Manitou Zoning | Original | D | 9/22/2023 | MSZONING | MSZONING | Side setbacks and front setbacks have not been provided as needed. This is noted on the site plan mark ups. | eringsred | Manitou Zoning | 1903288 |
Submittal 3 | Original | / | 9/11/2023 | BRIANNAM | BRIANNAM | Submittal #3 | | Submittal 3 | 1897648 |
Manitou Zoning | Original | D | 8/29/2023 | MSZONING | MSZONING | Required Setback information has not been provided. The applicant must resubmit. Comments noted on the plans. | eringsred | Manitou Zoning | 1892688 |
Construction | Original | A | 8/21/2023 | SHELLEY | SHELLEY | AS NOTED - please review approved plan prior to construction. | | Construction | 1887432 |
Submittal 2 | Original | / | 8/19/2023 | BECKYA | BECKYA | Submittal #2 | | Submittal 2 | 1887082 |
Manitou Zoning | Original | D | 7/26/2023 | MSZONING | MSZONING | The dimensions of the deck are not clearly legible. Please revise plans with clear dimensions for the deck extents and with the setbacks from the property line to the deck clearly drawn. | eringsred | Manitou Zoning | 1875755 |
Manitou Fire | Original | A | 7/19/2023 | MSFIRE | MSFIRE | Ok per B Dorris on 7/19/23 | bdorris | Manitou Fire | 1872190 |
Construction | Original | D | 7/16/2023 | SHELLEY | SHELLEY | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 1870747 |
Floodplain | Original | A | 6/28/2023 | KEITH | KEITH | deck addition in flood shadow of structure | | Floodplain | 1863669 |
Floodplain | Original | / | 6/28/2023 | RBD GIS | RBD GIS | Autogenerated Review: Parcel intersects with 100 Year Floodplain. (Parcel: 7404410049) | | Floodplain | 1863651 |