Required Departments: 4
|
|
|
Log Entries: 4
|
|
Manitou Zoning | Original | D | 6/25/2024 | MSZONING | MSZONING | Does not meet setbacks and does not have proper approvals from CoMS. The applicant has been notified that a Variance, Minor Site Plan, and Property Improvement Permit are required. | eringsred | Manitou Zoning | 2024274 | Construction | Original | D | 3/22/2024 | CGIECK | CGIECK | will consult with structural engineer for deck prior to permit 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 1978457 | Energy | Original | N | 3/22/2024 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 1978429 | Floodplain | Original | N | 3/22/2024 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 7408201005) | | Floodplain | 1978428 |
|
| |
|