Required Departments: 3
|
|
|
Log Entries: 4
|
|
Construction | Original | D | 11/5/2024 | BPHILLIPS | BPHILLIPS | Revise climatic design criteria. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 2081738 | Out to Review | Original | / | 11/5/2024 | JACKIEP | JACKIEP | PAULA WALKING | | Out to Review | 2081716 | Energy | Original | N | 11/5/2024 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 2081714 | Floodplain | Original | N | 11/5/2024 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6114015009) | | Floodplain | 2081713 |
|
| |
|