CO Springs DRE | Original | D | 12/28/2023 | MOBRIEN | MOBRIEN | Proposed structure must meet 5 ft side yard setback. Please request a pre-application meeting to discuss options: coloradosprings.gov/preapp (see full review) | | CO Springs DRE | 1945275 |
Zoning/Planning | Original | / | 12/28/2023 | MOBRIEN | MOBRIEN | In Current Review by MOBRIEN | | Zoning/Planning | 1945268 |
Construction | Original | A | 12/27/2023 | CHRISTINEH | CHRISTINEH | | | Construction | 1944347 |
Submittal 2 | Original | / | 12/26/2023 | QUINTONW | QUINTONW | Submittal #2 | | Submittal 2 | 1944026 |
CO Springs DRE | Original | D | 10/26/2023 | APAQUETTE | APAQUETTE | Structure must meet 5' side yard setback. Show dimensions of structure and any other attached structures, along with distance from property lines on the site plan. The site plan must include a bar scale. (see full review) | | CO Springs DRE | 1919580 |
Construction | Original | D | 10/26/2023 | CHRISTINEH | CHRISTINEH | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 1919109 |
Electronic Plan | Original | / | 10/26/2023 | CHRISTINEH | CHRISTINEH | In Current Review by CHRISTINEH | | Electronic Plan | 1919086 |
Energy | Original | N | 10/12/2023 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 1912911 |
Floodplain | Original | N | 10/12/2023 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6324404006) | | Floodplain | 1912910 |