| Original | / | 11/12/2024 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2084277 |
| Original | / | 11/12/2024 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2084270 |
Submittal 4 | Original | / | 11/12/2024 | BRIANNAM | BRIANNAM | Submittal #4 | | Submittal 4 | 2084269 |
CO Springs DRE | Original | D | 11/1/2024 | PDOSCH | PDOSCH | LOD, PAE, and temporary erosion control measures, Hillside Overlay Inspection 2, is compliant (see full review) | | CO Springs DRE | 2080624 |
CO Springs Fire | Original | D | 11/1/2024 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | chiptaylor | CO Springs Fire | 2080356 |
CO Springs DRE | Original | D | 10/25/2024 | KSCHOTT | KSCHOTT | 1. Sign/date HS certification statement 2. Each elevation drawing needs to have the max allowable height envelope shown of 20' from each existing grade line. (Should be parallel to the existing grade line) 3. LOD inspection - inspection occured on 10/25/24 but did not pass because LOD fencing was not in place according to plan.
Informational: Please note that because this lot is within the hillside overlay; no land disturbance (including vegetation removal, excavation, grading) can occur until building permit is approved and includes an approved hillside site plan. Hillside inspections will occur throughout the permitting and construction process to ensure compliance with the hillside site plan (see full review) | | CO Springs DRE | 2077814 |
Zoning/Planning | Original | / | 10/22/2024 | KSCHOTT | KSCHOTT | In Current Review by KSCHOTT | | Zoning/Planning | 2075762 |
City Engr | Original | D | 10/22/2024 | JDAGNILLO | JDAGNILLO | Please address this remaining comment: Upload a copy of the City-signed Geological Hazard Report (Project Dox #STM-REV24-1096) into this electronic building permit plan set. Report was signed by the City October 1, 2024. Thank you. | | City Engr | 2075650 |
Construction | Original | A | 10/22/2024 | SHELLEY | SHELLEY | | | Construction | 2075587 |
| Original | / | 10/22/2024 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2075482 |
| Original | / | 10/21/2024 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2074927 |
Submittal 3 | Original | / | 10/21/2024 | BRIANNAM | BRIANNAM | Submittal #3 | | Submittal 3 | 2074926 |
CO Springs Fire | Original | D | 10/11/2024 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | Jacob.Watson | CO Springs Fire | 2071424 |
CO Springs DRE | Original | D | 10/3/2024 | KSCHOTT | KSCHOTT | 1. Please identify on Hillside Site Plan if the trees within the limit of disturbance boundary will be preserved or removed 2. Elevation drawings: each elevation needs a labeled existing grade line (they should not be the same line as the finished grade line) and each elevation needs to show the max allowable height envelope of 20' measured from those existing grade lines 3. LOD inspection required prior to permit approval. contact patrick.dosch@coloradosprings.gov Informational: Please note that because this lot is within the hillside overlay; no land disturbance (including vegetation removal, excavation, grading) can occur until building permit is approved and includes an approved hillside site plan. Hillside inspections will occur throughout the permitting and construction process to ensure compliance with the hillside site plan (see full review) | | CO Springs DRE | 2067725 |
City Engr | Original | D | 10/1/2024 | JDAGNILLO | JDAGNILLO | 1. Please upload a copy of the City-signed Geological Hazard Report (Project Dox #STM-REV24-1096) into this electronic building permit plan set. Thank you.
