Woodmoor Water | Original | N | 4/30/2024 | WOODWATER | WOODWATER | No water or sewer addition to garage, and the location of the garage addition does not appear to interfere with the location of existing water or sewer service lines indicated in our records. Woodmoor WSD does not need to inspect. | wwsdengineer | Woodmoor Water | 1996619 |
County Zoning | Original | A | 4/25/2024 | DSDYOUNGER | DSDYOUNGER | Addition Approved (see full review) | | County Zoning | 1994640 |
Mechanical | Original | A | 4/25/2024 | DALEH | DALEH | Plans did not indicate gas or electric heat Review was based on gas heat | | Mechanical | 1994371 |
Zoning/Planning | Original | / | 4/24/2024 | DSDYOUNGER | DSDYOUNGER | In Current Review by DSDYOUNGER | | Zoning/Planning | 1993759 |
Construction | Original | A | 4/24/2024 | SHELLEY | SHELLEY | | | Construction | 1993747 |
Submittal 2 | Original | / | 4/24/2024 | QUINTONW | QUINTONW | Submittal #2 | | Submittal 2 | 1993635 |
Mechanical | Original | D | 4/19/2024 | BPHILLIPS | BPHILLIPS | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Mechanical | 1991533 |
Woodmoor Water | Original | D | 4/18/2024 | WOODWATER | WOODWATER | Would like to see architectural plans so can verify if there is plumbing addition or not, as well as a more developed site plan to ensure the building extension will not be built on top of existing water or sewer infrastructure. | wwsdengineer | Woodmoor Water | 1991402 |
County Zoning | Original | D | 4/18/2024 | DSDYOUNGER | DSDYOUNGER | Provide ACC approval letter. | | County Zoning | 1990851 |
Construction | Original | D | 4/18/2024 | SHELLEY | SHELLEY | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 1990784 |
Electronic Plan | Original | / | 4/18/2024 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Electronic Plan | 1990775 |
Energy | Original | N | 4/16/2024 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 1989761 |
Water Division | Original | / | 4/16/2024 | SYSTEM | SYSTEM | Parcel 7101304006 is within WOODMOOR WATER & SANITATION. Water Review is required for Addition and Detached structures. | | Water Division | 1989760 |
Floodplain | Original | N | 4/16/2024 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 7101304006) | | Floodplain | 1989759 |