Required Departments: 4
|
|
|
Log Entries: 7
|
|
Construction | Original | A | 3/28/2024 | ANDREAL | ANDREAL | Approved. Partial basement finish. | | Construction | 1980575 | Electronic Plan | Original | / | 3/28/2024 | ANDREAL | ANDREAL | In Current Review by ANDREAL | | Electronic Plan | 1980546 | Mechanical | Original | A | 3/21/2024 | RICHG | RICHG | | | Mechanical | 1977503 | Electronic Plan | Original | / | 3/21/2024 | RICHG | RICHG | In Current Review by RICHG | | Electronic Plan | 1977494 | Energy | Original | N | 3/19/2024 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 1976001 | Health Dept. | Original | / | 3/19/2024 | SYSTEM | SYSTEM | Health dept review is required for a residential addition, basement finish, or interior remodel for properties that have a septic system. | | Health Dept. | 1975999 | Floodplain | Original | N | 3/19/2024 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 5228009013) | | Floodplain | 1976000 |
|
| |
|