2. Add the following disclosure statement to the hillside site plan: "This property is subject to the findings summary and conclusions of a Geologic Hazard Study prepared by Rocky Mountain Group – RMG, dated August 1, 2024 which identified the following specific geologic hazards on the property: compressible soils, mapped within the landslide susceptibility and steeply dipping bedrock zone, uncontrolled fill, radon and seismicity. A copy of said report is to be placed within the City of Colorado Springs Community Development Department. Contact Community Development, 30 South Nevada Avenue, Suite 105, Colorado Springs, CO, if you would like to review said report." | | City Engr | 2066510 |
Zoning/Planning | Original | / | 9/30/2024 | KSCHOTT | KSCHOTT | In Current Review by KSCHOTT | | Zoning/Planning | 2066042 |
Construction | Original | D | 9/30/2024 | SHELLEY | SHELLEY | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 2066026 |
Submittal 2 | Original | / | 9/30/2024 | BRIANNAM | BRIANNAM | Submittal #2 | | Submittal 2 | 2066015 |
CO Springs Fire | Original | D | 9/10/2024 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | rpeterson | CO Springs Fire | 2058324 |
CO Springs DRE | Original | D | 9/3/2024 | KSCHOTT | KSCHOTT | 1. The Hillside Site plan needs to be stamped by a Professional ENGINEER licensed by the state of colorado 2. Include the hillside certification statement on site plan (from the checklist) and sign/date 3. Must show proposed grade lines on site plan and show (EG)/FG - existing grade and finished grade values at corners of proposed garage (limit cut/fill to no more than 5') 4. In legend: include a contractor email address, change R HS zoning to R-E HS zoning under UDC code and adjust setbacks in legend for a DETACHED structure to be 20' front, 10' side, 10' rear 5. Show a limit of disturbance boundary around all land disturbance and proposed construction 6. Show a stockpile location within LOD boundary 7. Identify trees to be preserved and what to be removed (to meet fire vegetation requirements, usually trees within 15' need to be removed unless identified as a character tree). Include the vegetation assessment fee table from the hillside checklist on this site plan 8. LOD inspection required by contacting patrick.dosch@coloradosprings.gov 9. In legend, please identify existing garage sf with the proposed garage sf not to exceed 1650 sf and identify total number of doors between existing and proposed (example: 1 double door existing and 1 double door proposed) 10. elevation drawings need to show existing grade lines with values to match the site plan and the max allowable height of 20' envelope shown from EXISTING grade 11. is there an existing carport? Be sure carport sf and all decks 8' in height/and or covered are also included in the lot coverage calculation table. Also el paso county assessors has 2,837 sf for first floor area AND existing garage sf 869 sf AND carport sf to be 350 sf (all of which needs to be specified in lot coverage calc table) Informational: Please note that because this lot is within the hillside overlay; no land disturbance (including vegetation removal, excavation, grading) can occur until building permit is approved and includes an approved hillside site plan. Hillside inspections will occur throughout the permitting and construction process to ensure compliance with the hillside site plan (see full review) | | CO Springs DRE | 2054938 |
Stormwater | Original | N | 8/30/2024 | JLANDON | JLANDON | | | Stormwater | 2054310 |
City Engr | Original | D | 8/29/2024 | JDAGNILLO | JDAGNILLO | Geological hazard report has been submitted in Project Dox (#STM-REV24-1096) and is currently being reviewed by CGS and the City. CGS comments are due back 9-19-24 and will be communicated directly in Project Dox. | | City Engr | 2053584 |
Zoning/Planning | Original | / | 8/29/2024 | KSCHOTT | KSCHOTT | In Current Review by KSCHOTT | | Zoning/Planning | 2053373 |
Mechanical | Original | N | 8/29/2024 | TREVORH | TREVORH | Not Applicable; Garage Unheated. | | Mechanical | 2053213 |
Zoning/Planning | Original | / | 8/28/2024 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2053121 |
Construction | Original | D | 8/28/2024 | SHELLEY | SHELLEY | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 2053088 |
Electronic Plan | Original | / | 8/28/2024 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Electronic Plan | 2053040 |
Energy | Original | N | 8/20/2024 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 2048837 |
Fire | Original | / | 8/20/2024 | RBD GIS | RBD GIS | Parcel 7435307016 is within the Wildland Urban Interface (WUI). Fire Department Review is required. | | Fire | 2048834 |
Stormwater | Original | / | 8/20/2024 | SYSTEM | SYSTEM | Parcel 7435307016 is within the Hillside Overlay (HS). Stormwater Review is required. | | Stormwater | 2048835 |
Floodplain | Original | N | 8/20/2024 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 7435307016) | | Floodplain | 2048836 |