CO Springs DRE | Original | D | 8/28/2023 | KSCHOTT | KSCHOTT | same comments as before 1. LOD inspection required prior to permit approval. contact patrick.dosch@coloradosprings.gov 2. PLDO fees due prior to permit approval. contact charla.hudspeth@coloradosprings.gov Informational: Please note that because this lot is within the hillside overlay; no land disturbance (including vegetation removal, excavation, grading) can occur until building permit is approved and includes an approved hillside site plan. Hillside inspections will occur throughout the permitting and construction process to ensure compliance with the hillside site plan (see full review) | | CO Springs DRE | 1891131 |
Mechanical | Original | A | 8/21/2023 | DALEH | DALEH | | | Mechanical | 1887431 |
Stormwater | Original | A | 8/18/2023 | EWANG | EWANG | | | Stormwater | 1886811 |
Zoning/Planning | Original | / | 8/18/2023 | KSCHOTT | KSCHOTT | In Current Review by KSCHOTT | | Zoning/Planning | 1886792 |
Submittal 4 | Original | / | 8/18/2023 | BECKYA | BECKYA | Submittal #4 | | Submittal 4 | 1886726 |
CO Springs DRE | Original | D | 7/26/2023 | KSCHOTT | KSCHOTT | 1. PLDO fees to be paid prior to permit approval. contact charla.hudspeth@coloradosprings.gov to pay 2. LOD (limit of disturbance boundary) inspection required prior to permit approval. contact patrick.dosch@coloradosprings.gov when LOD is in place on site. Informational: Please note that because this lot is within the hillside overlay; no land disturbance (including vegetation removal, excavation, grading) can occur until building permit is approved and includes an approved hillside site plan. Hillside inspections will occur throughout the permitting and construction process to ensure compliance with the hillside site plan (see full review) | | CO Springs DRE | 1875944 |
Stormwater | Original | A | 7/25/2023 | EWANG | EWANG | | | Stormwater | 1875090 |
Mechanical | Original | D | 7/24/2023 | JUSTINC | JUSTINC | Heat calculation still shows R-3 at slab. This is the same comment as the last review 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Mechanical | 1874611 |
Zoning/Planning | Original | / | 7/24/2023 | KSCHOTT | KSCHOTT | In Current Review by KSCHOTT | | Zoning/Planning | 1874184 |
Submittal 3 | Original | / | 7/23/2023 | SHELLEY | SHELLEY | Submittal #3 | | Submittal 3 | 1873968 |
CO Springs Fire | Original | A | 7/6/2023 | CSFIRE | CSFIRE | You are responsible for reviewing the APPROVAL comments found on the CSFD website as they contain important inspection information: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp
PLEASE ALLOW UP TO AN HOUR FOR COMMENTS TO LOAD TO THE SERVERS – NOTE COMMENTS ARE AVAILABLE FOR 30 DAYS! ALL PLAN APPROVALS SUBJECT TO FINAL INSPECTION! (see full review) | jt09ff | CO Springs Fire | 1866599 |
CO Springs DRE | Original | D | 6/27/2023 | KSCHOTT | KSCHOTT | 1. Label front yard setback as 18' FYSB 2. Show distance from structure to front property line 3. Geohazard report with slope stability analysis is required to be reviewed by City Engineering, separate from building permit review. Please contact patrick.morris@coloradosprings.gov or joel.dagnillo@coloradosprings.gov for geo haz requirements and submittal information. An approved geo haz is required for permit approval 4. LOD inspection required prior to permit approval, contact patrick.dosch@coloradosprings.gov 5. PLDO fees due prior to permit approval, contact charla.hudspeth@coloradosprings.gov Informational: Please note that because this lot is within the hillside overlay; no land disturbance (including vegetation removal, excavation, grading) can occur until building permit is approved and includes an approved hillside site plan. Hillside inspections will occur throughout the permitting and construction process to ensure compliance with the hillside site plan (see full review) | | CO Springs DRE | 1863334 |
Stormwater | Original | A | 6/23/2023 | EWANG | EWANG | | | Stormwater | 1861327 |
