Required Departments: 4
|
|
|
Log Entries: 5
|
|
Construction | Original | D | 11/11/2024 | CHRISTINEH | CHRISTINEH | Show layout of fixtures in new bathroom 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 2083656 | Energy | Original | N | 11/11/2024 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 2083653 | Electronic Plan | Original | / | 11/11/2024 | CHRISTINEH | CHRISTINEH | In Current Review by CHRISTINEH | | Electronic Plan | 2083652 | Energy | Original | / | 11/5/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2081749 | Floodplain | Original | N | 11/5/2024 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 7312204082) | | Floodplain | 2081748 |
|
| |
|