Floodplain | Original | N | 4/24/2024 | AMY | AMY | Per site plan provided the structure is not in the Floodplain. | | Floodplain | 1994142 |
Energy | Original | N | 4/24/2024 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 1994139 |
Energy | Original | D | 4/24/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1994138 |
Construction | Original | D | 4/24/2024 | SHELLEY | SHELLEY | needs stamped plans, metal building. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 1994137 |
Out to Review | Original | / | 4/24/2024 | JACKIEP | JACKIEP | VICTOR WALKING | | Out to Review | 1994127 |
Energy | Original | / | 4/24/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1994122 |
Floodplain | Original | / | 4/24/2024 | RBD GIS | RBD GIS | Autogenerated Review: Parcel intersects with 100 Year Floodplain. (Parcel: 4319001033) | | Floodplain | 1994121 |