Out to Review | Original | / | 2/5/2024 | NELIDA | NELIDA | Jens picked up. | | Out to Review | 1959673 |
To Be Scanned Bin (Main) | Original | / | 1/19/2024 | | RITA | Location = To Be Scanned Bin (Main) by RITA | | To Be Scanned Bin (Main) | 1953253 |
WP Fire (CSFD Commercial) | Original | N | 1/16/2024 | DBURGESS | DBURGESS | N/A per Fire Chief Tyler Lambert via email to D. Burgess on 11/16/2023: "No issues with FD for the driveway as submitted." | | WP Fire (CSFD Commercial) | 1951312 |
WP Zoning | Original | A | 1/16/2024 | DBURGESS | DBURGESS | ZDP approved on 1/09/2024 & Development Fees paid 1/16/2024. | | WP Zoning | 1951310 |
WP Floodplain | Original | N | 1/16/2024 | DBURGESS | DBURGESS | Verified not in a floodplain | | WP Floodplain | 1951307 |
Out to Review | Original | / | 1/16/2024 | | DBURGESS | Location = Out to Review by DBURGESS | | Out to Review | 1951306 |
WP Enumeration | Original | A | 1/16/2024 | DBURGESS | DBURGESS | Address, owner, parcel number & Tax number verified. | | WP Enumeration | 1951305 |
Woodland Park Bin | Original | / | 12/20/2023 | | SCANNING | Location = Woodland Park Bin by SCANNING | | Woodland Park Bin | 1943123 |
Plan Coordinator (Main) | Original | / | 12/20/2023 | | JUSTINL | Location = Plan Coordinator (Main) by JUSTINL | | Plan Coordinator (Main) | 1943052 |
Energy | Original | A | 12/20/2023 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1943051 |
Construction | Original | A | 12/20/2023 | JUSTINL | JUSTINL | | | Construction | 1943050 |
Construction (Main) | Original | / | 12/20/2023 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Construction (Main) | 1942937 |
Construction (Main) | Original | / | 12/18/2023 | | NELIDA | Location = Construction (Main) by NELIDA | | Construction (Main) | 1942024 |
Submittal 3 | Original | / | 12/18/2023 | NELIDA | NELIDA | Submittal #3: 12/18/2023 | | Submittal 3 | 1942021 |
Plumbing | Original | A | 12/18/2023 | TCRIPPEN | TCRIPPEN | Approved | | Plumbing | 1942016 |
Electrical | Original | A | 12/14/2023 | DANIELG | DANIELG | | | Electrical | 1940761 |
Out to Review | Original | / | 12/14/2023 | BRITNEY | BRITNEY | Jens walking | | Out to Review | 1940755 |
Submittal 2 | Original | / | 12/14/2023 | BRITNEY | BRITNEY | Submittal #2: Jens walking electrical and plumbing | | Submittal 2 | 1940750 |
Woodland Park Bin | Original | / | 11/14/2023 | | SCANNING | Location = Woodland Park Bin by SCANNING | | Woodland Park Bin | 1928411 |
Energy | Original | D | 11/14/2023 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1928395 |
Plumbing | Original | D | 11/14/2023 | TCRIPPEN | TCRIPPEN | See example on front page 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Plumbing | 1928394 |
Mechanical | Original | A | 11/14/2023 | TCRIPPEN | TCRIPPEN | Approved | | Mechanical | 1928393 |
Mechanical (Main) | Original | / | 11/9/2023 | | SCANNING | Location = Mechanical (Main) by SCANNING | | Mechanical (Main) | 1926008 |
Plan Coordinator (Main) | Original | / | 11/9/2023 | | BERTHA | Location = Plan Coordinator (Main) by BERTHA | | Plan Coordinator (Main) | 1925984 |
Electrical | Original | D | 11/9/2023 | BERTHA | BERTHA | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 1925983 |
Electrical (Main) | Original | / | 11/9/2023 | BERTHA | BERTHA | In Current Review by BERTHA | | Electrical (Main) | 1925765 |
Electrical (Main) | Original | / | 11/8/2023 | | SCANNING | Location = Electrical (Main) by SCANNING | | Electrical (Main) | 1925410 |
Plan Coordinator (Main) | Original | / | 11/8/2023 | | JUSTINL | Location = Plan Coordinator (Main) by JUSTINL | | Plan Coordinator (Main) | 1925359 |
Construction | Original | D | 11/8/2023 | JUSTINL | JUSTINL | Preliminary review only: Structure designed for 30lb roof loads. Elevation of home exceeds 7000' in elevation. Structural framing plans and trusses to be updated to meet 40lb roof loads or 57lb ground snow loads. BCI 5000 floor joist max span of 21' - Appears to be exceeded at lower level and main level framing plan. LVL to steel column connections need a design professional stamped detail - no prescriptive code path method. Woodland part requires ice barriers be installed per RBC302.4.42.1 and should be indicated on elevation pages. (No walk ) 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 1925355 |
Energy | Original | / | 11/8/2023 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1925236 |
Construction (Main) | Original | / | 11/8/2023 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Construction (Main) | 1925073 |
Energy | Original | / | 11/2/2023 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1922239 |