Energy | Original | D | 2/5/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1959763 |
Electrical | Original | D | 2/5/2024 | RICHG | RICHG | Comply with R404.3 IECC 2021. Exterior lighting controls. Show how they will be controlled. ( photocell, time clock, daylight sensor etc...)
1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 1959762 |
Electronic Plan | Original | / | 2/5/2024 | RICHG | RICHG | In Current Review by RICHG | | Electronic Plan | 1959756 |
Mechanical | Original | A | 2/5/2024 | TCRIPPEN | TCRIPPEN | Approved. | | Mechanical | 1959358 |
WP Fire (CSFD Commercial) | Original | D | 2/5/2024 | DBURGESS | DBURGESS | Pending submittal of ZDP. Disapproved at this time to release plan set to address PPRBD comments. | | WP Fire (CSFD Commercial) | 1959328 |
WP Zoning | Original | D | 2/5/2024 | DBURGESS | DBURGESS | Pending submittal of ZDP. Disapproved at this time to release plan set to address PPRBD comments. | | WP Zoning | 1959327 |
Construction | Original | D | 2/2/2024 | CHRISTINEH | CHRISTINEH | Provide Zoning affidavit for 2nd kitchen / Provide roofing materials to be used / Provide truss calcs 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 1959191 |
Electronic Plan | Original | / | 2/2/2024 | CHRISTINEH | CHRISTINEH | In Current Review by CHRISTINEH | | Electronic Plan | 1958917 |
Plumbing | Original | D | 2/2/2024 | SHANEN | SHANEN | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Plumbing | 1958894 |
WP Floodplain | Original | N | 2/1/2024 | DBURGESS | DBURGESS | Verified not in a floodplain | | WP Floodplain | 1958510 |
WP Enumeration | Original | A | 2/1/2024 | DBURGESS | DBURGESS | Address, owner, parcel number & Tax number verified | | WP Enumeration | 1958509 |
Plumbing | Original | N | 2/1/2024 | TCRIPPEN | TCRIPPEN | No plumbing. | | Plumbing | 1958196 |
Energy | Original | / | 2/1/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1958079 |