Electrical | Original | D | 9/20/2023 | RICHG | RICHG | Remove parallel neutral in service conductors. See one line. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 1902087 |
Electronic Plan | Original | / | 9/20/2023 | RICHG | RICHG | In Current Review by RICHG | | Electronic Plan | 1901993 |
Construction | Original | D | 9/18/2023 | BPHILLIPS | BPHILLIPS | Revise code references back to 2015, as that is the code under which this was submitted originally. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 1900581 |
Electronic Plan | Original | / | 9/18/2023 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 1900573 |
Submittal 2 | Original | / | 9/16/2023 | QUINTONW | QUINTONW | Submittal #2 | | Submittal 2 | 1900522 |
Electrical | Original | D | 7/28/2023 | RICHG | RICHG | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 1877136 |
Electronic Plan | Original | / | 7/28/2023 | RICHG | RICHG | In Current Review by RICHG | | Electronic Plan | 1877135 |
Construction | Original | D | 7/27/2023 | BPHILLIPS | BPHILLIPS | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 1876279 |
Electronic Plan | Original | / | 7/26/2023 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 1875395 |
Zoning | Original | N | 7/19/2023 | SYSTEM | SYSTEM | Zoning review is not required for roof-mounted PV solar projects in Colorado Springs. Flush roof-mounted solar panels and/or PV angled roof-mounted panels not to exceed residential zoning height requirements. The City of Colorado Springs does not review covenants or requirements of homeowners' associations. Property owners are responsible for reviewing and complying with any covenants or other private requirements that may apply to their property. | | Zoning | 1872313 |
Floodplain | Original | N | 7/19/2023 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6307210013) | | Floodplain | 1872312 |