Finished Bin (Main) | Original | / | 11/22/2024 | | SCANNING | Location = Finished Bin (Main) by SCANNING (small bin) | | Finished Bin (Main) | 2089028 |
Stormwater | Original | D | 11/1/2024 | JLANDON | JLANDON | Include: Stockpile - it must be inside the LOD Flow arrows PE signature and stamp . | | Stormwater | 2080222 |
Stormwater | Original | / | 10/29/2024 | | SCANNING | Location = Stormwater by SCANNING | | Stormwater | 2078824 |
Plan Coordinator | Original | / | 10/29/2024 | | KSCHOTT | Location = Plan Coordinator by KSCHOTT | | Plan Coordinator | 2078633 |
CO Springs DRE | Original | D | 10/29/2024 | KSCHOTT | KSCHOTT | Cannot approve this permit until the entitlement currently under review is approved by Land Use Review (DEPN-24-0148). Once entitlement is approved, please include that approval letter and stamped DP modification with your permit resubmittal. (see full review) | | CO Springs DRE | 2078632 |
Zoning/Planning | Original | / | 10/28/2024 | KSCHOTT | KSCHOTT | In Current Review by KSCHOTT | | Zoning/Planning | 2077919 |
Zoning/Planning | Original | / | 10/28/2024 | | SCANNING | Location = Zoning/Planning by SCANNING | | Zoning/Planning | 2077910 |
Plan Coordinator (Main) | Original | / | 10/28/2024 | | JUSTINL | Location = Plan Coordinator (Main) by JUSTINL | | Plan Coordinator (Main) | 2077904 |
Construction | Original | D | 10/28/2024 | JUSTINL | JUSTINL | Due to the size and construction, gate shop drawings must be stamped by licensed design professional. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 2077903 |
Construction (Main) | Original | / | 10/25/2024 | | JANE | Location = Construction (Main) by JANE | | Construction (Main) | 2077706 |
Submittal 2 | Original | / | 10/25/2024 | DANM | DANM | Submittal #2 | | Submittal 2 | 2077663 |
Out to Review | Original | / | 8/22/2024 | RITA | RITA | Vince Colarelli 719-331-7701 | | Out to Review | 2050513 |
Stormwater | Original | D | 8/20/2024 | JLANDON | JLANDON | A disclaimer statement that no grading or vegetation removal is allowed is required if that is the case. If there will be grading, include the following on the Hillside site plan: -Show and label Limits of Disturbance. -Show and label existing and proposed contours (min. 2') and label with elevations. -Show and label soil stockpile within limits of disturbance. -Show stormwater flow arrows. -Include contours, flow arrows, etc. in legend. -PE sign and stamp. | | Stormwater | 2049358 |
Stormwater | Original | / | 8/19/2024 | | SCANNING | Location = Stormwater by SCANNING | | Stormwater | 2048594 |
Plan Coordinator | Original | / | 8/19/2024 | | KSCHOTT | Location = Plan Coordinator by KSCHOTT | | Plan Coordinator | 2048546 |
CO Springs DRE | Original | D | 8/19/2024 | KSCHOTT | KSCHOTT | The proposed 12' gate is in the public right of way and not within property boundaries. However per UDC 7.4.203.A "fence (or gate) is allowed in required setback IF 7' or less in height REARWARD of the front building facade or 4' or less in height FORWARD of front building facade" Y our proposal for gate in front of facade at 12' height (must be 4' height) would require a nonuse variance application to Planning Commission for determination of approval/denial. Please submit a pre application meeting on our website to discuss options at coloradosprings.gov/preapp Informational: Please note that because this lot is within the hillside overlay; no land disturbance (including vegetation removal, excavation, grading) can occur until building permit is approved and includes an approved hillside site plan. Hillside inspections will occur throughout the permitting and construction process to ensure compliance with the hillside site plan (see full review) | | CO Springs DRE | 2048545 |
Zoning/Planning | Original | / | 8/14/2024 | KSCHOTT | KSCHOTT | In Current Review by KSCHOTT | | Zoning/Planning | 2046399 |
Zoning/Planning | Original | / | 8/13/2024 | | NELIDA | Location = Zoning/Planning by NELIDA | | Zoning/Planning | 2046250 |
Plan Coordinator (Main) | Original | / | 8/13/2024 | | JUSTINL | Location = Plan Coordinator (Main) by JUSTINL | | Plan Coordinator (Main) | 2046117 |
Construction | Original | D | 8/13/2024 | JUSTINL | JUSTINL | Plans indicate gate is pre-manufactured. No structural or architectural plans provided for gate. If gate is less than 7' high, then no permit is required. If Gate exceeds 7' high, provide architectural and structural plans. ( WALK OK ) 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 2046116 |
Construction (Main) | Original | / | 8/13/2024 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Construction (Main) | 2045749 |
Construction (Main) | Original | / | 8/2/2024 | | SCANNING | Location = Construction (Main) by SCANNING | | Construction (Main) | 2041368 |
Energy | Original | N | 8/2/2024 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 2041326 |
Stormwater | Original | / | 8/2/2024 | SYSTEM | SYSTEM | Parcel 7501205003 is within the Hillside Overlay (HS). Stormwater Review is required. | | Stormwater | 2041325 |
Floodplain | Original | N | 8/2/2024 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 7501205003) | | Floodplain | 2041324 |