Zoning/Planning | Original | / | 6/22/2023 | KSCHOTT | KSCHOTT | In Current Review by KSCHOTT | | Zoning/Planning | 1860735 |
Mechanical | Original | D | 6/22/2023 | JUSTINC | JUSTINC | This needs to be R-10 for the slab only showing R-3
1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Mechanical | 1860645 |
Construction | Original | A | 6/21/2023 | SHELLEY | SHELLEY | | | Construction | 1860627 |
Enumeration | Original | A | 6/21/2023 | BECKYA | BECKYA | | | Enumeration | 1860364 |
Submittal 2 | Original | / | 6/21/2023 | SHELLEY | SHELLEY | Submittal #2 | | Submittal 2 | 1860347 |
CO Springs Fire | Original | D | 6/7/2023 | CSFIRE | CSFIRE | WALK OK – See our “Virtual” Walk Through process here: https://coloradosprings.gov/fire-department/page/plan-and-construction-review-status We regret to inform you, this plan is disapproved. You are responsible for reviewing the DISAPPROVAL comments found on the CSFD website and responding to them in your resubmittal: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp PLEASE ALLOW UP TO AN HOUR FOR COMMENTS TO LOAD TO THE SERVERS – COMMENTS ARE AVAILABLE FOR ONLY 30 DAYS! | dwithee | CO Springs Fire | 1853016 |
CO Springs DRE | Original | D | 5/31/2023 | KSCHOTT | KSCHOTT | 1. Please label front setback as "18' front yard setback" 2. sign/date hillside certification statement 3. A lot specific geologic hazard report is required with slope stability analysis. Has this been submitted for separate City Engineering review? An approved report is required prior to permit submittal. contact patrick.morris@coloradosprings.gov or joel.dagnillo@coloradosprings.gov 4. LOD inspection required prior to permit approval. contact patrick.dosch@coloradosprings.gov 5. PLDO fees to be paid prior to permit approval. contact charla.hudspeth@coloradosprings.gov *fire sprinkler system is required per the DP for this lot (elevations ready for approval as per DP , 30' max height from finished grade) questions regarding these comments contact kerri.schott@coloradosprings.gov Informational: Please note that because this lot is within the hillside overlay; no land disturbance (including vegetation removal, excavation, grading) can occur until building permit is approved and includes an approved hillside site plan. Hillside inspections will occur throughout the permitting and construction process to ensure compliance with the hillside site plan (see full review) | | CO Springs DRE | 1849336 |
Mechanical | Original | D | 5/26/2023 | JUSTINC | JUSTINC | Missing losses for slab on grade
PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Mechanical | 1848508 |
Stormwater | Original | D | 5/26/2023 | EWANG | EWANG | Include the following on site plan (Sheet A101): -Show and label Limits of Disturbance (LOD). -Include a legend with contours, flow arrows, etc. -Show and label stormwater flow arrows. -PE sign and stamp. | | Stormwater | 1848494 |
Electrical | Original | N | 5/26/2023 | DANIELG | DANIELG | | | Electrical | 1848480 |
Zoning/Planning | Original | / | 5/26/2023 | KSCHOTT | KSCHOTT | In Current Review by KSCHOTT | | Zoning/Planning | 1848447 |
Construction | Original | D | 5/26/2023 | SHELLEY | SHELLEY | See progress/review set. PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Construction | 1848421 |
Plumbing | Original | N | 5/26/2023 | SHANEN | SHANEN | | | Plumbing | 1848237 |
Electronic Plan | Original | / | 5/26/2023 | ANDREAL | ANDREAL | In Current Review by ANDREAL | | Electronic Plan | 1848236 |
Enumeration | Original | A | 5/19/2023 | BECKYA | BECKYA | See plans for Enumeration notes. | | Enumeration | 1845463 |
Fire | Original | / | 5/17/2023 | RBD GIS | RBD GIS | Parcel 7412114032 is within the Wildland Urban Interface (WUI). Fire Department Review is required. | | Fire | 1844558 |
Stormwater | Original | / | 5/17/2023 | SYSTEM | SYSTEM | Parcel 7412114032 is within the Hillside Overlay (HS). Stormwater Review is required. | | Stormwater | 1844559 |
Floodplain | Original | N | 5/17/2023 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 7412114032) | | Floodplain | 1844560 |