820364 |
County Zoning | Original | A | 3/23/2023 | DSDYOUNGER | DSDYOUNGER | Addition Approved (see full review) | | County Zoning | 1820042 |
Submittal 5 | Original | / | 3/23/2023 | SIERRAC | SIERRAC | Submittal #5 | | Submittal 5 | 1820021 |
Electrical | Original | D | 3/22/2023 | RICHG | RICHG | PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Electrical | 1819456 |
Electronic Plan | Original | / | 3/22/2023 | RICHG | RICHG | In Current Review by RICHG | | Electronic Plan | 1819449 |
County Zoning | Original | D | 3/20/2023 | DSDYOUNGER | DSDYOUNGER | Use provided site plan uploaded as an "other" document. Add solar array (with total square footage) along with distances to property lines. | | County Zoning | 1818546 |
Submittal 4 | Original | / | 3/20/2023 | SIERRAC | SIERRAC | Submittal #4 | | Submittal 4 | 1818283 |
Electrical | Original | A | 3/20/2023 | RICHG | RICHG | | | Electrical | 1818080 |
Electronic Plan | Original | / | 3/20/2023 | RICHG | RICHG | In Current Review by RICHG | | Electronic Plan | 1818065 |
County Zoning | Original | D | 3/16/2023 | DSDYOUNGER | DSDYOUNGER | The home must also be shown on the site plan. | | County Zoning | 1817222 |
Construction | Original | N | 3/16/2023 | JUSTINL | JUSTINL | System height to be 6'11" max in height | | Construction | 1817049 |
Electronic Plan | Original | / | 3/16/2023 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 1816986 |
Submittal 3 | Original | / | 3/16/2023 | SIERRAC | SIERRAC | Submittal #3 | | Submittal 3 | 1816874 |
Electrical | Original | A | 3/15/2023 | RICHG | RICHG | | | Electrical | 1816276 |
Electronic Plan | Original | / | 3/15/2023 | RICHG | RICHG | In Current Review by RICHG | | Electronic Plan | 1816245 |
County Zoning | Original | D | 3/15/2023 | DSDYOUNGER | DSDYOUNGER | See disapproval comments from 3/13/23 | | County Zoning | 1816162 |
Construction | Original | D | 3/14/2023 | JUSTINL | JUSTINL | Provide total maximum height of the system from grade to top of panel. If height is to exceed 7', then will need to provide engineered system to include framing requirements and foundation design for pier depth and diameter and bearing capacity. PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Construction | 1815835 |
Electronic Plan | Original | / | 3/14/2023 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 1815812 |
Submittal 2 | Original | / | 3/14/2023 | SIERRAC | SIERRAC | Submittal #2 | | Submittal 2 | 1815478 |
County Zoning | Original | D | 3/13/2023 | DSDYOUNGER | DSDYOUNGER | Site plan must depict entire lot with all existing structures shown, total square footage and dimensional setbacks to closest lot lines. Driveway access must also be shown as well. Provide total square footage of solar array on site plan. | | County Zoning | 1815249 |
Zoning/Planning | Original | / | 3/13/2023 | DSDYOUNGER | DSDYOUNGER | In Current Review by DSDYOUNGER | | Zoning/Planning | 1815102 |
Electrical | Original | D | 3/13/2023 | RICHG | RICHG | Show all gear on site plan to match one line. Show location.
PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Electrical | 1815099 |
Electronic Plan | Original | / | 3/13/2023 | RICHG | RICHG | In Current Review by RICHG | | Electronic Plan | 1815091 |
Construction | Original | D | 3/13/2023 | JUSTINL | JUSTINL | Provide manufacture installation details for roof top solar panels to be installed as ground mount. This is to include framing and pier depth-diameter-spacing-and placement of Piers ( or foundational elements ) PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Construction | 1815071 |
Electronic Plan | Original | / | 3/13/2023 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 1815061 |
Zoning | Original | / | 3/3/2023 | SYSTEM | SYSTEM | El Paso County requires a zoning review for PV solar ground mounts under 7 feet. | | Zoning | 1809832 |
Floodplain | Original | N | 3/3/2023 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 5336101001) | | Floodplain | 1809831 |